Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹9.8 L+₹41,700 (4.45%)Rejected-Finance | 2 | Rejected-Finance Reject |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
13 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Leh
GE (AF) Leh C/O 56 APO
REPAIR REPLACEMENT OF WATER SERVICE TANK CLEANING OF UG SUMPS AND OH TANKS AND CONNECTED ACCESSORIES AT AF STATION LEH UNDER GE (AF) LE
2022_MES_517764_1
GE(AF)/LEH/T-09/2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE (AF) Leh
As Per Tender documents
8 documents required · 8 mandatory
₹500
GE (AF) Leh
₹24,000
Yes
27 May 2022
11 Apr 2022
16 May 2022
11 Apr 2022
13 May 2022
29 Apr 2022
60 days
Amount
M&L for cleaning of FRP overhead tank of 50,000 ltrs capacity by adopting following method :- (a) Removing accumulated sludge and solid particles etc. deposited at the bottom of tank and removing the same to a distance not exceeding 50 mtr away complete all as specified and directed by Engr-in-Charge. (b) Washing with clean water bleaching powder solution by rubbing with wire brush on all side walls and bottom of the tank and removing grits and other deposited materials complete inside, outside of the tank and applying two coats of water bound paint suitable for FRP making it absolutely germ free complete all as specified and directed by Engr-in-Charge. (c) Checking for any leakages and rectifying the same with the help of an adhesive suitable for FRPs.
M&L for cleaning of steel overhead tanks of 25,000 ltrs capacity by adopting following method :- (a) Removing accumulated sludge and solid particles etc deposited at the bottom of tank and removing the same to a distance not exceeding 50 mtr away complete all as specified and directed by Engr-in-Charge. (b) Fabrication & welding work with the specified size of MS plain sheet and angle iron to steel tank to stop leakages complete including replacement of rusted nuts & bolts alongwith washers of required size all as directed by Engr-in-charge. Before executing the work as mentioned in Srl Item No. 2.00, the tank shall be tested for any leakages and necessary rectifications shall be done at no extra cost. The cost of nuts , bolts and washers shall be deemed to be included in the quoted rate. (c) Washing with clean water bleaching powder solution by rubbing with wire brush on all side walls and bottom of the tank and removing grits and other deposited materials complete inside, outside of the tank and applying two coats of water bound paint suitable for steel after one coat of red oxide primer making it absolutely germ free, complete all as specified and directed by Engineer-in-Charge.
M&L for cleaning of under ground/ semi underground sumps/ Static Water Tank of 25,000 ltrs capacity by adopting following method :- (a) Taking out the water from the sump with the help of monoblock/submersible pump set and removing accumulated sludge and solid particles etc. deposited at the bottom of sump and removing the same to a distance not exc 50 meter away complete all as specified. (b) Washing with clean water bleaching powder solution by rubbing with wire brush on all side walls, dome portion and bottom of the tank and removing grits and other deposited materials complete inside and from the outside of sump and wash with two coat of cement wash, plastering internally with 15mm thick in cement mortar 1:6 & flush pointing externally in the same mortar. (applying two coats of water bound distemper making it absolutely germ free) complete all as specified and dircted by Engineer-in-Charge.
M&L for cleaning of overhead tanks of 10,000 ltrs capacity by adopting following method :- (a) Removing accumulated sludge and solid particles etc deposited at the bottom of tank and removing the same to a distance not exceeding 50 mtr away complete all as specified. (b) Washing with clean water bleaching powder solution by rubbing with wire brush on all side walls, dome portion and bottom of the tank and removing grits and other deposted materials complete inside and from the outside of the tank, plastering internally wtih 15mm thick in cement mortar 1:6 & flush pointing externally in the same mortar to stop leakages (applying two coats of water bound distemper making it absolutely germ free) complete all as specified and dircted by Engineer-in-Charge.
M&L for painting to overhead tank of capacity 50000 ltrs, painting to staging and steel ladder all along the overhead tank approx 15 mtr high, by applying one coat of red oxide primer and two coats of synthetic enamel paint (smoke grey or as specified by Engineer-in Charge) inlcuding preparation of old painted surfaces and writing "Tank cleaned on the date" and next due date with white paint complete on the base of black paint, complete all as specified and dircted by Engineer-in-Charge.
M&L for painting to steel overhead tank of capacity 25000 ltrs by applying one coat of red oxide primer and two coats of synthetic enamel paint black including preparation of old painted surfaces and writing "Tank cleaned on the date" and next due date with white paint on the base of black paint, complete all as specified and dircted by Engineer-in-Charge.
M&L applying two coats of white wash to overhead tank of capacity 10000 Ltrs including preparation of old surface and writing "Tank cleaned on the date" and next due date with white paint complete on the base of black paint complete all as specified and dircted by Engineer-in-Charge.
M&L applying two coats of white wash to underground / semi underground sump including preparation of old surface and writing "Tank cleaned on the date and next due date" in white with synthetic enamel paint complete on the base of black paint, complete all as specified and dircted by Engineer-in-Charge.
S&F in repair Ball brass valve, high pressure with polythene float and fly nut complete ISI marked of size 20mm, complete all as specified and dircted by Engineer-in-Charge.
S&F in repair Ball brass valve, high pressure with polythene float and fly nut complete ISI marked of size 15mm, complete all as specified and dircted by Engineer-in-Charge.
Renewal of rotational moulded polyethylene water storage tank (cylindrical vertical with close top) heavy duty PEF-PUF insulated 75mm thick storage tank ideally suitable for extreme temperature - 30C to + 35C conditions and outer FRP (Fiber glass reinforced Plastic) layer, of storage capacity 500 Ltrs ISI Mark including connecting inlet and outlet connections complete all as specified and dircted by Engineer-in-Charge. Make: Syntax or equivalent as per direction of Engr-in-Charge.
Renewal of rotational moulded polyethylene water storage tank (cylindrical vertical with close top) heavy duty PEF-PUF insulated 75mm thick storage tank ideally suitable for extreme temperature - 30C to + 35C conditions and outer FRP (Fiber glass reinforced Plastic) layer, of storage capacity 1000 Ltrs ISI Mark including connecting inlet and outlet connections complete all as specified and dircted by Engineer-in-Charge. Make: Syntax or equivalent as per direction of Engr-in-Charge.
Disconnecting existing tanks of size 300 Ltrs to 500 Ltrs setting aside (for lowering ) and cleaning of all scaling all dirt etc. Hoisting reconnecting and refixing in position including Preparation of old painted surfaces and writing "Tank cleaned on the date" and next due date with white paint complete on the base of black paint complete all as specified and dircted by Engineer-in-Charge.
Disconnecting existing tanks of size 1000 Ltrs on the ground (for lowering ) and cleaning of all scaling all dirt etc. Hoisting reconnecting and refixing in position including preparation of old painted surfaces and writing "Tank cleaned on the date" and next due date with white paint complete on the base of black paint complete all as specified and dircted by Engineer-in-Charge.
S&F in replacement Rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I, of storage capacity 500 Ltrs ISI Mark including connecting inlet and outlet connections complete all as specified and dircted by Engineer-in-Charge.
S&F in replacement Rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I, of storage capacity 1000 Ltrs ISI Mark including connecting inlet and outlet connections complete all as specified and dircted by Engineer-in-Charge.
S&F of Sluice Valve Class PN 1.6 of 200mm Dia at given location, complete all as specified and dircted by Engineer-in-Charge.
S&F of Non Return Sluice Valve of 200mm Dia at given location, complete all as specified and dircted by Engineer-in-Charge.
Note : Schedule of credit to be deducted on acceptances of bid.Details of Schedule of credit is given in tender documents
osho traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .