Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
14 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Preparation of land acquisition plans and proposals, obtaining forest clearances and other land acquisition related works in SRMT GGC New line, MTJ DHO 4th line and DER DAQ 4th line in jurisdiction of Dy. CE/C-2/Agra and Dy.CE/C/CNB.
CEN00AGC0726
CEN00AGC0726
Open
36 Months
Agra, Uttar Pradesh
₹0
₹5.2 L
12 Jun 2026
12 Jun 2026
30 Jun 2026
Item Breakup - A-NS items
Preparation of Land Plans using Plane Table / Kilometre Total Station along the propose alignment for identification and measurement of land to be acquired and properties lying in the proposed land, required for superimposition of revenue record. It also includes collecting details such as owner of land and property, type of structure, number of floors, land use pattern such as agriculture, commercial, barren, forest etc. and collection of all necessary revenue survey maps required for preparation of Land Acquistion Proposals. Note - Seven Nos. of copies of land plan as per State Govt. / Railway's requirements shall be supplied under this item.
Preparation of land acquisition proposals in Kilometre seven copies or as per Revenue Department's requirement of U.P., Rajasthan, M.P. including collection of Property cards/7/12 abstract/8 a Abstract including superimposition of revenue record on proposed alignment and calculation and identification of area to be acquired along with land owners detail etc. This item includes submission of proposal in required formats to respective revenue officials for the publication of notifications under various sections of Land Acquisition Act with latest amendments or any other relevant Act amended subsequently to accelerate acquisition of land along with follow up for joint measurement order.
After notification, the declaration of the same Each to all the owners of land by distribution of notice, affixing the notice at notice board of every village office Panchayat, Tahsil office as well as announcement (Munadi) in every village by speaker for awareness and information. (Per Village)
Collection of sale deeds for the last 03 years Each and the rate list of district. (Actual Govt. fees if any paid will be paid extra over schedule rates on production proof of payment thereof) (Per Sub Registry Office)
Identification of landless and small farmers Each and preparation of compensation package. (Per District)
Distribution of compensation - Opening of Each bank account of affected parties in the nearby schedule / regional rural bank, deposition of cheque in the bank and furnishing the acknowledgment of the same for the record. The item also includes assisting competent authority in preparation of compensation package, organising camps for disbursement of compensation by making suitable all cost of arrangement for tents transportation, vehicle for Revenue authorities typing, Videography and Photography etc. (Per Village)
Joint Measurement by Revenue Staff Acquiring Agency for the delivery of possession of the land after acquisition.
Making transferring the land title to railway with all legal formalities like purchase of stamp papers, typing work involved. handing / taking over of land , attending , attending the revenue department for necessary stamping and registration thereof etc. (Per District) DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Finding out utility services along the proposed Kilometre alignment such as Electric lines, poles, telephone lines, high tension lines along with their voltage and sag height, OFC, cables, existing RE cables, Quad cables, retaining walls, boundary walls, trees, pipe lines for water, petrol, gas etc. and roads including preparation km wise plan showing all utilities which need to be shifted before construction etc. complete.
Facilitating Public Works Department for Each survey and valuation of affected structures, and any other value addition to the land etc. complete in all respect, with consultant's own man power, stationary / printing/ consumables , including transport arrangement etc. complete in all respect. Note: Here unit Each means Per Village.
Facilitating Forest department for valuation of Each affected trees etc. complete in all respect, with consultant's own man power, stationary /printing /consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village.
Facilitating valuation of affected trees etc. complete in all respect, with consultant' sown man power, stationary/ printing / consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village
Photography /Videography, numbering of Each agriculture (fruit bearing) & forest trees within the Railway boundary and beyond Railway boundary up to proposed ROW as per joint measurement sheet by making notch of size 100x100mm,painting white paint on it and numbering the trees in each survey number with red enamel paint . Taking photographs and video shooting of the trees of each survey numbers of the village coming under acquisition in private land and Railway land separately. Preparation of document as per proforma enclosed and submission of same in soft & one set of hardcopy. The item includes all contractor's material, labours, transportation tools & plants ,etc. . For private land, number of trees should be identified as per Survey no./Land owner wise and within existing railway land, the number of trees should be identified as per Railway Km/EP.
For panchnama due to noncompletion of joint Kilometre measurement due to mass opposition in a village or stretch with Revenue Staff & landowners/sub- holders, incl. survey equipment's, manpower, etc. including transport arrangement etc. complete in all respect with all contractor labour, materials tools & plants.
Obtaining Forest clearance /permission as per Job Forest conservation act and its amendments including the processing of case on PARIVESH Portal by performing following activities Preparing a report on forest clearance required for complete project as per Forest conservation act 1980 and its approval from Railway. DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Obtaining Forest clearance /permission as per Job Forest conservation act and its amendments including the processing of case on PARIVESH Portal by performing following activities Assisting Railway in obtaining Forest clearance with processing through the case with relevant documents at each Divisional forest officer level and submission to Nodal officer of regional Forest office. Joint survey of trees to be carried out as per direction of forest officials.
Providing and fixing cast in situ or precast M- Each 25 concrete pillars along the Railway alignment terms of reference & relevant provisions of Indian Railway alognment terms of reference & relevant provisions of Indian Railways code for Engineering Department (199, Third Reprint) with up to date correction slips and as directed by the Engineer in charge on straight and curves as per Scope of work & Technical Specifications with Contractors own materials, tools and plants, including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc. including all taxes and ro yalties complete: including painting marking the pillars at site. The rate includes the cost of all material including centering shuttering, cutting binding, reinforcement and erection of stones etc. Location of concrete pillars 1) At every 500 mtrs (as per direction of engineer incharge) along the Centre line of the appro ved Railw a y alignment using 1200x100x100mm concrete pillar with 700mm projection abo v e the ground level duly embedding in CC (1:4:8) of 300x300x500mm siz e base concrete, including setting out prposed curves at site indicating tangent points, apex point and crown of curv e and approach of Major Bridtge. 4). The Chainage or KM & distance of proposed centre line of track shall be marked on these pillars 5) Seprate colouring preferable yellow colour for centre line alignment pillars are to be painted for identification 6) Centre opoint direction has to be painted on alignemnt pillar with chainage are to be painted. 7)NCR has to be engr a ved on all pillars and painted with black pain DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
"Providing and fixing Stone Pillars / RCC Pillars Each of Siz e 1300x250x250mm along the proposed land boundary and for Benchmarks as per terms of reference & relevant provisions of Indian Railways Code for Engineering Department (1999, Third Reprint) with up to date correction Slips and as directed b y the Engineer-in- charge on straight and curves as per Scope of Work & Technical Specifications with Contractors' own materials, tools and plants; including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc.; including all taxes and ro yalties complete; including painting, marking the pillars at site; The rate includes the cost of all materials including erection of stones etc. , Location of Stone pillars.1) Erection of boundary pillars at every 50 mts interval or at every change of location of boundary, whichever is less with 700mm projection abo ve the ground level and 600mm below GL at earmarked location, embedding in CC (1:4:8) of 400x400x700mm siz e base concrete, duly marking the distance of the centre line of proposed line from the boundary.2) Bench marks should be marked with 700mm projection abo v e the ground level and 600mm below GL at earmarked location embedding in CC (1:4:8) of 400x400x700mm siz e base concrete, at intervals of not more than one kilometre along the line and at sites of important bridges, duly marking BM Number / Value / Chainage. In every case the position chosen for a bench mark should be such that it can be con veniently referred to during construction and is, at the same time, not liable to be interfered with during the progress of construction. 3) Boundary pillar / Benchmarks Pillars are to be painted with RED paint for identification and markings in white or black paint. 4) Boundary pillars are to be painted with boundary distance and direction of increase/decrease of width. 5) 'NCR' has to be engr a ved on all types of pillars and painted with white or black paint Total 7511895.39 Item- 2 NS items DHO-MTJ 4th line S No. Item Description of Item Unit Qty Rate Amount No
Preparation of Land Plans using Plane Table / Kilometre Total Station along the propose alignment for identification and measurement of land to be acquired and properties lying in the proposed land, required for superimposition of revenue record. It also includes collecting details such as owner of land and property, type of structure, number of floors, land use pattern such as agriculture, commercial, barren, forest etc. and collection of all necessary revenue survey maps required for preparation of Land Acquistion Proposals. Note - Seven Nos. of copies of land plan as per State Govt. / Railway's requirements shall be supplied under this item DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Preparation of land acquisition proposals in Kilometre seven copies or as per Revenue Department's requirement of U.P., Rajasthan, M.P. including collection of Property cards/7/12 abstract/8 a Abstract including superimposition of revenue record on proposed alignment and calculation and identification of area to be acquired along with land owners detail etc. This item includes submission of proposal in required formats to respective revenue officials for the publication of notifications under various sections of Land Acquisition Act with latest amendments or any other relevant Act amended subsequently to accelerate acquisition of land along with follow up for joint measurement order.
After notification, the declaration of the same Each to all the owners of land by distribution of notice, affixing the notice at notice board of every village office Panchayat, Tahsil office as well as announcement (Munadi) in every village by speaker for awareness and information. (Per Village)
Collection of sale deeds for the last 03 years Each and the rate list of district. (Actual Govt. fees if any paid will be paid extra over schedule rates on production proof of payment thereof) (Per Sub Registry Office)
Identification of landless and small farmers Each and preparation of compensation package. (Per District)
Distribution of compensation - Opening of Each bank account of affected parties in the nearby schedule / regional rural bank, deposition of cheque in the bank and furnishing the acknowledgment of the same for the record. The item also includes assisting competent authority in preparation of compensation package, organising camps for disbursement of compensation by making suitable all cost of arrangement for tents transportation, vehicle for Revenue authorities typing, Videography and Photography etc. (Per Village)
Joint Measurement by Revenue Staff Acquiring Agency for the delivery of possession of the land after acquisition.
Making transferring the land title to railway with all legal formalities like purchase of stamp papers, typing work involved. handing / taking over of land , attending , attending the revenue department for necessary stamping and registration thereof etc. (Per District)
Finding out utility services along the proposed Kilometre alignment such as Electric lines, poles, telephone lines, high tension lines along with their voltage and sag height, OFC, cables, existing RE cables, Quad cables, retaining walls, boundary walls, trees, pipe lines for water, petrol, gas etc. and roads including preparation km wise plan showing all utilities which need to be shifted before construction etc. complete. DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Facilitating Public Works Department for Each survey and valuation of affected structures, and any other value addition to the land etc. complete in all respect, with consultant's own man power, stationary / printing/ consumables , including transport arrangement etc. complete in all respect. Note: Here unit Each means Per Village.
Facilitating Forest department for valuation of Each affected trees etc. complete in all respect, with consultant's own man power, stationary /printing /consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village.
Facilitating valuation of affected trees etc. complete in all respect, with consultant' sown man power, stationary/ printing / consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village
Photography /Videography, numbering of Each agriculture (fruit bearing) & forest trees within the Railway boundary and beyond Railway boundary up to proposed ROW as per joint measurement sheet by making notch of size 100x100mm,painting white paint on it and numbering the trees in each survey number with red enamel paint . Taking photographs and video shooting of the trees of each survey numbers of the village coming under acquisition in private land and Railway land separately. Preparation of document as per proforma enclosed and submission of same in soft & one set of hardcopy. The item includes all contractor's material, labours, transportation tools & plants ,etc. . For private land, number of trees should be identified as per Survey no./Land owner wise and within existing railway land, the number of trees should be identified as per Railway Km/EP.
For panchnama due to noncompletion of joint Kilometre measurement due to mass opposition in a village or stretch with Revenue Staff & landowners/sub- holders, incl. survey equipment's, manpower, etc. including transport arrangement etc. complete in all respect with all contractor labour, materials tools & plants.
Obtaining Forest clearance /permission as per Job Forest conservation act and its amendments including the processing of case on PARIVESH Portal by performing following activities Preparing a report on forest clearance required for complete project as per Forest conservation act 1980 and its approval from Railway.
Obtaining Forest clearance /permission as per Job Forest conservation act and its amendments including the processing of case on PARIVESH Portal by performing following activities Assisting Railway in obtaining Forest clearance with processing through the case with relevant documents at each Divisional forest officer level and submission to Nodal officer of regional Forest office. Joint survey of trees to be carried out as per direction of forest officials. DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Providing and fixing cast in situ or precast M- Each 25 concrete pillars along the Railway alignment terms of reference & relevant provisions of Indian Railway alognment terms of reference & relevant provisions of Indian Railways code for Engineering Department (199, Third Reprint) with up to date correction slips and as directed by the Engineer in charge on straight and curves as per Scope of work & Technical Specifications with Contractors own materials, tools and plants, including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc. including all taxes and ro yalties complete: including painting marking the pillars at site. The rate includes the cost of all material including centering shuttering, cutting binding, reinforcement and erection of stones etc. Location of concrete pillars 1) At every 500 mtrs (as per direction of engineer incharge) along the Centre line of the appro ved Railw a y alignment using 1200x100x100mm concrete pillar with 700mm projection abo v e the ground level duly embedding in CC (1:4:8) of 300x300x500mm siz e base concrete, including setting out prposed curves at site indicating tangent points, apex point and crown of curv e and approach of Major Bridtge. 4). The Chainage or KM & distance of proposed centre line of track shall be marked on these pillars 5) Seprate colouring preferable yellow colour for centre line alignment pillars are to be painted for identification 6) Centre opoint direction has to be painted on alignemnt pillar with chainage are to be painted. 7)NCR has to be engr a ved on all pillars and painted with black pain DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
"Providing and fixing Stone Pillars / RCC Pillars Each of Siz e 1300x250x250mm along the proposed land boundary and for Benchmarks as per terms of reference & relevant provisions of Indian Railways Code for Engineering Department (1999, Third Reprint) with up to date correction Slips and as directed b y the Engineer-in- charge on straight and curves as per Scope of Work & Technical Specifications with Contractors' own materials, tools and plants; including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc.; including all taxes and ro yalties complete; including painting, marking the pillars at site; The rate includes the cost of all materials including erection of stones etc. , Location of Stone pillars.1) Erection of boundary pillars at every 50 mts interval or at every change of location of boundary, whichever is less with 700mm projection abo ve the ground level and 600mm below GL at earmarked location, embedding in CC (1:4:8) of 400x400x700mm siz e base concrete, duly marking the distance of the centre line of proposed line from the boundary.2) Bench marks should be marked with 700mm projection abo v e the ground level and 600mm below GL at earmarked location embedding in CC (1:4:8) of 400x400x700mm siz e base concrete, at intervals of not more than one kilometre along the line and at sites of important bridges, duly marking BM Number / Value / Chainage. In every case the position chosen for a bench mark should be such that it can be con veniently referred to during construction and is, at the same time, not liable to be interfered with during the progress of construction. 3) Boundary pillar / Benchmarks Pillars are to be painted with RED paint for identification and markings in white or black paint. 4) Boundary pillars are to be painted with boundary distance and direction of increase/decrease of width. 5) 'NCR' has to be engr a ved on all types of pillars and painted with white or black paint Total 10959416.15 Item- 3 NS items DER-DAQ 4th line S No. Item Description of Item Unit Qty Rate Amount No
Preparation of Land Plans using Plane Table / Kilometre Total Station along the propose alignment for identification and measurement of land to be acquired and properties lying in the proposed land, required for superimposition of revenue record. It also includes collecting details such as owner of land and property, type of structure, number of floors, land use pattern such as agriculture, commercial, barren, forest etc. and collection of all necessary revenue survey maps required for preparation of Land Acquistion Proposals. Note - Seven Nos. of copies of land plan as per State Govt. / Railway's requirements shall be supplied under this item. DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Preparation of land acquisition proposals in Kilometre seven copies or as per Revenue Department's requirement of U.P., Rajasthan, M.P. including collection of Property cards/7/12 abstract/8 a Abstract including superimposition of revenue record on proposed alignment and calculation and identification of area to be acquired along with land owners detail etc. This item includes submission of proposal in required formats to respective revenue officials for the publication of notifications under various sections of Land Acquisition Act with latest amendments or any other relevant Act amended subsequently to accelerate acquisition of land along with follow up for joint measurement order.
After notification, the declaration of the same Each to all the owners of land by distribution of notice, affixing the notice at notice board of every village office Panchayat, Tahsil office as well as announcement (Munadi) in every village by speaker for awareness and information. (Per Village)
Collection of sale deeds for the last 03 years Each and the rate list of district. (Actual Govt. fees if any paid will be paid extra over schedule rates on production proof of payment thereof) (Per Sub Registry Office)
Identification of landless and small farmers Each and preparation of compensation package. (Per District)
Distribution of compensation - Opening of Each bank account of affected parties in the nearby schedule / regional rural bank, deposition of cheque in the bank and furnishing the acknowledgment of the same for the record. The item also includes assisting competent authority in preparation of compensation package, organising camps for disbursement of compensation by making suitable all cost of arrangement for tents transportation, vehicle for Revenue authorities typing, Videography and Photography etc. (Per Village)
Joint Measurement by Revenue Staff Acquiring Agency for the delivery of possession of the land after acquisition.
Making transferring the land title to railway with all legal formalities like purchase of stamp papers, typing work involved. handing / taking over of land , attending , attending the revenue department for necessary stamping and registration thereof etc. (Per District)
Finding out utility services along the proposed Kilometre alignment such as Electric lines, poles, telephone lines, high tension lines along with their voltage and sag height, OFC, cables, existing RE cables, Quad cables, retaining walls, boundary walls, trees, pipe lines for water, petrol, gas etc. and roads including preparation km wise plan showing all utilities which need to be shifted before construction etc. complete. DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Facilitating Public Works Department for Each survey and valuation of affected structures, and any other value addition to the land etc. complete in all respect, with consultant's own man power, stationary / printing/ consumables , including transport arrangement etc. complete in all respect. Note: Here unit Each means Per Village.
Facilitating Forest department for valuation of Each affected trees etc. complete in all respect, with consultant's own man power, stationary /printing /consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village.
Facilitating valuation of affected trees etc. complete in all respect, with consultant' sown man power, stationary/ printing / consumables, transportation etc. complete in all respect. Note: Here unit Each means Per Village
Photography /Videography, numbering of Each agriculture (fruit bearing) & forest trees within the Railway boundary and beyond Railway boundary up to proposed ROW as per joint measurement sheet by making notch of size 100x100mm,painting white paint on it and numbering the trees in each survey number with red enamel paint . Taking photographs and video shooting of the trees of each survey numbers of the village coming under acquisition in private land and Railway land separately. Preparation of document as per proforma enclosed and submission of same in soft & one set of hardcopy. The item includes all contractor's material, labours, transportation tools & plants ,etc. . For private land, number of trees should be identified as per Survey no./Land owner wise and within existing railway land, the number of trees should be identified as per Railway Km/EP.
For panchnama due to noncompletion of joint Kilometre measurement due to mass opposition in a village or stretch with Revenue Staff & landowners/sub- holders, incl. survey equipment's, manpower, etc. including transport arrangement etc. complete in all respect with all contractor labour, materials tools & plants.
Obtaining Forest clearance /permission as per Job Forest conservation act and its amendments including the processing of case on PARIVESH Portal by performing following activities Preparing a report on forest clearance required for complete project as per Forest conservation act 1980 and its approval from Railway.
Obtaining Forest clearance /permission as per Job Forest conservation act and its amendments including the processing of case on PARIVESH Portal by performing following activities Assisting Railway in obtaining Forest clearance with processing through the case with relevant documents at each Divisional forest officer level and submission to Nodal officer of regional Forest office. Joint survey of trees to be carried out as per direction of forest officials. DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
Providing and fixing cast in situ or precast M- Each 25 concrete pillars along the Railway alignment terms of reference & relevant provisions of Indian Railway alognment terms of reference & relevant provisions of Indian Railways code for Engineering Department (199, Third Reprint) with up to date correction slips and as directed by the Engineer in charge on straight and curves as per Scope of work & Technical Specifications with Contractors own materials, tools and plants, including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc. including all taxes and ro yalties complete: including painting marking the pillars at site. The rate includes the cost of all material including centering shuttering, cutting binding, reinforcement and erection of stones etc. Location of concrete pillars 1) At every 500 mtrs (as per direction of engineer incharge) along the Centre line of the appro ved Railw a y alignment using 1200x100x100mm concrete pillar with 700mm projection abo v e the ground level duly embedding in CC (1:4:8) of 300x300x500mm siz e base concrete, including setting out prposed curves at site indicating tangent points, apex point and crown of curv e and approach of Major Bridtge. 4). The Chainage or KM & distance of proposed centre line of track shall be marked on these pillars 5) Seprate colouring preferable yellow colour for centre line alignment pillars are to be painted for identification 6) Centre opoint direction has to be painted on alignemnt pillar with chainage are to be painted. 7)NCR has to be engr a ved on all pillars and painted with black pain DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
"Providing and fixing Stone Pillars / RCC Pillars Each of Siz e 1300x250x250mm along the proposed land boundary and for Benchmarks as per terms of reference & relevant provisions of Indian Railways Code for Engineering Department (1999, Third Reprint) with up to date correction Slips and as directed b y the Engineer-in- charge on straight and curves as per Scope of Work & Technical Specifications with Contractors' own materials, tools and plants; including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc.; including all taxes and ro yalties complete; including painting, marking the pillars at site; The rate includes the cost of all materials including erection of stones etc. , Location of Stone pillars.1) Erection of boundary pillars at every 50 mts interval or at every change of location of boundary, whichever is less with 700mm projection abo ve the ground level and 600mm below GL at earmarked location, embedding in CC (1:4:8) of 400x400x700mm siz e base concrete, duly marking the distance of the centre line of proposed line from the boundary.2) Bench marks should be marked with 700mm projection abo v e the ground level and 600mm below GL at earmarked location embedding in CC (1:4:8) of 400x400x700mm siz e base concrete, at intervals of not more than one kilometre along the line and at sites of important bridges, duly marking BM Number / Value / Chainage. In every case the position chosen for a bench mark should be such that it can be con veniently referred to during construction and is, at the same time, not liable to be interfered with during the progress of construction. 3) Boundary pillar / Benchmarks Pillars are to be painted with RED paint for identification and markings in white or black paint. 4) Boundary pillars are to be painted with boundary distance and direction of increase/decrease of width. 5) 'NCR' has to be engr a ved on all types of pillars and painted with white or black paint Total 7730492.75
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderdocument0726.pdf
ATTACHMENT
GCCuptoacs11_compressed.pdf GCC merged up to ACS11
ATTACHMENT
JPOtoincludeinTD.pdf
ATTACHMENT
MakeinIndiacirculars.pdf
ATTACHMENT
GCCuptoacs11_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid