Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹12,800
Closing Date
5 Oct 2026, 5:00 pm
General Manager, Kunustoria Area
Office of the General Manager, Kunustoria Area, Post - Toposi, Dist.- Paschim Bardhaman, West Bengal- 713362
Construction of EnM department office and store room in NSOCP under Kunustoria Area
2026_ECL_365924_1
ECL/GM/KNT/CIVIL/E- TENDER/26-27/550 Dated-22.09.2026
Open Tender
Civil Works - Buildings
Percentage
60 days
NSOCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹12,800
24 Sept 2026
24 Sept 2026
6 Oct 2026
24 Sept 2026
5 Oct 2026
25 Sept 2026
24 Sept 2026 - 28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil. | 12.67 | cum | 190.35 | ₹2,411.73 |
| 2 | Supplying and filling in plinth with river sand under floors, including watering, ramming, consolidating and dressing complete. | 7.96 | cum | 1,098.15 | ₹8,741.27 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) | 11.41 | cum | 5,657.15 | ₹64,548.08 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 3.05 | cum | 7,386.6 | ₹22,529.13 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 0.78 | cum | 8,764.7 | ₹6,836.47 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 0.87 | cum | 9,272 | ₹8,066.64 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 8.96 | sqm | 305 | ₹2,732.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 16 | sqm | 573.25 | ₹9,172 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 14.7 | sqm | 750.5 | ₹11,032.35 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Weather shade, Chajjas, corbels etc., including edges. | 2.09 | sqm | 740.7 | ₹1,548.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.79 MB
BOQ_378851.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .