Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.4 LAccepted-AOC 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | L-1 | Accepted-AOC Work complte | |
| 2 | L-1₹25.4 LRejected-Finance | L-1 | Rejected-Finance No Lottery Winner | |
| 3 | L-1₹25.4 LRejected-Finance ADD 627 BAKSHI KHURD DARAGANJ TEHSIL SADAR PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | L-1 | Rejected-Finance No Lottery Winner | |
| 4 | L-1₹25.4 LRejected-Finance | L-1 | Rejected-Finance No Lottery Winner | |
| 5 | L-1₹25.4 LRejected-Finance | L-1 | Rejected-Finance No Lottery Winner |
Tender Value
Refer Docs
EMD Value
₹29,817
Closing Date
6 Feb 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Improvement of Rcc drain from ram nishad house to bake bihari guest house in nankari ward 27 Under Zone 6.
2026_NNKAN_1103955_2
117/AA-6/2025-26
Open Tender
Civil Works
Percentage
60 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹29,817
11 Oct 2026
3 Feb 2026
6 Feb 2026
3 Feb 2026
6 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling C.C work including stocking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) etc all complete | 31.6 | sqm | 67 | ₹2,117.2 |
| 2 | Earth work in excavation by mechanical means hydraulic excavator in trenches for foundation pipe cable etc in ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. | 433.68 | cum | 215 | ₹93,241.2 |
| 3 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. | 41.8 | cum | 4,380 | ₹1,83,084 |
| 4 | R.C.C works with1:1.5:3 cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All | 153.67 | cum | 8,720 | ₹13,40,002.4 |
| 5 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. tor etc.all complete. | 120.63 | qtl | 7,200 | ₹8,68,536 |
| 6 | cartage of earth upto 3km including loading and unloading incl mat all complete. | 346.94 | cum | 116.96 | ₹40,578.1 |
| 7 | S/F of sign board with padestal incl mat all com. | 1 | nos | 3,840 | ₹3,840 |
| 8 | TAX18% | 1 | TaX | 4,55,651.8 | ₹4,55,651.8 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
BOQ_2054648.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .