Tender Value
₹3.7 L
EMD Value
₹3,800
Closing Date
8 Feb 2022, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Providing PCC pavement below the deluge valves (FDV-108), Hydrant valves (HDV-109) and water monitors in Fuel Oil Pump House area and other miscellaneous civil works in FOPH.
2022_EB_220774_1
SE/Civil/MTPS-II/OT-62/2021-22
Open Tender
Civil Works - Others
Works
90 days
MTPS-II/Mettur Dam-6.
2 documents required · 2 mandatory
₹0
₹3,800
Yes
10 Feb 2022
25 Jan 2022
9 Feb 2022
25 Jan 2022
8 Feb 2022
25 Jan 2022
Amount
Clearing the scrub jungle and disposing the debris to suitable place away from the site as directed by the engineer at site including all labour charges, hire charges for vehicle, tools and plants required, etc., complete.
Levelling the site in all soils except hard rock to a uniform level including clearing the roots of jungle and other plants by uprooting and stacking at one point using JCB and disposing off as directed by the Engineer at site, including cost of labour charges loading, unloading, stacking, lead, lift, hire charges of tools and plants for removal, transporting, disposing off etc., Complete.
Earth work excavation and depositing on bank for laying floor concrete with initial lead of 10m & initial lift of 2m in all types of soil as directed by the Engineer at site including labour charges, tools and plants, lead, lift, etc., complete.
Providing PCC 1:4:8 using 40mm HBG metal for flooring as directed by the Engineer at site, including cost of all materials, labour charges, curing, lead, lift, etc., complete
Providing PCC 1:2:4 using 20 mm HBG metal for providing coping to the steel structures as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc., complete.
Chipping of floor concrete and roughening the surface and removal of debris away from the site, rate including cost of all materials, labour charges, tools and plants ,lead, lift, etc., complete and as directed by Engineer incharge of the work.
Providing PCC 1:1½:3 using 20mm HBG metal for flooring as directed by the Engineer at site including cost of all materials, labour charges, shuttering, curing, lead, lift, etc., complete.
Brick work in CM 1:4 using fly ash bricks of size 23x11x7.50 cm as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, tools and plants, etc., complete.
Plastering in C.M 1:5, 12 mm thick for wall surfaces including cost of all materials, labour charges, curing, tools and plants, lead, lift, etc., complete.
Supplying and fixing in position of PVC water tank of capacity 500 litre, sintex or equivalent make including cost of transporting, lifting, cost of all materials labour charges including fixing, lead, lift, etc., complete.
Supplying and fixing in position of 25 mm dia PVC pipes of approved make with ISI monogram with necessary specials and fittings including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing 25mm dia PVC Ball valve of ISI make as approved by the Engineer in charge including cost of all materials labour charges for fixing, lead, lift, etc., complete.
N NATESAN CONTRACTOR
ARP Engineering Contractor
NVS and Co
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .