| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹13,800
Closing Date
16 Dec 2024, 11:05 amClosed
EE(SDW) IX
RITHALA STP SEC 11 ROHINI DELHI
Repair of standard capacitors make APFC panel installed at Sector-17sps
2024_DJB_266079_1
NITNO6SDWIX
Open Tender
Miscellaneous Works
Works
30 days
RITHALA STP SEC 11 ROHINI DELHI
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB SAB PAISA
₹13,800
19 Dec 2024
7 Dec 2024
16 Dec 2024
7 Dec 2024
16 Dec 2024
7 Dec 2024
Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of APFC relay, indications lights, meters, A/M switches, MCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site.
Providing Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable and entry, mounting structure and hardware etc. – Make Standard
Banking of capacitors of various capacities with multistrand copper wires & lugs/ aluminum bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Providing of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor, Make standard.
Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies.
Replacement of defective capacitor duty contractors suitable for 25 KVAr capacitor with new capacitor duly contractor. Make standard
Replacement of defective capacitor duty contractors suitable for 15 KVAr capacitor with new capacitor duty contractor. Make standard
Replacement of defective capacitor duty contactors suitable for 12.5 KVAr capacitor with new capacitor duty contactor. Make Standard
Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank- make Standard
Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank- make Standard
Replacement of defective/ burnt out LED indication lights of various colours with new indication lights, make- Standard
Power wiring with 10 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site.
Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure/ structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site.
Serviciving of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonizing of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site.
Testing & commissioning of complete APFC Panel installation including following: 01. Meggering of complete capacitor installation using 500V megger 02. Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. 03. Checking function and efficiency of various components of APFC panel
Monitoring of power factor during warranty period including checking of efficiency of capacitors and other equipment to ensure that APFC panel is working to its highest capacity for achieving target power factor.
Checking of capacitors and dismantling of defective capacitors from static capacitor banks including dismantling of terminations, wirings, hardware, as required at site.
Providing Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc.- Make Standard
Banking of capacitors of various capacities with multistrand copper wires & lugs/ aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Replacement of defective triple pole MCCB of 63 A capacity with new MCCB for operation and safety of capacitor bank- make Standard
Power wiring with 6 sq. mm for connection between capacitors and bus bar with copper lugs and necessary hardware etc. as required at site.
Installation and connection of various components as described above in static capacitor banks using necessary hardware, mounting arrangement and termination with multistrand copper wires, lugs and tapes etc. as required at site
Servicing & commissioning of static capacitor banks including complete dusting, tightening of all connections, cleaning of electrical terminations, megger testing and re-commissioning of capacitor banks
bhawani electrical system (BID ID -1550380)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .