| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.1 LAccepted-AOC AT KUCHANA POST KUCHANA TAH BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | MAHARASHTRA | 442503 | L-1 | Accepted-AOC Work awarded | |
| 2 | L-2₹8.8 L+₹1.7 L (24.2%)Rejected-Finance AT KUCHANA BASTI POST KUCHANA TAHSIL BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442503 | L-2 | Rejected-Finance Due to L-2 bidder. | |
| 3 | L-3₹9.2 L+₹2.1 L (30.2%)Rejected-Finance | L-3 | Rejected-Finance Due to L-3 bidder. | |
| 4 | L-4₹9.3 L+₹2.2 L (31.7%)Rejected-Finance CAMP JAYU MAJRI COLLIERY PO SHIVAJINAGAR TEHSIL BHADRAWATI DISTRICT CHANDRAPUR MS | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | L-4 | Rejected-Finance Due to L-4 bidder. |
Tender Value
₹8.9 L
EMD Value
₹11,200
Closing Date
20 Aug 2024, 12:00 pmClosed
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Construction of wall compound surrounding area of Samaj Bhawan in Charukhati Village under CSR works under Amalgamated Yekona Mines at Yekona Sub Area of Majri Area
2024_WCL_314738_3
ma9511-civ-e012-2024-25/296 Dated 09.08.2024
Open Tender
Civil Works - Others
Item Rate
90 days
Charurkhati Village
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,200
10 Sept 2024
9 Aug 2024
22 Aug 2024
10 Aug 2024
20 Aug 2024
10 Aug 2024
10 Aug 2024 - 17 Aug 2024
Amount
Deployment of excavator machibne(JCB or equivalent)including cost of operator and one manpower (helper), diesel,mobile oil etc. for cleaning of bushes/jungle and levelling/road side excavation and stacking within a lead of 50mtrs etc.all complete job as per instruction of Engineer-in-charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (Not exceeding 1.5 m in width or 10 Sqm on plan) including dressing of sides and ramming of bottom,lift upto 1.5 m including getting out of excavated soil and disposal of surplus excavated soil as directed within alead of 50 m. All kind of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from Natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength upto plinth level : Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in superstructure above plinth level up to floor V level in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Finishing walls with premium Acrylic smooth exterior paint with Silicone additives of required shade : New work (Two or more coats applied @ 1.67 ltr/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter, excluding GST levied by GOI and GOM in all respect, including inspection charges, transport to departmental stores/site, unloading and stacking etc. complete as per IS-458/1988 Class NP-III (For 2.50 M. length) 900 mm
Painting,writing on boards with two coat base paint of approved quality enamel paint and painting and writing in english/hindi in required shade including the cost of all materials,labour etc. complete as per instruction of eng-in-charge
Total impact of GST for the purpose of CTC
SANTOSH KHOLGADE
VISHWARANJAN KUMAR SINGH
SINGH CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .