Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹2.0 Cr+₹2.7 L (1.34%)Rejected-Finance | L2 | Rejected-Finance Being 2nd lowest bidder | |
| 3 | L3₹2.1 Cr+₹6.5 L (3.26%)Rejected-Finance | L3 | Rejected-Finance Being 3rd lowest bidder | |
| 4 | L4₹2.2 Cr+₹18.6 L (9.30%)Rejected-Finance VILLAGE NIRSU P O DUTTNAGAR TEHSIL RAMPUR BSR DISTT SHIMLA H P | DUTTNAGAR | SHIMLA | HIMACHAL PRADESH | L4 | Rejected-Finance Being 4th lowest bidder | |
| 5 | L5₹2.4 Cr+₹44.2 L (22.1%)Rejected-Finance | L5 | Rejected-Finance Being 5th lowest bidder |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
6 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Kumarsain Division HPPWD Kumarsain
C/O Ice Skating Rink ie Civil Work and Site Development ic Retaining walls etc
2026_PWD_127071_1
PW-KMS-AB-NIT/2025-26-7963-64 dt 28.01.2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Kumarsain
Please refer Tender documents.
13 documents required · 13 mandatory
₹7,000
₹4.7 L
18 Feb 2026
1 Feb 2026
7 Feb 2026
1 Feb 2026
6 Feb 2026
1 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work by mechanical means all heights and depths in all kinds of soils, including saturated soils comprising of pick work , Jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including, dewatering where required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in - charge at site, according to the HP.PWD. specification of 1990 (One Thousand Nine Hundred Ninety) Volume-I (One) and sorting out useful and unuseful matreial and transportation of the unuseful matreial for disposing at dumping site (To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load, animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone, shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge. The recovery for stones, weather useful or not, for the minimum quantum of 366.60 cubic meter (Three Hundred Sixty Six Point Sixty) @ Rupees 300/- only (Rupees Three Hundred) per cubic meter shall be effected on pro rata basis in all circumstances. Any loss to the public and private properity during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all taxes (GST etc.) and incidental charges. | 7,332 | Per Cubic Metre | 237 | ₹17,37,684 |
| 2 | Excavation in hilly area in all heights and depths in all kinds of soil in retaining walls, breast walls including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiselling and wedging out of rocks (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in-Charge at site., according to the HP.PWD. specification pf 1990 (One thousand Nine hundred Ninety) volume-I (One) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer-inCharge through all modes of transportation including head load, animal load or mechanucal means along with its leveling fine dressing and with all kinds of labour (if required). All useful material such as stones, i.e. shingles and slates shall be properly stacked at site recovery to the maximum possible extent in all lesds and lifts through all modes of transportation and used/removed as per the direction of the Engineer-in-Charge. Any loss to the public and private properity during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all taxes (GST etc.) and incidental charges. | 531.75 | Per Cubic Metre | 309.5 | ₹1,64,576.63 |
| 3 | Excavation in foundation trenches in earth work in all heights and depths in all kinds soils including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including dewatering where required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in - charge at site, according to the HP.PWD. specification of 1990 (One Thousand Nine Hundred Ninety) Volume-I (One) and sorting out useful and unuseful matreial and transportation of the unuseful matreial for disposing at dumping site (To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load, animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone, shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge. Any loss to the public and private properity during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all taxes (GST etc.) and incidental charges. | 834.02 | Per Cubic Metre | 235.35 | ₹1,96,286.61 |
| 4 | Earth work in excavation for all type of road structures such as retaining walls, breast walls, culverts, drains and parapets etc. in all type of classification of soil comprising of ordinary soil, soft/ hard rocks, chiselling / wedging out of rocks (where blasting is prohibited) as per drawing and MORD technical specifications Clause 305.1, 1104 and 1606.1 and as per directed by the Engineer-in-Charge including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal of materials upto all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the orginal surface in layers not exceeding 150mm (One Hundred Fifty Milimeters) compected thickness including shorting and strudding and pumping and bailing out water (surface and sub soil water) upto all depth and any quantum of water including cleaning of slush which may arise out during dewatering as as per direction of Engineer-in-Charge and including carriage of material within all leads and lifts and with all taxes (GST etc.). | 550.43 | Per Cubic Metre | 174.8 | ₹96,215.16 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials through all modes of transportation with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge and with all taxes (GST etc.). | 145.6 | Per Cubic Metre | 1,935.75 | ₹2,81,845.2 |
| 6Centering and shuttering including strutting, propping etc and removal of the form for including entire carriage of materials through all modes of transportation with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge and with all taxes (GST etc.). | |||||
| 6.1 | Foundation footing and basis of columns, etc. and mass concrete. | 26.4 | Per Square Metre | 254.3 | ₹6,713.52 |
| 6.2 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 150 | Per Square Metre | 484.1 | ₹72,615 |
| 6.3 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like | 42 | Per Square Metre | 536.2 | ₹22,520.4 |
| 6.4 | Stairs, (excluding landings) except spiral staircases | 28.4 | Per Square Metre | 638 | ₹18,119.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.19 MB
SBD.pdf
Tender Document • 2.40 MB
BOQ_187567.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .