| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹7.8 LRejected-Finance CHENNAI CIRCLE CHENNAI 6 | ₹7.8 L | L2 | Rejected-Finance REJECTED |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s. KVR & CO H1 | M/S RSR & CO H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with initial lead and lift etc. completely I hard stiff clay, stiff black hard redearth, shales, gravelstony earth and earth mixed with small size boulders and hard gravelly soil etc., compltete as per standard specification (SS20B) | 13.42 | M3 | 350 ₹4,697 | 263 ₹3,529.46 |
| 2.00 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 3.1 | M3 | 6,500 ₹20,150 | 5,881 ₹18,231.10 |
| 3.00 | Random rubble masonry in cement motor 1:5 (one Part of cement, Five part of Crushed Stone Sand (M- Sand)) mix using all granite stones and bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification | 0.81 | M3 | 7,000 ₹5,670 | 6,399.5 ₹5,183.60 |
| 4.00Brick Work in Cement Mortor 1:5 Mix (one cement, five Msand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications | |||||
| 4.01 | Ground Floor (upto Basement) | 3.3 | M3 | 7,604 ₹25,093.20 | 7,604 ₹25,093.20 |
| 4.02 | Above Basement | 15.74 | M3 | 7,697.5 ₹1.2 L | 7,697.5 ₹1.2 L |
| 5.00Supplying and erectioning steel sheet centering and shuttering including necessery supports for plain surface in foundation and basement for RCC roof rectancular or T beams, L beams, lintel and bedblock staircase waist slap and landing beam etc., with all bracing using M.S sheets spaced at 75cm C/C etc., completly complying with standard specifications. | |||||
| 5.01 | A)For Grade beam | 26.62 | M3 | 326 ₹8,678.12 | 326 ₹8,678.12 |
| 5.02 | B)For Roof(Ground Floor) | 39.96 | M3 | 1,500 ₹59,940 | 1,085.45 ₹43,374.58 |
| 5.03 | C)For Column | 22.77 | M3 | 1,500 ₹34,155 | 1,302.5 ₹29,657.92 |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
23 Dec 2025, 3:00 pmClosed
EXECUTIVE OFFICER UTHUKOTTAI TOWN PANCHAYAT
EXECUTIVE OFFICER UTHUKOTTAI TOWN PANCHAYAT
Construction of Sanitation facility in Aringnar Anna Government Hospital at Ward No.14, Chetty Street Backside in Uthukottai Town Panchayat
2025_DTP_633751_1
405/2025/A1
Open Tender
Civil Works - Buildings
Aringnar Anna Government Hospital
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,000
Yes
UTHUKOTTAI TOWN PANCHAYAT OFFICE
24 Feb 2026
19 Dec 2025
23 Dec 2025
19 Dec 2025
23 Dec 2025
19 Dec 2025
20 Dec 2025
Earth work excavation for foundation and depositing on bank with initial lead and lift etc. completely I hard stiff clay, stiff black hard redearth, shales, gravelstony earth and earth mixed with small size boulders and hard gravelly soil etc., compltete as per standard specification (SS20B)
Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Random rubble masonry in cement motor 1:5 (one Part of cement, Five part of Crushed Stone Sand (M- Sand)) mix using all granite stones and bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification
Brick Work in Cement Mortor 1:5 Mix (one cement, five Msand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
Ground Floor (upto Basement)
Above Basement
Supplying and erectioning steel sheet centering and shuttering including necessery supports for plain surface in foundation and basement for RCC roof rectancular or T beams, L beams, lintel and bedblock staircase waist slap and landing beam etc., with all bracing using M.S sheets spaced at 75cm C/C etc., completly complying with standard specifications.
A)For Grade beam
B)For Roof(Ground Floor)
C)For Column
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Up to Basement
Above Basement
Supplying and fabricating and placing in position of MS or RTS rods for all rainforced works including cost of steel and binding wire and all labour for cutting and fabrication and other incidental charges etc., completly complying with standard specifications.
Ceiling Plastering in cm 1:3, 10mm thick including cost and conveyence all materials to site and all labour charges and incidental charges etc.,completly complying with standard specifications.
Plastering in cm 1:5, 12 mm thick including cost and conveyence all materials to site and all labour charges and incidental charges etc.,completly complying with standard specifications.
Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement
Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement
Dadooing walls with Glazed tiles of sizes 305mm X 200mm X 6mm size of approved make and quality and colour Set in cement mortar 1:2 (One part of Cement and two part of Plastering Sand (P- Sand)) over 10 mm base layer plastering and pointing with white cement neatly as directed.
Manufacturing supplying and fixing of MILD STEEL DOOR made out of 50 x 50 x 6 mm M.S angle for outer frame,35 X 35 X 5mm M.S.Angle for outer frame of shutter. The entire shutter area shall be covered with CRC sheets (18 G) with 5Nos, of stiffners using M.S.Flats of size 25 X 6mm at equal intervals horizontally. The corners of the frames and shutter with CRC sheets shall be welded by adopting flash butt welding or any other suitable method. Provision towards 3Nos, of Hinges incase of single shutters / 6Nos,of Hinges incase of Double shutters of 125 X 31 X 1.25mm size placed at appropriate intervals and provisions shall be made for Tower bolts 2Nos, Aldrop 1No. The frame shall be provided with 6Nos,of Hold fast of 200mm length using 50 X 6mm M.S.Flat. The entire frame and shutter shall be provided with one coat of red oxide primer including cost of hold fasts,hinges, locking arrangements, handles wind appliences etc., complete and as directed by the departemental officers.
Supply and fixing in position of RCC Jolly 50mmtk including cost and conveyance of all material to site and all other labour charges for fixing etc., Complete.
White washing two coats with best quality of slacked shell lime including cost and conveyence all charges etc.,completly complying with standard specifications.
Painting two coats of newly plastered wall surface with ready mixed Cement paint of first quality and of approved colour over a priming coat including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required etc., complete complying with standard specification.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.77 MB
BOQ_758280.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid