| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 CrAccepted-AOC | ₹11.1 Cr | L1 | Accepted-AOC Work awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical 1) Power of attorney is not in name of DSC holder and also issued beyond the tender date. 2) Bidder has submitted Appendix -12 (IBC) without striking out the option which is not applicable. |
| Sl No | Description | Qty | Unit | SRUSTI ENGINEERS L1 |
|---|---|---|---|---|
| 1.00PART - A (BALANCE CIVIL WORKS) Earthwork Excavation by mechanical means (Hydraulic excavator) / manual means in all Sorts of Soil for plinth and foundation, trenches and other miscelleneous works up to an average depth of 1.5 meters including shoring, strutting, bailing out water if necessary, leveling, hand ramming the bottom of trenches with proper watering, refilling the sides of foundation / trenches up to the existing ground level with excavated available good quality of Soil in layers; not exeeding 150 mm thick [each layer] with leveling; dressing; & ramming properly the each layer with watering and disposing the surplus earth / unwanted materials materials within a lead of 50 meters etc. complete all as per specifications, as per drawing and as directed Engineer-in-charge. | ||||
| 1.01 | All kinds of soil - Upto 1.5mtr depth | 200 | Cum | 331 ₹66,200 Lowest |
| 2.00 | PART - A (BALANCE CIVIL WORKS)
Providing Pre-Construction Anti Termite Treatment by treating contact surface of soil with the plinth beams, top surface of plinth filling & plinth protection area etc. as per IS:6313 with a performance guarantee of five years etc. complete all as per specifications and as directed Engineer-in-charge.
Note: measurement shall be for plinth area of the building. | 935 | Sqm. | 150 ₹1,40,250 Lowest |
| 3.00PART - A (BALANCE CIVIL WORKS) Filling in plinth by soil including spreading in layers, watering, consolidating to 200mm thickness and finished to the desired level etc. complete as per specifications, relevant IS and as directed by Engineer-in-Charge. | ||||
| 3.01 | Using selected excavated earth | 48 | Cum | 350 ₹16,800 Lowest |
| 4.00 | PART - A (BALANCE CIVIL WORKS)
Providing and laying Rubble Stone Soling using hard granite stones below floor, for consolidated thickness of 150mm with stones vertically hand set, interstices packed with smaller stone chips, binding with murrum, watering, consolidating and finish to level etc. complete as per specifications and as directed by Engineerin- Charge. | 100 | Cum | 3,100 ₹3,10,000 Lowest |
| 5.00 | PART - A (BALANCE CIVIL WORKS)
Providing and laying in proportion P.C.C1:3:6 Plain cement concrete using 20mm down crushed aggregate of approved quality for mudmat leveling course for foundation, plinth and below flooring including form work wherever necessary, consolidation, leveling, finishing and curing etc complete as per specification and as directed by Engineer-in-Charge. | 75 | Cum | 8,300 ₹6,22,500 Lowest |
| 6.00 | PART - A (BALANCE CIVIL WORKS)
Providing and laying PCC 1:2:4 using 20 mm & downsize, clean, crushed, well graded, cubical shape, sharp edged aggregates of hard, durable & approved quality stones / rubbles for plinth, floor & drain bedding & all other various miscellaneous PCC works including machine mixing, transporting, laying, spreading, consolidating, levelling, finishing as directed, providing; fixing & removing necessary form work; as & when required / directed, preparation of base properly by dressing; levelling & hand ramming using wooden hand rammer by proper watering, racking out all the masonry joints & close hacking the old / new concrete / plastered surfaces for proper / good bonding, base shall be fully neat, clean & slightly wet before laying Concrete, Curing for a minimum period of 7 days, cleaning the work area & disposing the debris / waste materials / unwanted materials / things etc., upto a lead of 2000 meters outside the pheriphery of work premises etc. complete all as per specification and as directed by the Engineer-in-charge at all locations and at all lifts / heights. | 55 | Cum. | 8,225 ₹4,52,375 Lowest |
| 7.00 | PART - A (BALANCE CIVIL WORKS)
Providing and Constructing R.R. masonry, using hard; durable & approved quality stones / rubbles, in CM 1:6 for foundation works & all other miscellaneous RR masonry works etc., including racking out all the masonry joints or simultaneous flush pointing, providing; fixing & removing necessary staging / platform wherever; as & when required / directed, close hacking the old / new concrete / plastered surfaces for
proper / good bonding, base shall be fully neat, clean & slightly wet before laying masonry, Curing for a minimum period of 7 days, cleaning the work area & disposing the debris / waste materials / unwanted
materials / things etc., upto a lead of 2000 meters outside the pheriphery of work premises etc. complete all as per specification and as directed by the Engineer-in-charge at all locations and at all lifts / heights. | 10 | Cum | 8,188 ₹81,880 Lowest |
| 8.00PART - A (BALANCE CIVIL WORKS) Providing and laying Cast Insitu RCC of M 30 grade using graded stone aggregate 20mm max size including weigh batching, mechanical mixing, transporting and placing, vibrating, consolidation, finishing, curing, etc complete at for cloumn, beams slab, stair case for all RCC works all heights/ levels as per drawing, specifications and as directed, but excluding formwork and steel reinforcement. | ||||
Tender Value
₹10.3 Cr
EMD Value
₹20.1 L
Closing Date
2 Apr 2025, 5:00 pmClosed
Station Director, KGS-1 and 2
NPCIL, KGS, Kaiga Site, Uttara Kannada, Karnataka
Balance work of Construction of 60 Nos of Executive Apartments at Kaiga Township.
2025_NPCIL_224802_2
CPPP/2025/064
Open Tender
Construction Works
Item Rate
730 days
Kaiga Township Mallapur
Construction of RCC Multistoried -above G plus 3 storey or floors- Buildings or Civil structure -with or without of materials
6 documents required · 6 mandatory
₹0
₹20.1 L
Office of Head CTC
11 Aug 2025
7 Mar 2025
7 Apr 2025
7 Mar 2025
2 Apr 2025
20 Mar 2025
7 Mar 2025 - 15 Mar 2025
18 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART - A (BALANCE CIVIL WORKS) Earthwork Excavation by mechanical means (Hydraulic excavator) / manual means in all Sorts of Soil for plinth and foundation, trenches and other miscelleneous works up to an average depth of 1.5 meters including shoring, strutting, bailing out water if necessary, leveling, hand ramming the bottom of trenches with proper watering, refilling the sides of foundation / trenches up to the existing ground level with excavated available good quality of Soil in layers; not exeeding 150 mm thick [each layer] with leveling; dressing; & ramming properly the each layer with watering and disposing the surplus earth / unwanted materials materials within a lead of 50 meters etc. complete all as per specifications, as per drawing and as directed Engineer-in-charge. | |||||
| 1.01 | All kinds of soil - Upto 1.5mtr depth | 200 | Cum | 320 | ₹64,000 |
| 2 | PART - A (BALANCE CIVIL WORKS)
Providing Pre-Construction Anti Termite Treatment by treating contact surface of soil with the plinth beams, top surface of plinth filling & plinth protection area etc. as per IS:6313 with a performance guarantee of five years etc. complete all as per specifications and as directed Engineer-in-charge.
Note: measurement shall be for plinth area of the building. | 935 | Sqm. | 156 | ₹1,45,860 |
| 3PART - A (BALANCE CIVIL WORKS) Filling in plinth by soil including spreading in layers, watering, consolidating to 200mm thickness and finished to the desired level etc. complete as per specifications, relevant IS and as directed by Engineer-in-Charge. | |||||
| 3.01 | Using selected excavated earth | 48 | Cum | 352 | ₹16,896 |
| 4 | PART - A (BALANCE CIVIL WORKS)
Providing and laying Rubble Stone Soling using hard granite stones below floor, for consolidated thickness of 150mm with stones vertically hand set, interstices packed with smaller stone chips, binding with murrum, watering, consolidating and finish to level etc. complete as per specifications and as directed by Engineerin- Charge. | 100 | Cum | 3,077 | ₹3,07,700 |
| 5 | PART - A (BALANCE CIVIL WORKS)
Providing and laying in proportion P.C.C1:3:6 Plain cement concrete using 20mm down crushed aggregate of approved quality for mudmat leveling course for foundation, plinth and below flooring including form work wherever necessary, consolidation, leveling, finishing and curing etc complete as per specification and as directed by Engineer-in-Charge. | 75 | Cum | 8,216 | ₹6,16,200 |
| 6 | PART - A (BALANCE CIVIL WORKS)
Providing and laying PCC 1:2:4 using 20 mm & downsize, clean, crushed, well graded, cubical shape, sharp edged aggregates of hard, durable & approved quality stones / rubbles for plinth, floor & drain bedding & all other various miscellaneous PCC works including machine mixing, transporting, laying, spreading, consolidating, levelling, finishing as directed, providing; fixing & removing necessary form work; as & when required / directed, preparation of base properly by dressing; levelling & hand ramming using wooden hand rammer by proper watering, racking out all the masonry joints & close hacking the old / new concrete / plastered surfaces for proper / good bonding, base shall be fully neat, clean & slightly wet before laying Concrete, Curing for a minimum period of 7 days, cleaning the work area & disposing the debris / waste materials / unwanted materials / things etc., upto a lead of 2000 meters outside the pheriphery of work premises etc. complete all as per specification and as directed by the Engineer-in-charge at all locations and at all lifts / heights. | 55 | Cum. | 8,251 | ₹4,53,805 |
| 7 | PART - A (BALANCE CIVIL WORKS)
Providing and Constructing R.R. masonry, using hard; durable & approved quality stones / rubbles, in CM 1:6 for foundation works & all other miscellaneous RR masonry works etc., including racking out all the masonry joints or simultaneous flush pointing, providing; fixing & removing necessary staging / platform wherever; as & when required / directed, close hacking the old / new concrete / plastered surfaces for
proper / good bonding, base shall be fully neat, clean & slightly wet before laying masonry, Curing for a minimum period of 7 days, cleaning the work area & disposing the debris / waste materials / unwanted
materials / things etc., upto a lead of 2000 meters outside the pheriphery of work premises etc. complete all as per specification and as directed by the Engineer-in-charge at all locations and at all lifts / heights. | 10 | Cum | 6,270 | ₹62,700 |
| 8PART - A (BALANCE CIVIL WORKS) Providing and laying Cast Insitu RCC of M 30 grade using graded stone aggregate 20mm max size including weigh batching, mechanical mixing, transporting and placing, vibrating, consolidation, finishing, curing, etc complete at for cloumn, beams slab, stair case for all RCC works all heights/ levels as per drawing, specifications and as directed, but excluding formwork and steel reinforcement. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
165216718.xls
BOQ Document • 0.59 MB
165216719.pdf
Tender Document • 2.28 MB
165216720.pdf
Tender Document • 4.16 MB
165216721.pdf
Tender Document • 2.69 MB
165216722.pdf
Tender Document • 2.37 MB
Retenderdoc064.pdf
Tender Document • 2.26 MB
Technicalbid.rar
Tender Document • 0.02 MB
165216724.html
Tender Document • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .