| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.4 LAccepted-AOC | L-1 | Accepted-AOC Due to L-1 work awarded to Siddiqui Construction | |
| 2 | L-2₹12.8 L+₹2.4 L (23.3%)Rejected-Finance | L-2 | Rejected-Finance Due to L-2 | |
| 3 | L-3₹13.3 L+₹2.9 L (27.9%)Rejected-Finance | L-3 | Rejected-Finance Due to L-3 |
| Sl No | Description | Qty | Unit | Siddiqui Construction L1 | M/s ADITYADIXIT L3 | Mahakal Construction L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation over area(Exceeding 30cm in depth 1.50m in width as well as 10 sqm on plan) including disposal of the excavated earth lead up to 50m left up to 1.5m disposed soil to be levelled and neatly dressed etc. all completed as per the instruction of Engineer in-charge. Ordinary rock: with or without blasting | 33.44 | Cum | 1,750.77 ₹58,545.75 | 1,652.88 ₹55,272.31 Lowest | 1,755 ₹58,687.2 |
| 2.00 | Laying reinforced cement concrete 1:2:4 (1cement: 2sand:4 graded stone aggregate 20 mm nominal size) excluding cost of centring shuttering and reinforcement in foundation, footings etc., all completed as per the instruction of engineer in charge. | 23.28 | Cum | 6,500 ₹1,51,320 Lowest | 7,745 ₹1,80,303.6 | 7,121 ₹1,65,776.88 |
| 3.00 | Laying reinforced cement concrete 1:2:4 (1cement: 2sand :4 graded stone aggregate 20mm nominal size) excluding cost of centring, shuttering and reinforcement in suspended floors, roofs, landings, shelves, and their supports balconies, lintels, beams, girders, bressumers and cantilevers up to floor two level etc. all completed as per the instruction of Engineer in charge. | 63.04 | Cum | 6,800 ₹4,28,672 Lowest | 7,988.74 ₹5,03,610.17 | 7,000 ₹4,41,280 |
| 4.00 | Centring and shuttering including strutting, propring etc. and removal of form work etc. all completed as per the instructions of the Engineer in charge. Columns, pillars and piers. | 352.32 | Sqm | 400 ₹1,40,928 Lowest | 855 ₹3,01,233.6 | 912 ₹3,21,315.84 |
| 5.00 | Mild or cold twisted or Tor steel reinforcement for RCC or RB work including bending, binding and placing in position etc. all completed as per the instruction of engineer in charge. | 1,555.62 | kg | 85 ₹1,32,227.7 | 81 ₹1,26,005.22 Lowest | 83 ₹1,29,116.46 |
| 6.00 | 12mm thick cement plastering with cement mortar 1:6 (1cement, 6sand) or any mix including curing etc. as complete as per the instruction of Engineer in charge. | 352.32 | Sqm | 207 ₹72,930.24 Lowest | 318.23 ₹1,12,118.79 | 321 ₹1,13,094.72 |
| 7.00 | Carriage of cement from collier stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50m in underground. | 571.72 | Bags | 10 ₹5,717.2 Lowest | 10.24 ₹5,854.41 | 10 ₹5,717.2 Lowest |
| 8.00 | Carriage of sand/ballast/boulder etc from stock yard to underground through Coal tub including loading at pit top from stock yard, shutting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50m in underground. (metal + sand) | 118.49 | Cum | 395 ₹46,803.55 | 353.74 ₹41,914.65 Lowest | 368 ₹43,604.32 |
| 9.00 | Carriage of steel from collier stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by engineer in charge and carriage of unloading material up to distance 50m in underground. | 1.56 | Te | 480 ₹748.8 | 440 ₹686.4 Lowest | 475 ₹741 |
| 13.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹18.7 L
EMD Value
₹23,400
Closing Date
20 Sept 2025, 5:00 pmClosed
Staff Officer (Mining), Nagpur Area
WCL, Office of Area General Manager, Nagpur Area, Jaripatka, 440014
Construction of 16 Nos. RCC isolation stoppings in Seam V, sector C proposed depillaring Panel-K including (08 Nos. preparatory) with complete constructional material at Silewara Underground Mine, Silewara Sub Area of Nagpur Area
2025_WCL_343278_1
min-e-tenderNIC-008/2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
Silewara Underground Mine
Please refer Tender documents.
3 documents required · 3 mandatory
₹23,400
17 Oct 2025
5 Sept 2025
22 Sept 2025
6 Sept 2025
20 Sept 2025
6 Sept 2025
5 Sept 2025 - 13 Sept 2025
Amount
Excavation over area(Exceeding 30cm in depth 1.50m in width as well as 10 sqm on plan) including disposal of the excavated earth lead up to 50m left up to 1.5m disposed soil to be levelled and neatly dressed etc. all completed as per the instruction of Engineer in-charge. Ordinary rock: with or without blasting
Laying reinforced cement concrete 1:2:4 (1cement: 2sand:4 graded stone aggregate 20 mm nominal size) excluding cost of centring shuttering and reinforcement in foundation, footings etc., all completed as per the instruction of engineer in charge.
Laying reinforced cement concrete 1:2:4 (1cement: 2sand :4 graded stone aggregate 20mm nominal size) excluding cost of centring, shuttering and reinforcement in suspended floors, roofs, landings, shelves, and their supports balconies, lintels, beams, girders, bressumers and cantilevers up to floor two level etc. all completed as per the instruction of Engineer in charge.
Centring and shuttering including strutting, propring etc. and removal of form work etc. all completed as per the instructions of the Engineer in charge. Columns, pillars and piers.
Mild or cold twisted or Tor steel reinforcement for RCC or RB work including bending, binding and placing in position etc. all completed as per the instruction of engineer in charge.
12mm thick cement plastering with cement mortar 1:6 (1cement, 6sand) or any mix including curing etc. as complete as per the instruction of Engineer in charge.
Carriage of cement from collier stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50m in underground.
Carriage of sand/ballast/boulder etc from stock yard to underground through Coal tub including loading at pit top from stock yard, shutting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50m in underground. (metal + sand)
Carriage of steel from collier stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by engineer in charge and carriage of unloading material up to distance 50m in underground.
Total impact of GST for the purpose of CTC
Mahakal Construction (BID ID -1183790)
M/s ADITYADIXIT (BID ID -1185536)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_355846.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .