| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.4 L+₹2.3 L (8.40%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹31.0 L+₹3.9 L (14.3%)Rejected-AOC GARACHARMA POST SRI VIJAYA PURAM PIN 744105 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | L3 | Rejected-AOC L3 | |
| 4 | L4₹31.4 L+₹4.3 L (16.0%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹32.0 L+₹4.9 L (18.2%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹41.1 L
EMD Value
₹82,181
Closing Date
24 Jan 2024, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Construction Division-II, APWD, Prothrapur.
Construction of CC drain (Balance portion) i/c repair of existing drain from Cargo Complex to Air Force Gate at Helipad Port Blair.
2024_APWD_13000_1
No.27/EE/CD-II/2023-24
Open Tender
Civil Works - Others
Item Rate
120 days
South Andaman
Please refer tender document.
5 documents required · 5 mandatory
₹0
₹82,181
27 Feb 2024
10 Jan 2024
25 Jan 2024
10 Jan 2024
24 Jan 2024
10 Jan 2024
10 Jan 2024 - 19 Jan 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Supplying and filling in plinth with pulverised sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete.
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Providing and fixing PVC pipe weep hole at 1.0 mtr interval on both direction (Horizontal & Vertical ) in zig zag Shape or as per the direction of Engineer-in-Charge.
75mm dia.
Desilting of filled sludge, sediment, silt and heavy weed growth algae from the existing CC drain/Nallah in order to smooth flow of strom water etc. and disposal of the same upto a distance of 50m outside the periphery of the area cleared and lift upto 1.50m.
Abdul Gafoor
M/s Premier Steel Industries
M/S GURUNATH CONSTRUCTION
M Mohammed Aslam
T ROBERT KENNEDY
Haneefa Constructions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .