Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.6 L+₹19,261.40 (2.99%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.8 L+₹34,104.01 (5.29%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.8 L+₹35,350.34 (5.48%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹7.0 L+₹55,631.46 (8.63%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.3 L
EMD Value
₹22,660
Closing Date
24 Sept 2026, 4:00 pmClosed
Executive Engineer
Xen Hand
Upgradation of Shah Colony Vodhpora road BWO Drain and berm filling
2026_PWDJK_324480_1
NIT NO 36 OF 2026-27
Open Tender
Civil Works
Percentage
90 days
Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer Handwara
₹22,660
Yes
25 Sept 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 77.4 | cum | 256.85 | ₹19,880.19 |
| 2 | Providing and laying dry Stone soling duly tightly hand packed and RBM/GSB filling i/c stacking, carriage etc, complete job. | 22.05 | cum | 850 | ₹18,742.5 |
| 3 | Providing and laying in position cement concrete of specified grade (1:4:8) mix,stone aggregate 40mm nominal size i/c the cost of centring and shuttering - All work upto plinth level. Complete job. Incl all carriages | 14.7 | cum | 5,552.5 | ₹81,621.75 |
| 4 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering, All work in 1:2:4 (1 cement, 2 coarse sand; 4 graded stone aggregate). Crushed aggregate | 79.87 | cum | 6,900 | ₹5,51,103 |
| 5 | Providing and laying of Nallah Muck including consolidation and carriages complete job | 385 | cum | 850 | ₹3,27,250 |
| 6 | Providing and laying of 50mm thick 1:2:4 mix cement concrete flooring using 50mm size stone aggreagate | 15 | sqm | 562.15 | ₹8,432.25 |
| 7 | Centring and shuttering including strutting propping etc and removal of same | 440 | sqm | 286.35 | ₹1,25,994 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1094551.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .