Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹26.4 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹32.3 L+₹5.9 L (22.5%)Rejected-Finance 201 GANAPATI SANKUL AGASHIVNAGAR MALKAPUR KARAD SATARA MAHARASHTRA 415539 | SATARA | MAHARASHTRA | 415539 | L-2 | Rejected-Finance Being other than lowest | |
| 3 | L-3₹33.5 L+₹7.1 L (26.9%)Rejected-Finance GROUND FLOOR F 11 PHASE II MAYAPURI WEST DELHI DELHI 110064 | DELHI | WEST DELHI | DELHI | 110064 | L-3 | Rejected-Finance Being other than lowest | |
| 4 | L-4₹33.7 L+₹7.3 L (27.5%)Rejected-Finance | L-4 | Rejected-Finance Being other than lowest | |
| 5 | L-5₹33.9 L+₹7.5 L (28.3%)Rejected-Finance | L-5 | Rejected-Finance Being other than lowest |
Tender Value
Refer Docs
EMD Value
₹96,700
Closing Date
8 Jul 2021, 6:00 pmClosed
GE Jammu
GE Jammu c/o 56 APO Pin-180003
MANNING AND OPERATION OF WATER SUPPLY INSTALLATION AT SUNJUWAN, PUMP HOUSE, KHANNA VIHAR, TRANSIT CAMP OF SUNJUWAN AND STP INSTALLATION AT DAMANA UNDER GE JAMMU
2021_MES_445234_1
GEJC-14/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
AoR of GE Jammu
Please refer Tender documents
9 documents required · 9 mandatory
₹500
GE Jammu
₹96,700
Yes
3 Sept 2021
24 May 2021
10 Jul 2021
24 May 2021
8 Jul 2021
7 Jun 2021
Amount
Manning and Operation of water supply installation Tube well No. 4 at Tippu line for 24 hours in three shifts by employing one FGM per shift (08 hours per each shift) including Sunday and holiday and operation and maintenance of the following all as directed by Engr-in-Charge: - (a) VT pumping sets/Submersible pump set of capacity 30 to 50 HP with Fully Automatic star delta starters - 01 Nos. (b) Voltage stabilizers of capacity 50 and 100 KVA - 01 Nos. (c) DG sets of capacity 62.5 to 100 KVA along with 12 Volt 180 AH batteries - 01 Nos.
Manning and Operation of water supply installation Tube well No. 5 at Tippu line for 24 hours in three shifts by employing one FGM per shift (08 hours per each shift) including sunday and holiday and operation and maintenance of the following all as directed by Engr-in-Charge: - (a) Submersible pump set of cap 20/30 HP with fully automatic star delta starter - 01 No (b) Voltage stabilizer of cap 50 KVA - 01 No (c) DG set of cap 40 KVA along with 12 Volt 180 AH battery - 01 No
Manning and Operation of water supply installation at Dilli Pond (Booster pump house) for 24 hours in three shifts by employing one FGM per shift (08 hours per each shift) including sunday and holiday and operation and maintenance of the following all as directed by Engr-in-charge: - (a) Booster pump sets of capacity 200-250 HP with fully automatic star delta starter- 02 Nos. (b) Voltage stabilizers of capacity 400 KVA - 01 Nos. (c) DG sets of capacity 250 KVA along with 12 Volt 180 AH batteries - 02 Nos
Manning and Operation of water supply installation at Sunjuwan Pump house and DG Set for security light at Bde HQ Sunjuwan for 24 hours in three shifts by employing one FGM per shift (08 hours per each shift) including sunday and holiday and operation and maintenance of the following all as directed by Engr-in-Charge: - (a) Centrifugal pump set of capacity 60 HP with fully automatic star delta starters - 03 Nos (b) Voltage stabilizers of capacity 75 KVA - 01 Nos. (c) DG sets of capacity 92 KVA along with 12 Volt 180 AH batteries - 02 Nos (d) Silver Ionization plant alongwith 01 Nos 1 HP mono block pumpset - 01 No (e) Altoch dozing pumps - 03 Nos
Manning and Operation of Water supply installations at pump house at Khanna Vihar transit camp round the clock in three shifts per day (Each shift of 08 Hours) by employing one Skilled FGM per shift all as per the directions of Engr-in-charge (It will be ensured that the operator must remain on duty per shift and at the time of change of shift). The details of the equipment installed to be operated by operators in three shifts are as under:- (a) Submersible Pump Set of Cap 25 HP - 01 Nos. (b) Chlorination Plant - 01 Nos. (c) DG sets of capacity 62.5 along with 12 Volt 180 AH batteries - 01 Nos .
Manning and Operation of 175 KLD capacity SWT (Sewage Treatment Plant) in URI Line having two shifts of 08 hours per each with 01 FGM and 02 Helper per shift. The details of equipments installed as under to be operated by operators in two shifts: - (a) Raw water pumping set cap 5 HP - 02 Nos (b) Compressor - 02 Nos (c) Monoblock pumping set cap 2 HP - 02 Nos (d) Chlorine plant - 02 Nos (e) Mixing of Sludges Note: - 1. Hypochloride solution used in STP during the contract period shall be provided by the Contractor. 2. All the spare parts for STP (to keep the installation active and in working condition) of the machinery installed such as all capacity pumping sets, Compressors, LT panels, starters, chlorine dosing plant shall be provided by the Contractor and the cost of the same shall be included in quoted rate.
Notes : (a) The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimum 5 years experience or matriculate having 7 years experience in related field in operation of water supply installations. (b) FGM deployed by the contractor will also be capable to carry out minor repairs of pumping sets/sluice valves and will be responsible for entire operation of valve and adjustment of valve at different places etc.
The Operator will maint the log sheet of pump sets and DG sets and deposit to the concerned JE on last day of every month.The cost of maintenance of documents installation charts shall deemed to be included in the rates quoted for the above item.
The contractor shall provide the necessary tools and plants to the operating staff for smooth running of the water supply installations and DG sets.
The safety precautions for the operator will be the responsibility of the contractor and the unit rate is deemed to include for the safety equipments and the T & P required for routine maintenance of the plant.
Contractor has to produce life insurance cover of minimum Rs 5.00 Lakh of their employee/wages employed under this contract along with claimed payment. No Payment shall be made to the contractor without the documentary evidence. The contractor quoted rates shall be deemed to include for the same.
Operating staff shall clean the installation, plant and machineries every day and periodical maintenance including cleaning, grass cutting around the pump house. And moreover Covid -19 related precautions issued time-to time shall also be maintained and necessary sanitisation materials are to be provided by contractor, the cost of sanitisation materials shall deemed to be included in the rates quoted.
The contractor will engage his labour for collection of POL from MES store yard and shifting to the installations to be run under it.
Operating staff shall wear uniform of Grey colour or as approved by GE.
24 Hrs will be considered as one day, Operating staff must possess normal mobile phone.(Not Smart Phone) while attend the complaint and keep the record of complaints.
In case of FGM found absent from duty due to any reason a penal recovery @ 1500/- and in case of Helper a penal recovery @ 1000/- per shift per person shall be made from contractor dues. Decision of accepting officer in this regard shall be final and binding.
The cost of maintenance of documents, installation charts and daily records i.e log sheet and attendance register as clarified under relevant PS shall deemed to be included in rates quoted for the above items.
The contractor shall provide reliever for operation as per prevailing labour regulation and the rate shall be deemed to include for the the same. Employee may be asked to carry out duty in unit areas all as directed by the Engineer-in-Charge and it shall be deemed that contractor has to quoted rates keeping that aspects inview and nothing extra shall be admissible later on the account of misinterpretation.
The Wages to the staff employed will be paid in the Aadhaar linked bank account and the monthly statement be deposited in the office before release of RAR.
Prakash Trading Corporation
Amit Enterprises
M/S S K Electricals Regd
M/S J N TRADERS
M/S SATPAL AND BROTHERS
vishesh engineers
bamral builder
M/S A TO Z ENGINEERS
M/S HARI CONSTRUCTION
Bidder Name
M/S S K Electricals Regd
Prakash Trading Corporation
Amit Enterprises
Sarbat Construction Co
M/S A TO Z ENGINEERS
M/S J N TRADERS
bamral builder
M/S HARI CONSTRUCTION
vishesh engineers
M/S SATPAL AND BROTHERS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .