Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹291.30 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,826
Closing Date
27 Aug 2026, 6:00 pmClosed
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Path along with R/wall from Amira nagar Kharothi Hanga Link road to Sitla Mata Temple near HO Rajinder Kumar Kharothi Pyt Hanga Block Bhaderwah (APDP)
2026_RDPR_321066_46
e-NIT No 70 of REW Doda 2026-27 Dated.14.08.2026
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹5,826
2 Sept 2026
17 Aug 2026
29 Aug 2026
17 Aug 2026
27 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.30% in Ordinary Rock & 70 % in All kinds of soil | 41.04 | Cum | 248.95 | ₹10,216.91 |
| 0.0 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 45 | sqm | 91.75 | ₹4,128.75 |
| 0.0 | Dry Stone Pitching (Any thickness) including cost of stones on horizontal | 4.5 | Cum | 1,235.55 | ₹5,559.97 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.71 | Cum | 4,826.5 | ₹8,253.32 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 12.56 | Cum | 5,733.6 | ₹72,014.02 |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 12.83 | Cum | 5,402.9 | ₹69,319.21 |
| 0.0 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 22.52 | Cum | 2,793.8 | ₹62,916.38 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.43 | Cum | 6,591.25 | ₹2,834.24 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 23.38 | sqm | 286.35 | ₹6,694.86 |
| 0.0 | Carriage of Sand & Bajri | 21.48 | Cum | 742.62 | ₹15,951.48 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1070964.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .