Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹10.5 L
EMD Value
₹21,500
Closing Date
27 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ZILA ABHIYNTA, LATEHAR
ZILA ABHIYNTA OFFICE LATEHAR
Repair of Badka Bandh at village Panchayat Mongar Block- Latehar, District- Latehar
2026_ZPLAT_121317_1
ZP/LATEHAR/35/2026-27/ Group_76
Open Tender
Repair and Maintenance Works
Percentage
60 days
MONGAR LATEHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹21,500
21 Nov 2026
21 Nov 2026
30 Nov 2026
21 Nov 2026
27 Nov 2026
21 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in stripping by hydraulic M/C in grade A and B types of soil -do -do - as per direction E/I | 266.4 | m3 | 88.35 | ₹23,536.44 |
| 2 | E/W in excavation and filling in canal by the hydraulic excavator -do -ordinary soil -do - laying the earth in 225 mm layers -do- up to 500 m do -do- as per specification and direction E/I | 965.39 | m3 | 115.04 | ₹1,11,058.81 |
| 3 | E/W in excavation and filling in canal by the hydraulic excavator -do -ordinary soil -do - laying the earth in 225 mm layers -do- up to 10 m do -do- as per specification and direction E/I | 789.87 | m3 | 60.48 | ₹47,771.16 |
| 4 | watering and consolidation of earth laid in 150 mm to 225 mm layers by manual labour with c.i hammer to achieve minimum 85% of maximum dry density do-do- as per direction of E/I | 1,755.26 | m3 | 39.8 | ₹69,859.35 |
| 5 | Supplying laying boulder in rock toe , heel trenches of the dam as per desingn , drawing , including the cost of materials roylty and all taxes etc but excluding the cost of carriage all complete as per specification and direction of E/I | 162 | m3 | 1,491.06 | ₹2,41,551.72 |
| 6 | Supplying and laying (properly as per design and drawing ) rip -rap with good quality of boulder duly packed including the the cost of materials roylty and all taxes etc but excluding the cost of carriage all complete as per specification and direction of E/I | 135 | m3 | 1,756.4 | ₹2,37,114 |
| 7 | Carriage of boulder | 297 | m3 | 512.27 | ₹1,52,144.19 |
| 8 | Add 18% GST | 0.18 | EACH | - | - |
| 9 | Add 1% Labour Cess | 0.01 | EACH | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Group_76.pdf
Tender Documents • 0.97 MB
BOQ_164132.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .