| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹18.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹19.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R.Padmavathi L2 | Sri Vaishnavi Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | |||||
| 2.00 | Foundation | 55.73 | M3 | 300 ₹16,718.4 | 210 ₹11,702.88 |
| 3.00 | For plinth beam | 7.82 | M3 | 109.05 ₹853.27 | 105 ₹821.58 |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 8.8 | M3 | 1,811.7 ₹15,943.32 | 1,811.7 ₹15,943.32 |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 8.8 | M3 | 5,751.57 ₹50,614.97 | 5,751.57 ₹50,614.97 |
| 6.00Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graD/F hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommenD/F proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | |||||
| 7.00 | Foundation and basement | 28.52 | M3 | 8,936.03 ₹2,54,831.22 | 8,800 ₹2,50,952.02 |
| 8.00 | ground floor | 5.69 | M3 | 9,100 ₹51,749.43 | 9,091.21 ₹51,699.44 |
| 9.00 | Supply and fabrication of steel using TMT & RTS bars with including cost and conveyance of all materials and including all labour charges etc complete | 1,710.2 | Kg | 95.42 ₹1,63,187.4 | 85 ₹1,45,367.11 |
| 10.00Providing centering and shuttering works using MS sheet moulds and soffits with including cost and conveyance of all materials and including all labour charges etc complete | |||||
Tender Value
₹22.8 L
EMD Value
₹22,800
Closing Date
6 Jul 2026, 3:00 pmClosed
THE COMMISSIONER
AVADI CITY MUNICIPAL CORPORATION
Construction of compound wall at Siva skathi Nagar Kalaijar Park in Ward no 32
2026_MAWS_682594_1
Roc No.3016/2026/E1_14
Open Tender
Civil Works
90 days
ACMC
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹22,800
6 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | - | - | - | - |
| 2 | Foundation | 55.73 | M3 | - | - |
| 3 | For plinth beam | 7.82 | M3 | - | - |
| 4 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 8.8 | M3 | - | - |
| 5 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 8.8 | M3 | - | - |
| 6 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graD/F hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommenD/F proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | - | - | - | - |
| 7 | Foundation and basement | 28.52 | M3 | - | - |
| 8 | ground floor | 5.69 | M3 | - | - |
| 9 | Supply and fabrication of steel using TMT & RTS bars with including cost and conveyance of all materials and including all labour charges etc complete | 1,710.2 | Kg | - | - |
| 10 | Providing centering and shuttering works using MS sheet moulds and soffits with including cost and conveyance of all materials and including all labour charges etc complete | - | - | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_820495.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid