Loading…
Loading…
Tender Value
₹69.1 L
EMD Value
₹1.4 L
Closing Date
16 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TECH SIG
17 conditions · 2 needing a document upload
: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIII given in tender document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-I of GCC-2022, with up to date correction slip.
If the tenderer submits/ upload Audited Balance sheet duly certified by a chartered accountant to fulfill the Standard Financial Criteria, the tenderer may also submit/ upload Form No. 26AS /16A along with the tender offer to certify the amount of contractual receipt.
(a) The tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% ofadvertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Defination of Similar Work :- Any RRI/PI/EI/MACLS Supply, Installation Testing, Commissioning Signalling work OR Any RRI/PI/EI/MACLS Alterations Signalling work OR Any CTC/TMS Work
Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing.
Note: A work experience certificate from a private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. As per Clause No. 10.1 of Tender Form (second Sheet) of Annex.I of Part-I of GCC-2022, with up to date correction slip
15 conditions · 5 needing a document upload
The tenderer must opt for payment by letter of credit (LC) as per the Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.18.
Tenderers are required to quote their Permanent Account Number in the tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
No garbage, dry leaves, paper, grass, bushes, or any other items shall be burnt. They shall only be disposed of at the nominated disposal point by prescribed methods, duly observing the Municipal Solid Wastes (Management and Handling) Rules, 2000 indicates under Schedule II- Management of Municipal Solid Wastes: Para I.I vii that Waste(garbage, dry leaves) shall not be burnt. Any violation of the provisions of the MSW rules,2000, attracts the penal provisions of the Environment(Protection) ACT,1986.CPCB and SPCBs have also issued various guidelines/orders against the practice of such open burning. If the contractor or anybody deployed by him for this work is found guilty of unregulated open burning of plastic, rubber, waste, and similar substances, a fine of Rs. 5000/- on each occasion shall be imposed in addition to the other rights and remedies available in the contract. The decision of the Engineerin-Charge shall be final and binding in this regard.
The EI alteration work is to be carried out at the Charkhi Dadri (CKD) station on the RE-HSR section of the Bikaner Division. The EI alteration work is related to the extension of the existing Track Machine Siding. The Mini-Plan of the CKD station is attached to the document. EI OEM of GAMI station - M/s SIEMENS RAIL AUTOMATION PVT LTD - BANGALORE
S&T associated work for EI alteration at Charkhi Dadri (CKD) station in connection with the provision of TMS siding and shifting of S&T utilities for the extension of existing TMS siding at various stations over Bikaner Division."
SnT-BKN-2026-27-06
SnT-BKN-2026-27-06
Open
Works - General
12 Months
Bikaner, Rajasthan
₹0
₹1.4 L
16 Jun 2026
13 May 2026
2 Jun 2026
121 items across 14 schedules · ₹55,26,105.52 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| manufacture and supply of Hot Architecture Electronic (EI) system complete as per specification No. RDSO/SPN/192/2019 Ver. 2 or latest, as per requirement & tentative Signalling Plans & Diagrams. Interlocking (EI) system mainly of Central Processing Equipment, Equipment/Relays etc as per Dual operator Industrial VDU panel (42" LED) with nc y (Hot stand-by dual VDU one system online and other standby mode), All Interfacing suitable for EI, interconnecting and Jumper wires, Industrial grade Terminals (32'' LED with UPS 1 hr back up), required power converters for EI equipments, for EI equipments and Relay Racks, screw less disconnecting type fixture mounting arrangements accessories necessary to make the EI functional as per approved plan. The tenderer should furnish details of cards/ modules/ sub- connectors etc. for each station. 10% Essential spares of the EI subject to minimum one of mainly consisting of processor, module, interface relay etc. Item detailed break up with unit and to be provided in separate (THIS ITEM SHALL BE USED ONLY ALTERTION WORK IN EXISTING EI) RDSO Inspection charges: Railways Payment terms:100% | — | — | — | — | |
| 1 | with routes less than 100(Per be read as Per Vital Bit of | Per Unit | 20.00 | 87,987.65 | 17,59,753 |
| 2 | wiring, programming, testing commissioning of EI equipment as per supply item in item no. 1.7 Chapter 1 of this SOR including from Consignee's depot to works and materials for wiring, testing and grouting, cutting of floors, refilling of the same, re-plastering, CC/ masonry works, fixing/ laying of insulated ladders/ casing- cable trays/ RCC/GI pipes / Cables, of cables with lugs/ connectors, lettering are to be provided/ done contractor for the equipments vide item no. 7 of Chapter 1 of also covers the networking of Data loggers of all the stations to the system to any other places desired by Engineer-in-charge. (THIS BE USED ONLY FOR ALTERTION EXISTING EI) Note: Installation comply to RDSO Technical Advisory STE/E/TAN/3012 dtd. 28.08.2014. wiring, programming, testing commissioning of Operator VDU in Hot with Redundancy. Any Equipments/cards/Modules required for Hot with Redundancy shall be & Installed by the Contractor. also includes supply of Two nos. computer & printer table work station table) and one no make operator chair model Termination of indoor/ PIJF cables room on relays, tag blocks, CT per approved wiring diagram alterations/ modifications as at site. Soldering to be done at all termination. Dressing/ lacing of shall be done neatly with help of thread / plastic self lock strip of size. The tools/ equipments/ simulation boards required for shall be supplied / fabricated by This includes replacement of cards/ LEDs/ equipments going during testing. Necessary power boards with required capacity plugs, surge & lightning protection boxes supplied and installed by the 230V supply shall be arranged In case supplies are required extended, from Power room / relay same shall be extended by the with his own materials such as mm wires, cables, lugs, RCC/GI insulated ladders etc. After ST/LT Factory Acceptance Tests (FAT) & Sheet testing system should be while submitting to Railways, suitable necessary action can be Engineer-in-charge. Inspection: Inspection charges: None terms: 100% after commissioning. | Job | 1.00 | 5,42,784.93 | 5,42,784.93 |
| 3 | work station note book as per Specifications . It also includes Laser Printer (Only branded). The should be capable of the system in case of any in yard interlocking in future. Specifications should be attached tender document by Tendering Inspection: Consignee Inspection None Payment terms: 100% after | Station | 1.00 | 86,892.73 | 86,892.73 |
| 4 | preparation & supply of drawings in print copies and original tracing CAD FORMAT for Electronic at each station. After of the work, the completion incorporating completion details be supplied as per Technical given in tender document Line). The techinical specifications per ANNEXURE 1.13 of SOR. Consignee Inspection charges: Payment terms: 100% after execution | Station | 1.00 | 1,75,967.35 | 1,75,967.35 |
| 5 | of SWR literature in english associated mid-section gate with all corrections as per SWRD & approved SIP. For this all corrections, editing, grammatical etc. are to be carried out and print to be given to railways for before printing, as required for processing of CRS sanction. This also preparation of maintenance cards provided by Rly. Inspection: Inspection charges: None terms:100% after execution. | Station | 1.00 | 3,598.62 | 3,598.62 |
| 6 | of Station Working Rules from hindi and framing out in DIGLOT similar software )as per extant Rly The required SWR in english will by the contractor and has been separately in item no. 1.21 of 1 of this SOR. Inspection: Inspection charges: None terms:100% after execution. | Station | 1.00 | 4,478.18 | 4,478.18 |
| 7 | photocopies & binding of the SWR in English/hindi/Diglot form as per practice. Inspection: Consignee charges: None Payment after execution. | Set | 6.00 | 178.52 | 1,071.12 |
| 8 | in existing relay room includes supply of PVC insulated Railway signalling cable @40<45@Core/40-Core) of (1/0.6) sqmm RDSO Spec.No.IRS/S-76/89 (Amnd.2 for wiring between relay room SM's/Panel room & Relay room to DP in for block working. This also supply of PVC insulated jumper multi strand 16/.2 mm, tinned in all as per RDSO Specn.No.IRS-S- or latest). This item will bringing all the power supplies from to respective bus bars on relay using 10/6 sqmm copper flexible per instructions of engineer This will include wiring between panel and relay room if required. All be done as per standard practice Western Railway with neat & threading. The item includes wiring of tag block, fuse with and ND Type) and all other material required for complete wiring in relay room. Inspection: Inspection charges: None terms:100% after commissioning. | Per Relay | 10.00 | 524.1 | 5,241 |
| Schedule total | ₹25,79,786.93 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCCS11.pdf
ATTACHMENT
GCCCS2.pdf
ATTACHMENT
GCCCS8.pdf
ATTACHMENT
GCCCS5.pdf
ATTACHMENT
GCCCS3.pdf
ATTACHMENT
GCCCS1.pdf
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCCS7.pdf
ATTACHMENT
GCCCS6.pdf
ATTACHMENT
GCCCS9.pdf
ATTACHMENT
GCCCS4.pdf
ATTACHMENT
GCCCS10.pdf
ATTACHMENT
CKDPlan.pdf
ATTACHMENT
SnT-BKN-2026-27-06.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .