| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance | L1 | Accepted-Finance COMPLETE IN ALL RESPECTS | |
| 2 | L2₹2.5 L+₹34,152 (15.7%)Accepted-Finance | L2 | Accepted-Finance COMPLETE IN ALL RESPECTS | |
| 3 | L3₹2.8 L+₹64,740 (29.7%)Accepted-Finance | L3 | Accepted-Finance COMPLETE IN ALL RESPECTS | |
| 4 | L4₹2.8 L+₹64,900 (29.8%)Accepted-Finance | L4 | Accepted-Finance COMPLETE IN ALL RESPECTS |
Tender Value
₹2.6 L
EMD Value
₹5,500
Closing Date
19 Aug 2020, 12:00 pmClosed
EXECUTIVE ENGINEER MECHANICAL DIVISION UDHAMPUR
EXECUTIVE ENGINEER OMARA MORH MECHNAICAL DIVISION UDHAMPUR
General Overhauling and major repairs with replacement of defective parts of DRR 8545 Wilson
2020_PWDJK_101769_1
MDU / TS / 10 OF 2020 21 DATED 05.08.2020
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
XEN MED UDHAMPUR
₹5,500
Yes
7 Sept 2020
5 Aug 2020
19 Aug 2020
5 Aug 2020
19 Aug 2020
6 Aug 2020
6 Aug 2020 - 11 Aug 2020
Amount
Repairs to Gear Box System of the machine by way of dismantling of gear box towards Speed shaft and removing of worn out old/damaged parts and draining of old gear oil from gear box and then P/F of new parts such as, Speed Wheel 2nd (306-6-1)-1no, Speed Wheel Low (306-6-2)-1no. Speed Wheel Fast (306-6-3)-1no., Bearing Housing with bush(306-6-6/7)-01no.,Bolt (306-6-4)-4no., End Washer (306-6-5)-1no.,Fast Speed Pinion(306-5-1) – 1 No.,Reverse Bevel Pinion(306-2-3) I No. ,oil seal (306-2-13),bearing housing (306-2-1) 1 no.The job includes repairs to speed shaft by way of welding, turning, fabrication of splines with nut and refilling of gear oil after removing its moisture by heating process.Then assembling of complete unit and making proper alignment. The job includes cost of material & labour charges etc.
Repairs to Clutch System of the machine by way of dismantling of both assemblies from R/H & L/H removing of its old damaged parts. The job includes P/F of new parts i.e Plate Floating (306-3-3)-1no., Lever (306-3-4)-3no., Pin for Lever (306-3-5)-3nos., Link Lever (306-3-6)-6no., Collar Assy. (306-3-7)-2no. L/H & R/H Clutch Facing -2set, Bearing Hsg. (306-4-2) 1no.Pinion(306-4-7)Spacer (306-4-4)-1no., Pin Lock Adjusting (306-3-11)-2no., Spring Pin for Lock Adjusting (306-3-14)-2no., Lock Screw (306-4-6)-2nos., Spacer (306-4-17)-2nos. Ball Bearing (306-4-29)-1no., Locking Nut-1no..Bevel Wheel(306-4-1)-02nos.,ball bearing (306-4-27) -2 no., then assembling of R/H & L/H Clutch Assy. (complete unit) and making of proper alignment. The job includes cost of material and labor charges etc. ----complete job----
Fuel Injection Pump Repair include removing of FIP from m/c dismantling it extraction of old damaged parts and P/F of new parts viz:- Nozzles and holder assy.- 1set(04nos), Feed Pump - 1no., Elements 4nos., Delivery Valve 4 nos., Plunger 1set and Calibration of Pump. Fuel pipe tank to lift pump(309-5-10)-01no, fuel pipe lift pump to filter(309-5-11)-01no, fuel pipe filter to engine(309-5-12)-01no and fuel return pipe(309-5-1)-01no. -----one complete job---------
Repairs to Rear Rolls/wheels of DRR by way of dismantling it, removing the worn out parts of wheels viz:- Super Rings (Gear, Driven), Pin Dowels, Bushes(inner and outer), etc. P/F of new spares viz;- Super Rings(Gear Driven)(308-1-2) -2 No. ,Bracket(308-1-3) 2 nos.,Drive Pinion(306-7-11)-02nos,Nut (N-4-005) 12 no.,Nut (N-4-023) 12 No. , Bushes(inner)(308-1-7A) - 2nos, Bushes(outer)(308-1-7B) – 2nos., Pin Dowels(308-1-8) – 4nos., Spacer washer 4 nos.. The extraction of Axle from the m/c filling of gaps on axle with welding, then turning and finishing of the of the axle up to the required shape & size. The job also includes turning & finishing of L. H. & R.H Pinion and Pinion Bush for making proper alignment. Greasing the parts and reassembling whole unit. The job includes cost of material, labour charges and includes all taxes. -----one complete job---------
Repairs to Front Rolls & Axle of machine by way of dismantling and removing worn out bushes, Nuts, Bolts and P/F of new Bushes(307-2-2 and 307-2-3) – 4nos. (2 Bushes with Collars and 2 Bushes without Collars). Also job includes repairing of Front axle by way of welding, turning and finishing tofill the worn area of axle to fit the Bushes on it at appropriate places. Re-assembling of unit and fitting of new bolts & Greasing etc. The job includes cost of material, labour charges and includes all taxes. ------one complete job---------
Repairs to Steering System of machine by way of dismantling of steering and removing of worn out/damaged parts and P/F of new parts i.e Steering worm (307-4-12) -1no, Bevel Pinion (307-4-14)-1no., Bevel Wheel (307-4-13)-1no., Steering Bush (307-4-16)-1no., (the job includes turning & finishing of steering bush from inside & outside including Bevel Wheel/Pinion) Cotter Key (307-4-35)- 2nos., Steering Spindle 307-4-21, Grease Tube 307-4-40,Worm (307-4-12)-1no., Quadrant (307-3-9)-1no., Universal Joint-1no. and Quadrant Bolts & Nuts-3no. The job includes turning & finishing of Stg. Spindle from inside and outside for free movement and then fitting to machine. The job includes cost of material and labour charges for dismantling and refitting & making of proper alignmen
Repairs to cooling System of machine by replacing old/damaged Radiator with new radiator assembly ,new radiator hoses with Clamps, Fan Belt, water body complete with Pulley, Radiator Studs and Bolts etc. then re-assembling the whole unit and fitting into the machine. The job includes cost of material, labour charges and all taxes. ----one complete job-------
Repairs to Electrical System by way of extraction of old/damaged wiring, damaged Meter & P/F of new wiring, new Meter viz: Temp. Meter, Oil Pressure Meter, Ampere Meter & Starting Switch etc. Repairs to Self starter of machine by way of removing of all damaged/worn out parts and P/F of new parts such as Carbon Bush set Solenoid Switch, Field Coil, Bendix drive and repair to Armature by soldering etc. The job also includes cleaning & washing with petrol and testing on load .The job includes cost of material, labour charges -----complete job-------
Denting & Painting of m/c by applying double coat of red-oxide & then applying double coat of genuine quality of paint. Also writing the number of machine and name etc. The job includes cost of paint and labour charges etc. ---one complete job------
Replacing air Cleaner assy. with new air cleaner assy. and P/F of new exhaust Silencer with Studs.Providing and Fitting of new Driver’s seat. ---one complete job---
HSD for testing and washing of spares.
Mobil Oil for Engine
M. Oil Filter
Diesel Oil Filter
Grease
Gear Oil
R M ENTERPRISES
VEE AUTO TRADERS
AUTOMECH TRADERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .