Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 LAdmitted-Finance | ₹46.0 L | L1 | Admitted-Finance |
| 2 | L2₹46.6 LAdmitted-Finance VILLAGE SAMLEU PO KHAIRI DISTT CHAMBA HP 176325 | CHAMBA | HIMACHAL PRADESH | 176325 | ₹46.6 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | MAN SINGH L1 | DUNERIA CONSTRUCTIONS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of temporary dyke by random backfill as per technical specification. | 490 | Cum | 1,40,140 ₹1.7 L | 1,40,630 ₹1.7 L |
| 2.00 | Dewatering as per technical specification. | 1,865 | KWh | 37,300 ₹44,014 | 41,030 ₹48,415.40 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size). | 311.12 | Cum | 16,69,469.92 ₹19.7 L | 16,76,003.44 ₹19.8 L |
| 4.00 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note:-Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). | 189.73 | Cum | 12,07,821.18 ₹14.3 L | 11,92,832.51 ₹14.1 L |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts. | 179.88 | Sqm | 84,003.96 ₹99,124.67 | 87,601.56 ₹1.0 L |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 8,290.58 | kg | 6,13,502.92 ₹7.2 L | 6,38,374.66 ₹7.5 L |
| 7.00 | Extra for providing and mixing hardening compound of approved quality as per manufacturer’s specification in cement concrete mixed @ 2 litre per 50 kg of cement. | 1,767.59 | litre | 95,449.86 ₹1.1 L | 1,18,428.53 ₹1.4 L |
| 8.00 | Providing and filling of Stone boulder. | 51.26 | Cum | 51,208.74 ₹60,426.31 | 55,719.62 ₹65,749.15 |
Tender Value
₹45.0 L
EMD Value
₹90,000
Closing Date
9 Jan 2026, 5:00 pmClosed
Dy General Manager (PnC)
Procurement and Contract Wing, CPS-I Khairi Distt. Chamba (HP) 176325.
Protection Work of right pier of Khairi Bridge at CPS-1, Khairi.
2025_NHPC_890574_1
NH/CPS-1/PnC/W-1585/2025-26/ 415 Dated 19/12/2025
Open Tender
Civil Works - Bridges
90 days
Chamera Power Station-1
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NHPC LIMITED
₹90,000
Yes
2 Feb 2026
19 Dec 2025
13 Jan 2026
19 Dec 2025
9 Jan 2026
19 Dec 2025
Construction of temporary dyke by random backfill as per technical specification.
Dewatering as per technical specification.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size).
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note:-Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Extra for providing and mixing hardening compound of approved quality as per manufacturer’s specification in cement concrete mixed @ 2 litre per 50 kg of cement.
Providing and filling of Stone boulder.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tender.pdf
Tender Documents • 3.59 MB
BOQ_936087.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid