Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹14.6 L
Closing Date
1 Aug 2026, 3:00 pm6d left
SE AYODHAYA CIRCLE,AYODHAYA
First floor, Office Complex, UPAVP Angooribagh Ayodhya
CONSTRUCTION OF ADMINISTRATIVE BUILDING AT NEW THANA INHAUNA DISTT AMETHI
2026_UPHDB_1168399_1
1202/M-10/320 Dated 01.07.2026
Open Tender
Civil Works - Buildings
Percentage
330 days
Inhauna Distt Amethi
As per Tender Documents
3 documents required · 3 mandatory
₹8,850
EE CD-02 AYODHYA UPAVP
₹14.6 L
10 Jul 2026
10 Jul 2026
1 Aug 2026
10 Jul 2026
1 Aug 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0_) | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | - | - | - | - |
| 0.0_) | In all kind of soil upto 1.5m depth | 2,044.99 | Cum | 131.68 | ₹2,69,284.28 |
| 0.9_) | In all kind of soil upto 1.5m to 3.0m. depth | 523.21 | Cum | 225.75 | ₹1,18,114.66 |
| 0.0_) | In all kind of soil upto 3.0 m to 4.5 m. depth | 6.91 | Cum | 319.82 | ₹2,209.96 |
| 0.0_) | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 1,810 | CUM | 519.68 | ₹9,40,620.8 |
| 0.0_) | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 753 | CUM | 1,575.54 | ₹11,86,381.62 |
| 0.0_) | 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 2,544.25 | SQM | 361.59 | ₹9,19,975.36 |
| 0.0_) | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. | 2,500 | SQM | 108.42 | ₹2,71,050 |
| 0.0_) | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | 352 | CUM | 5,053.61 | ₹17,78,870.72 |
| 0.0_) | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (3) Treatment of top surface of plinth filling 5 liters/sqm With Chlorpriphos EC 20% with 1% concentration | 1,046.69 | SQM | 230 | ₹2,40,738.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
T.pdf
Tender Documents • 19.46 MB
F.pdf
Tender Documents • 27.88 MB
BOQ_2191584.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].