Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.2 L
EMD Value
₹10,452
Closing Date
17 Jul 2026, 5:00 pmClosed
Executive Officer
NP BISANDA
CONSTRUCTION OF R.C.C. NALA FROM TRANSFORMER TO H/O NEELU SINGH IN RIGHT SIDE BISANDA-ORAN MARG
2026_DOLBU_1167605_1
540/Nirman/NPBisanda/2026-27 Date 07-07-2026
Open Tender
Civil Works
Percentage
NP Bisandabujurg
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹617
Executive Officer
₹10,452
3 Aug 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of site | 1 | Job | 2,000 | ₹2,000 |
| 2 | Earthwork excavation in B/C Soil including lift up to 1.5 m and lead upto 30m t&p etc all complete (si. No. 251 chapt. No. 4 page no. 23) | 105.14 | CUM | 120 | ₹12,616.8 |
| 3 | DEWATRING BY 5 H.P PUMP SET | 5 | Day | 1,360 | ₹6,800 |
| 4 | S/L of laying of first class bedding on well compacted
sand, morram or approved granilar materials as per
class 1105 b( chapt no. 9 page no. 88) | 15.75 | CUM | 1,500 | ₹23,625 |
| 5 | cement concrete with 4cm (1/2") gauge approved stone ballest , approved course sand cement in the proportion 1:4:8 including supply of all materials , labours and tools and plants etc.required for proper complition of the work | 11.76 | CUM | 4,300 | ₹50,568 |
| 6 | R.C.C Work cement approved cource sand and 2cm (3/4) gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding the same with 24B.W.G.I. bindingwire on including | 42.51 | CUM | 7,100 | ₹3,01,821 |
| 7 | mild steel of iron work such as rainforcement concrete work (which not including all over rates) wrought to required shape as cnecessary including bending supply of steel its wastage and hooks and outhorized overlapping shall be measured SI no. 504. | 21.55 | QTL | 5,600 | ₹1,20,680 |
| 8 | S/F OF DISPLAY BOARD | 1 | No | 4,500 | ₹4,500 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.54 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
NIT8.pdf
Tender Documents • 0.89 MB
BOQ_2189752.xls
BOQ • 0.29 MB
Revised.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .