| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr Quoted ₹4.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.5 Cr+₹4.7 L (1.07%)Rejected-Finance | ₹4.5 Cr+₹4.7 L (1.07%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.6 Cr+₹17.0 L (3.85%)Rejected-Finance NO 10 19 RESIDENCY APARTMENT BAWA ROAD ALWARPET CHENNAI 600018 | CHENNAI | TAMIL NADU | 600018 | ₹4.6 Cr+₹17.0 L (3.85%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | AVA Construction L1 | NEXUS INFRA PROJECTS L2 | M CUBE INFRA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Deepening and dredging as indicated in the drawing in all types of soil as existing at site including loose or cmpacted sand, site mixed with/without clay or soft clay or any other soft materials including, boulders, spilled cargoes and any broken concrete pieces/debries and foreign materials like fishing nets, broken pieces or mechanised boats etc. suitable methods acceptable to the departmental officers using Grab Dredger or cutter suction dredger or any other suitable machinery and sufficiet number of barges for dumping, transporting and disposal without distrubing/damaging the wharf/jetty structures, break water, groyne including removal and conveying the dredged materials and dumping in the specified area shown by the Departmental Officers including spreading etc. completed as shown in the drawing and as directed by the Departmental Officers including spreading etc. completed as shown in the drawing and as directed by the departmenal officers with all lead and lift, mobilisation of machineries, cost of surveying at the time of part payment and at completion stage including all tools, plants, equipment and labour, consumables fuel etc. complete as directed by the departmental officers. | 66,662.5 | m³ | 545 ₹3,63,31,063 Lowest | 551 ₹3,67,31,038 | 565 ₹3,76,64,313 |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 11,662.5 | m³ | 91 ₹10,61,288 Lowest | 91 ₹10,61,288 Lowest | 100 ₹11,66,250 |
| 3.00 | Sub Total Amount for above all items (excluding GST) | 1 | No | 636 ₹3,73,92,351 Lowest | 642 ₹3,77,92,326 | 0 ₹3,88,30,563 |
| 4.00 | GST 18% for above SubTotal Amount | 1 | gst | 114.48 ₹67,30,623.18 Lowest | 115.56 ₹68,02,618.68 | 0 ₹69,89,501.34 |
Tender Value
₹4.3 Cr
EMD Value
₹2.3 L
Closing Date
12 Jan 2026, 3:00 pmClosed
Chief Engineer
Fishing Harbour Project Circle Fisheries and Fishermen Welfare Department Chennai-35
Dredging the drainage channel and Barmouth at Senthalaivayal, Annan Nagar- Puthutheru, Mandripattinam, Somanathapattinam, Kazhumankuda, Vallavanpattinam, Ganesapuram, Sembiyanmahadevi, Mallipattinam, Manora and Gandhi Nagar in Thanjavur District
2025_AHDF_637290_1
19 DB F.114 N 2025 Dated 18.12.2025
Open Tender
Civil Works
Lump-sum
270 days
Thanjavur District
As per mentioned document
4 documents required · 4 mandatory
₹0
₹2.3 L
Yes
9 Mar 2026
30 Dec 2025
13 Jan 2026
30 Dec 2025
12 Jan 2026
30 Dec 2025
Deepening and dredging as indicated in the drawing in all types of soil as existing at site including loose or cmpacted sand, site mixed with/without clay or soft clay or any other soft materials including, boulders, spilled cargoes and any broken concrete pieces/debries and foreign materials like fishing nets, broken pieces or mechanised boats etc. suitable methods acceptable to the departmental officers using Grab Dredger or cutter suction dredger or any other suitable machinery and sufficiet number of barges for dumping, transporting and disposal without distrubing/damaging the wharf/jetty structures, break water, groyne including removal and conveying the dredged materials and dumping in the specified area shown by the Departmental Officers including spreading etc. completed as shown in the drawing and as directed by the Departmental Officers including spreading etc. completed as shown in the drawing and as directed by the departmenal officers with all lead and lift, mobilisation of machineries, cost of surveying at the time of part payment and at completion stage including all tools, plants, equipment and labour, consumables fuel etc. complete as directed by the departmental officers.
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B)
Sub Total Amount for above all items (excluding GST)
GST 18% for above SubTotal Amount
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Cover1.pdf
Tender Documents • 0.84 MB
BOQ_762719.xls
BOQ • 0.34 MB
Cover2.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .