Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 LAccepted-AOC 3 147 KPN NAGAR MELTUR DAM 636 401 | SALEM | TAMIL NADU | 636401 | ₹1.5 L Quoted ₹1.4 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | K.DHANASEKARAN ENGG. CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Removal and Re-Insulation of HP/IP Control Valves: a) Removal of insulation of HP/IP control valve, cleaning and disposal of removed insulation including transportation. | 8 | Nos | 5,450 ₹43,600 |
| 2.00 | b) Re-insulation of HP/IP control valve, painting, claddings aluminum sheet & cleaning. Including transportation. | 8 | Nos | 5,450 ₹43,600 |
| 3.00 | c) Plastering the cement on the insulation of HP/IP Control valves and finishing. Cleaning the waste cement from the TG floor and providing the suitable thermal safety appliances for handling the hot spots. Transporting the cement from pocket store to work spot. | 8 | Nos | 1,850 ₹14,800 |
| 4.00 | Removal and Re-insulation of LPT Gland steam pipes: Removal of LP front & Rear gland steam pipes insulation, re-insulation, Aluminium cladding after fixing of LP front & rear gland steam pipes etc. | 1 | Unit | 16,700 ₹16,700 |
| 5.00 | Cost for Epoxy light grey base with accel (Insulation paint) | 30 | Litre | 500 ₹15,000 |
| 6.00 | Charges for Consumables and T&P’s item for Sl.No:1 to 4 | 1 | LS | 2,300 ₹2,300 |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
24 Nov 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit II Removal and Re insulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
2025_EB_621968_1
CE / MTPS-I / SE / M-I / TM /OT. 352 / 2025-26
Open Tender
Power/Energy Projects/Products
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹1,500
Yes
18 May 2026
10 Nov 2025
25 Nov 2025
10 Nov 2025
24 Nov 2025
10 Nov 2025
Amount
Removal and Re-Insulation of HP/IP Control Valves: a) Removal of insulation of HP/IP control valve, cleaning and disposal of removed insulation including transportation.
b) Re-insulation of HP/IP control valve, painting, claddings aluminum sheet & cleaning. Including transportation.
c) Plastering the cement on the insulation of HP/IP Control valves and finishing. Cleaning the waste cement from the TG floor and providing the suitable thermal safety appliances for handling the hot spots. Transporting the cement from pocket store to work spot.
Removal and Re-insulation of LPT Gland steam pipes: Removal of LP front & Rear gland steam pipes insulation, re-insulation, Aluminium cladding after fixing of LP front & rear gland steam pipes etc.
Cost for Epoxy light grey base with accel (Insulation paint)
Charges for Consumables and T&P’s item for Sl.No:1 to 4
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_743661.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid