Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.4 L
Closing Date
17 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Replacement of defective Signalling Cable of various sections of Danapur division. [100 Km].
DNRSnTSig2026-9
DNRSnTSig2026-9
Open
Works - General
18 Months
Patna, Bihar
₹0
₹6.4 L
17 Jul 2026
23 Jun 2026
3 Jul 2026
47 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,19,01,211.5 | ||
| — | 70000.00 | — | — | ||
| "Excavation of Trench in all kinds of soil and refilling of trenches (1.2 Mtr, Depth, 300 mm Width) - without bricks. Note:- (I) Payment will be made as per actual work done on pro rata basis, if required depth is not available at site. (II) If the depth of trench is not uniform in a span of 100 mtr.or shorter length, if site condition demands along the cable run minimum depth will be taken for that particular stretch for payment." | — | — | — | 1,02,45,900 | |
| — | 110.00 | — | — | ||
| Laying cable of different sizes as per cable route plan approved by Railway and meggering of all main & tail cables as per technical specification of tender.- 2 core to 12 core signalling cable. | — | — | — | 12,93,261.2 | |
| — | 500.00 | — | — | ||
| Excavation, trenching, earth work and reinstatement of track while track crossisng. | — | — | — | 86,815 | |
| — | 1500.00 | — | — | ||
| Supply of double walled corrugated (DWC) pipes for underground power/ communication /signal/OFC protection with IS 14930 part-II along with the socket/coupler. T-Joints to be provided at the junctions wherever required.- a) Size of Outer dia 200 mm/Inner dia.175mm Inspection- RITES | — | — | — | 15,71,775 | |
| — | 1500.00 | — | — | ||
| Installation of Double Wall Corrugated (DWC) pipe with socket coupler. This includes trenching (1.2 mtr. Depth) and back filling. | — | — | — | 1,63,770 | |
| — | 20000.00 | — | — | ||
| Termination of cable cores on ARA terminals or on 8 way terminals in the cable termination rack.This includes all associated works of pulling out the cable from under ground,Peeling off insulation,dressing of cable core supported on sting rod with contractors own materials as per instruction of the site incharge. The cable armour to be earthed. Cable tags to be provided. | — | — | — | 3,79,600 | |
| — | 1000.00 | — | — | ||
| Supply of PBT ARA terminal as per IRSSpec No.IRS:S-75-91 i) 6 way Inspection-RDSO | — | — | — | 6,08,470 | |
| — | 1000.00 | — | — | ||
| Supply of PBT ARA terminal as per IRSSpec No.IRS:S-75-91 ii) 1 way Inspection-RDSO | — | — | — | 1,12,730 | |
| — | 1000.00 | — | — | ||
| "Excavation of trench less trench/manual boarding paring size upto 110 mm) up to a depth of minimum 1.0 meter along with laying of HDPE/DWC pipe and its accessories, all other items which will be required for laying of cable through HDPE /DWC Pipe (Track/Road Crossing) as per requirement at site." | — | — | — | 9,00,770 | |
| — | 7000.00 | — | — | ||
| Transportation of HDT machine with accessories including handling of stores materials, preparation of site and boring for placing of 110 MM dia HDPE/DWC pipes for crossing of S&T cable together at Bridges/ Culverts/Track/ pucca road Crossing, Boring trench shall be minimum 3 Mtr below the river bed and 1 Mtr below the Track/Road/Pucca Road crossing area. This includes supply of HDPE/DWC pipes and accessories, cost of fuels & all other items which will be required for laying of cable through it. The work shall be executed as per instruction of site engineer.- (a) Boring upto length 150 Mtrs. | — | — | — | 92,24,110 | |
| — | 100.00 | — | — | ||
| Casting,Concreting and Curing of foundation and erection for full apparatus case (GKP-type)as per DRG No.SGW/MGS/L1/91 includong cost of all materials required for fixing holding down bolts, casting, concreting and fixing of "E" type lock. Note:-i)The contractor will provide holding down bolts.ii)Bottom of appratus cases should be filled with sand and the top surface covered with masonry work and neat cementing. | — | — | — | 7,13,127 | |
| — | 100.00 | — | — | ||
| Fixing,wiring of terminal strips,bakelite strip, transformers, relays fuses with base and supply and fixing of shelves for full appratus case. (All materials except transformers,relay,terminal strips, bakelite strip and fuses with base to be spplied by the contractor.). | — | — | — | 4,49,326 | |
| — | 100.00 | — | — | ||
| "Supply of E-type lock without key,spec.no.IRS-S-30,Drg. no. S-3376/M key-S-3377/M. Individual number of miniature E locks and Normal size of locks required at site to be decided by the site engineer as per site requirement. Inspection-RDSO" | — | — | — | 1,64,999 | |
| — | 100.00 | — | — | ||
| Key for E type lock supplied above Inspection-Consignee | — | — | — | 24,776 | |
| — | 200.00 | — | — | ||
| Miniature lock.Inspection-Consignee | — | — | — | 2,80,442 | |
| — | 100.00 | — | — | ||
| Supply of full size location box as per design of GKP signal workshop, Inspection-RITES | — | — | — | 27,12,467 | |
| — | 80.00 | — | — | ||
| Filling earth around location box/signal post for a width of 0.5 m on all sides, upto a level of 150 mm below the foundation top.This work includes consolidation of earth by watering. | — | — | — | 17,996 | |
| — | 200.00 | — | — | ||
| Providing and laying in position cement concrete of 1:3:6 (1 cement :3 sand : 6 gradded stone aggregate 20 mm nominal size) including cement. | — | — | — | 10,78,492 | |
| — | 250.00 | — | — | ||
| Supply and placing of Injection moulded cable channel of size width (int/ext) 240/340 mm, height (int/ext) 155mm/230 mm, length approx 1 meter (tolerance in dimensions +/-10 mm) ,weight per mtr atlaest -8 Kg (Top and bottom). Material - Polyolefin- Engineering Plastic, with fire protection class K-1 inaccordance with DIN 53438 part-II, Breaking Load (minimum) ->12 Kilo Newton or latest at room temperature, for laying signalling/ telecom/ power cables, channel attachable to each other with male female swallow tail connectors and having suitable detachable cover. Technical Specification & Testing parameter/ Procedure as per RDSO-Ref No. : STS/CableLaying Practices Vol-IV dtd. 09.05.2018. Inspection-RITES | — | — | — | 7,39,260 | |
| — | 10000.00 | — | — | ||
| Supply of Disconnect type Terminal,screwless, 2 IN 2 OUT(as per spec. no. RDSO/SPN/189/2004 or latest)along with all accessories including separators for fixing on Cable Termination Rack/Location boxes for Cable Termination Purpose. Inspection-RDSO | — | — | — | 10,47,500 | |
| — | 10000.00 | — | — | ||
| Fixing installation of disconnect terminal (Wago or similar) on relay rack/ctr/ location with steel carrier rail. | — | — | — | 15,200 | |
| — | 315.00 | — | — | ||
| Supply of 8 SWG GI wire (4mm dia) suitable for trackcircuit rail bonding. As per IRS Specification S:13@ 45>46@. Inspection- Consignee | — | — | — | 31,065.3 | |
| — | 100.00 | — | — | ||
| Exposing of cable in the vicinity of track by excavating soil & ballast and then relaying and back filling to it in original state at one particular place. | — | — | — | 39,360 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_2022__GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
ECRJPOregardingprocedureforundertakingearthworkdiggingworktrenchingworkinthevivinityofsignallingtelecomandelectricalcables1.pdf
ATTACHMENT
ACS01to11GCC2022-.pdf
ATTACHMENT
MasterDocuments.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .