Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹105.7 CrRejected-Finance RAM PLAZA NAVASHAKTI CHOWK BHABHA NAGAR NASHIK 422 011 | NASHIK | NASHIK | MAHARASHTRA | 422011 | ₹105.7 Cr | 1 | Rejected-Finance Accept for Financial bid |
| 2 | 2₹107.8 CrRejected-Finance HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | ₹107.8 Cr | 2 | Rejected-Finance Reject for Financial bid |
| Sl No | Description | Qty | Unit | Harsh Constructions Pvt Ltd L2 | Pawar Patkar Constructions Pvt.Ltd. L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF O.P.D. AND WARD BUILDING IN PREMISES OF GOVERNMENT MEDICAL COLLEGE, AKOLA WITH ELCTRIFICATION | |||||
| 2.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.OPD BUILDING/INFRASTRUCTURE WORK | 9,129.96 | One Square Metre | 14 ₹1.3 L | 14 ₹1.3 L |
| 3.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means OPD BUILDING/SUBSTATION/INFRASTRUCTURE WORK/PUMP ROOM | 10,135 | One Cubic Metre | 247 ₹25.0 L | 250 ₹25.3 L |
| 4.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means OPD BUILDING | 1,813.7 | One Cubic Metre | 307 ₹5.6 L | 311 ₹5.6 L |
| 5.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means OPD BUILDING/SUBSTATION/INFRASTRUCTURE WORK/PUMP ROOM | 4,954.71 | One Cubic Metre | 270 ₹13.4 L | 274 ₹13.6 L |
| 6.00 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means OPD BUILDING/SUBSTATION | 1,025 | One Cubic Metre | 372 ₹3.8 L | 377 ₹3.9 L |
| 7.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means OPD BUILDING | 1,031 | One Cubic Metre | 624 ₹6.4 L | 632 ₹6.5 L |
| 8.00 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means INFRASTRUCTURE WORK/PUMP ROOM | 1,663 | One Cubic Metre | 300 ₹5.0 L | 304 ₹5.1 L |
| 9.00 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. OPD BUILDING/SUBSTATION/INFRASTRUCTURE WORK/PUMP ROOM | 4,042 | One Cubic Metre | 143 ₹5.8 L | 145 ₹5.9 L |
| 10.00 | Filling in plinth and floors with contractors material / brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete.OPD BUILDING | 1,470 | One Cubic Metre | 714 ₹10.5 L | 717 ₹10.5 L |
Tender Value
₹100.7 Cr
EMD Value
₹50.8 L
Closing Date
7 Feb 2025, 6:00 pmClosed
EXECUTIVE ENGINEER,PUBLIC WORKS DISION,AKOLA
EXECUTIVE ENGINEER, PUBLIC WORKS DISION,NEAR COLLECTOR OFFICE, AKOLA
CONSTRUCTION OF O.P.D. AND WARD BUILDING IN PREMISES OF GOVERNMENT MEDICAL COLLEGE, AKOLA WITH ELCTRIFICATION WITH ELCTRIFICATION
2024_PWR_1131360_1
ETNDERNOTICENO30
Open Tender
Civil Works - Bridges
400 days
AKOLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹50.8 L
CHIEF ENGINEER,PUBLIC WORKS REGION,AMRAVATI
20 Jan 2026
30 Dec 2024
10 Feb 2025
30 Dec 2024
7 Feb 2025
30 Dec 2024
16 Jan 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid