| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAccepted-AOC DINDIGUL | DINDIGUL | DINDIGUL | TAMIL NADU | ₹4.8 Cr Quoted ₹4.9 Cr | L1 | Accepted-AOC Lowest Bidder accepted for AOC |
| 2 | L2₹5.0 Cr+₹9.8 L (1.99%)Rejected-AOC | ₹5.0 Cr+₹9.8 L (1.99%) | L2 | Rejected-AOC Second Lowest Bidder Rejected. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | M.mohamedyunussaleem L2 | VMSI Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle and destroying the same effectively and etc., Complete Complying with standard specification and as directed by departmental officers. | 1,03,128 | m2 | 6.7 ₹6,90,957.6 | 6.5 ₹6,70,332 Lowest |
| 2.00 | Earthwork deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete complying with standard specfication and as directed by the departmental officers having width up to 3m | 4,845 | m3 | 40 ₹1,93,800 | 39 ₹1,88,955 Lowest |
| 3.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning, Power roller and also ensuring compaction of earth fill for side slope etc., complete complying with standard specification and as directed by the departmental officers. (Bund Strengthening) | 39,640 | m2 | 130 ₹51,53,200 | 127 ₹50,34,280 Lowest |
| 4.00 | Dismantling, clearing away and carefully stacking materials useful for reuse any thicknees of Stone masnory in cement mortar walls under 3m high. Complete, complying with standard specifications and as directed by the engineer in charge of the work. | 935 | m3 | 310 ₹2,89,850 | 305 ₹2,85,175 Lowest |
| 5.00 | Dismantling clearing away and carefully stacking the materials useful for reuse for any 3 thickness of plain cement concrete as directed by the departmental officers and complying with standard specification and as directed by the engineer in charge of the work. | 119 | m3 | 550 ₹65,450 | 530 ₹63,070 Lowest |
| 6.00 | Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2m in sand silt or other loose soil wet sand or silt not under water light black cotton soil sandy loam and ordinary soil including excavated earth complying with standard specification and as directed by the departmental officers. (SS20B) - Open Excavation | 11,712 | m3 | 190 ₹22,25,280 | 187 ₹21,90,144 Lowest |
| 7.00 | Earth work excavation and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar not requing blasting and depositing on bank for foundation including refilling the sides of foundation with excavated earth, shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers and clearing, levelling the site etc., complying with standard specification and as directed by the departmental officers. (Narrow foundation) | 1,946 | m3 | 435 ₹8,46,510 | 420 ₹8,17,320 Lowest |
| 8.00 | Supplying and filling with M-Sand sand for inveltor filter in layers of not more than 15 cm thick, well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers | 174 | m3 | 1,900 ₹3,30,600 | 1,850 ₹3,21,900 Lowest |
| 9.00 | Providing and placing Plain Cement concrete of M10 grade (Design mix) using crusher broken hard coarse aggregate (well graded) of nominal maximum size of 40mm confirming to IS specified grading(to achieve the specified characteristic strength of 10N/mm2 in 28 days) and mixing the ingredients in mixer including dewatering of the placement site by bailing/pumping and diverting wherever necessary, placing concrete in layers and water curing, finishing the surface with all leads and lifts etc., complete in all respects so as to attain the profile and strength specified in the approved drawing and specifications as per the direction of the Engineer in charge of works and complying with technical specifications. | 410 | m3 | 6,100 ₹25,01,000 | 6,000 ₹24,60,000 Lowest |
| 10.00 | Providing steel centering for cement concrete block, column, footing, pedestal, plinth beam, grade beam etc., which require nominal strutting etc., using MS sheets 10 gauge thick of size 90cm x 60cm stiffened with MS angle of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5cm spaced at 90cm c/c duly supported and removing the strutting after specified period without damaging the concrete laid complete complying with standard specification and as directed by the departmental officers.Scaffolding and centering charges for the structural components is including the cost and conveyance of all material to the site including all labour charges and incidental charges etc., complete complying with standard specifications and as directed by the Engineer in charge. | 1,326 | m2 | 1,000 ₹13,26,000 | 985 ₹13,06,110 Lowest |
Tender Value
₹4.8 Cr
EMD Value
₹2.5 L
Closing Date
16 Sept 2025, 3:00 pmClosed
Superintending Engineer
O/o Superintending Engineer, WRD, Amaravathi Basin Circle, Palani.
Reconstruction of Damaged Sluices
2025_WRD_598706_1
NIT 4/3
Open Tender
Civil Works - Water Works
Lump-sum
365 days
Palani Taluk in Dindigul District.
As per the Tender Conditions.
8 documents required · 8 mandatory
₹0
₹2.5 L
1 Dec 2025
1 Sept 2025
16 Sept 2025
1 Sept 2025
16 Sept 2025
1 Sept 2025
Amount
Clearing scrub jungle and destroying the same effectively and etc., Complete Complying with standard specification and as directed by departmental officers.
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete complying with standard specfication and as directed by the departmental officers having width up to 3m
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning, Power roller and also ensuring compaction of earth fill for side slope etc., complete complying with standard specification and as directed by the departmental officers. (Bund Strengthening)
Dismantling, clearing away and carefully stacking materials useful for reuse any thicknees of Stone masnory in cement mortar walls under 3m high. Complete, complying with standard specifications and as directed by the engineer in charge of the work.
Dismantling clearing away and carefully stacking the materials useful for reuse for any 3 thickness of plain cement concrete as directed by the departmental officers and complying with standard specification and as directed by the engineer in charge of the work.
Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2m in sand silt or other loose soil wet sand or silt not under water light black cotton soil sandy loam and ordinary soil including excavated earth complying with standard specification and as directed by the departmental officers. (SS20B) - Open Excavation
Earth work excavation and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar not requing blasting and depositing on bank for foundation including refilling the sides of foundation with excavated earth, shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers and clearing, levelling the site etc., complying with standard specification and as directed by the departmental officers. (Narrow foundation)
Supplying and filling with M-Sand sand for inveltor filter in layers of not more than 15 cm thick, well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers
Providing and placing Plain Cement concrete of M10 grade (Design mix) using crusher broken hard coarse aggregate (well graded) of nominal maximum size of 40mm confirming to IS specified grading(to achieve the specified characteristic strength of 10N/mm2 in 28 days) and mixing the ingredients in mixer including dewatering of the placement site by bailing/pumping and diverting wherever necessary, placing concrete in layers and water curing, finishing the surface with all leads and lifts etc., complete in all respects so as to attain the profile and strength specified in the approved drawing and specifications as per the direction of the Engineer in charge of works and complying with technical specifications.
Providing steel centering for cement concrete block, column, footing, pedestal, plinth beam, grade beam etc., which require nominal strutting etc., using MS sheets 10 gauge thick of size 90cm x 60cm stiffened with MS angle of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5cm spaced at 90cm c/c duly supported and removing the strutting after specified period without damaging the concrete laid complete complying with standard specification and as directed by the departmental officers.Scaffolding and centering charges for the structural components is including the cost and conveyance of all material to the site including all labour charges and incidental charges etc., complete complying with standard specifications and as directed by the Engineer in charge.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29m height for vertical / sloped surface as detailed below with all cross bracings using mild steel sheets of size 90cm x 60cm and 10BG Stiffened with welded mild steel angle of size (25x25x3)mm laid over silver oak joists of size 10x 6.5cm spaced at about 90cm c/c and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75cm c/c etc.,complete complying with standard specifications and as directed by departmental officers.Scaffolding and centering charges for the structural components is including the cost and conveyance of all materials to the site including all labour charges and incidental charges etc., complete complying with standard specifications and as directed by the Engineer in charge. (for vertical wall surface)
Providing and Laying in position, Plain Cement Concrete of M 15 grade (Design Mix) with well graded aggregates and the maximum nominal size of HBGS jelly of 40mm and down graded (60% of 40 mm and 40% of 20mm) confirming to IS specified grading and mixing by mixer machine ( to produce concrete of the specified characteristic strength of 15N/mm2 at 28 days) including dewatering by bailing/ pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts, vibrating, compacting, and finishing the surface, watering, curing, for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the departmental officers and complying with standard specification.
Supply and fabricating of steel required for all RCC works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills including over lapping to the required length wherever necessary and placing reinforcement in position as specified in the drawing including cost of binding wire provision for space bar cover blocks and all other incidental charges etc., directed by the departmental officers.
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m³ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. ( No separate payment will be made by the Department for the excess usage of materials).
Providing and Laying in position, Plain Cement concrete M 15 grade (Design Mix) with well graded aggregates and the maximum nominal size of HBGS jelly of 20mm and down graded to IS specified grading and mixing by mixer machine ( to produce concrete of the specified characteristic strength of 15 N/mm2 at 28 days) including dewatering by bailing/pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts,without vibrating, compacting and finishing the surface watering, curing for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the departmental officers and complying with standard specification.
Rough stone dry packing for Revetment using old hard granite stones including cost of wedges for filling the gaps, including cost of materials, conveyance and all labour charges etc in complete complying with standard specification and in layers with standard specification and as directed by the departmental officers.
Supplying and fixing Vent Stone of size 1.35x1.35x0.30 m (1350 x 1350 x 300) mm dressed, Vent size to be adopted as per memour including all operations necessary for placement and finishing. The work includes the supply of Vent Stone of approved quality, color, and type, free from cracks, weathering, and other defects. Stones shall be roughly dressed to uniform size and shape, and fixed in position true to line, level, and plumb, as per site instructions. The item includes the cost of conveyance of materials from the source to site, loading, unloading, stacking, dressing, and fixing in place with all necessary tools, equipment, and labour. Including scaffolding, surface preparation, finishing, and site cleaning, are deemed to be included. The rate quoted shall be inclusive of all material costs, labour, tools, machinery, etc., to complete the work in all respects. Complete as directed by the Engineer in charge of work complying with the standard specification.
Fabricating, Supplying and erection of Screw gearing steel shutters of size above upto 1.00 m width consist shutters of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 65x65x6mm mild steel Angle at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipment. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc.,complete.
Fabricating, Supplying and erection of Screw gearing steel shutters of size above 1.00 m and upto 2.00m width consist of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 100x50mm mild steel channel at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm thick mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipment. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc.,complete.
Fabricating, supplying and fixing of 63mm dia Screw Rod made up of Mild Steel duly machined and fully threaded to suit the Head set Assembly and provided with required holes. Conveying and leading the screw rod to the worksite. Fixing the screw rod to the shutter gusset plate with required bolt and nut in proper alignment to the head set including dismantling the existing damaged screw rod,conveying and stacking at section store. The Screw rod should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for all fabricating and hoisting equipments, conveyance charges for labours and materials and warranty for 5 years etc., complete
Fabricating, supplying and fixing of Shutter Groove Angle made up of 100x100x10mm Mild Steel angle for required height including welding hold fast of size 40x40x6mm Mild steel angle 3 Nos on both sides and conveying and leading the groove angle to the vents. Fixing the angle to the grooves in proper alignment including dismantling the existing damaged groove angles, conveying and stacking at section store. The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, consumables, labours, charges for all fabricating and hoisting equipments, conveyance, petty civil works and warranty for 5 years etc., complete.
Supplying and fixing of Head Set Assembly medium duty with hexagonal nut (Approximate 70 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assembly to the work site. Fixing the head set assembly to the top beam by using required rust fre bolts and nuts in proper alignment including dismantling the existing damaged Head set assembly, conveying and stacking at sectio store. The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc., complete.
Fabricating, Supplying and fixing of Top Beam made up of 200x100mm (ISMB 200) duly drilled to suit the Head Set Assembly with required bed bolt made out of 25mm mild steel round rod duly threaded with suitable anchorage arrangements to a height of 0.60m with necessary Fish plate made out of 16mm mild steel plate of size 0.20x 0.30m 2 Nos with required holes. Conveying and leading the top beam arrangements to the work site. Fixing the top beam arrangements at the top of the vent in correct position including dismantling the existing eroded top beam, conveying and stacking and the section stores. The top beam should be painted with two coats of AC black paint over one coat of Red Oxide primer. The Rate including cost of materials, labours, charges for all fabricating and hoisting equipments, cost of petty civil works conveyance charges for labours and materials and warranty for 5 years etc.., complete.
Flush pointing over the Randam Rubble masonary in cement mortor 1:3 (one cement and three P-sand)as per standered specification including racking out the joints to full depth of slab /stone masonary, clearing the joints with wire brush and water etc.,complete comply with standered specification and as directed by the department officers
Drilling holes 50mm dia to a depth of 2m in Hard granite and inserting 25mm dia RTS L shape angle anchor rods of 3m length for holding Foundation and fixing in position and grouting the anchor holes with cement slurry including cost of steel and labour etc., with standard specification and as directed by the Engineer-in-Charge of work.
M.mohamedyunussaleem (BID ID -1460125)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .