| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹3,347.50 (0.85%)Rejected-AOC 2ND FLOOR 76A PHUL SARAI RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.0 L+₹8,124.30 (2.07%)Rejected-AOC KEDLA NAGAR 09 P O KEDLA P S MANDU DISTT RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
17 Oct 2024, 5:00 pmClosed
Shashi Bhushan Kumar, Project Engineer(Excv)
Jharkhand OCP, PO-Kedla, Dist- Ramgarh, Pin- 825325
Repairing of isolator, VCB and Main Transformer 63 KVA, 3.3 KV alongwith magnetic amplifiers -03 Nos. (Hoist, crowd and swing/ propel) in HMB 596 shovel of Jharkhand OCP.
2024_CCL_318978_1
PE(X)/JOCP/NIT/24-25/12 Dated -09.10.2024
Open Tender
Excavation Department Work
Item Rate
5 days
Jharkhand OCP
As per tender document
2 documents required · 2 mandatory
₹5,000
22 Nov 2024
9 Oct 2024
18 Oct 2024
9 Oct 2024
17 Oct 2024
9 Oct 2024
9 Oct 2024 - 14 Oct 2024
Amount
A. Repairing of isolator Repairing of handle mechanism with new materials
Repairing and replacement of fixed and moving contacts, insulator and Arc chute
Repairing of Tie rod and its mechanism
Supervisor: 01 person X 03 days
HT Electrician: 02 person X 03 days
Helper: 02 person X 03 days
B. Repairing of VCB : Replacement of vacuum interrupter bottles.
Replacement of economy resistance
Replacement of holding coil
Replacement of flexible connections, terminals and support insulators.
Supervisor: 01 person X 03 days
HT Electrician: 02 person X 03 days
Helper: 02 person X 03 days
C. Repairing of Transformer : Copper wire for winding ((-) Less scrap value = 60% )
Cost of insulation (15% of sl.no. 1)
Brass studs with bushings
Supervisor: 01 person X 03 days
HT Electrician: 02 person X 03 days
Helper: 03 person X 03 days
D. Repairing of 03 Nos. Magnetic Amplifiers (Hoist, crowd and swing/ propel) : Replacement of main transformer coil (-) Less scrap value
Replacement of control winding
Replacement of choke coil
Replacement of main diode 40A, 1200PIV
Replacement of bridge unit potentiometer 1 Kohm/ 50W
Replacement of pot resistance 200ohm/50W, 51ohm/50W, 1.6Kohm/50W
Supervisor – 01 person X 02 days
HT Electrician – 03 person X 02 days
Helper – 03 person X 02 days
Contractor’s Profit @10%
Total impact of GST for the purpose of CTC
VIDYA ENTERPRISES
AVYA ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_330626.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .