| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | N SETHUPATHI L2 | A.Jayaraman L1 |
|---|---|---|---|---|---|
| 1.00Name of the work: Improvements to existing burial ground with Cremation Shed Compound Wall and CC Road at Pillur Village Keela Theru II in Pillur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 11.3 | cum | 225 ₹2,542.5 | 224 ₹2,531.2 Lowest |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 2.63 | cum | 5,586 ₹14,691.18 | 5,585 ₹14,688.55 Lowest |
| 4.00 | Refilling the basement with excavated earth other than sand complying the Standard specification | 4.55 | cum | 39 ₹177.45 | 38 ₹172.9 Lowest |
| 5.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 5.14 | cum | 2,082 ₹10,701.48 | 2,081 ₹10,696.34 Lowest |
| 6.00 | Brickwork in Cement mortar 1 : 5 mix using country bricks including cost and conveyance of all materials to site and labour charges etc complete. | 7.66 | cum | 5,937 ₹45,477.42 | 5,936 ₹45,469.76 Lowest |
| 7.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g | 45.07 | sqm | 477 ₹21,498.39 | 476 ₹21,453.32 Lowest |
| 8.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods | 500 | cum | 89 ₹44,500 | 88 ₹44,000 Lowest |
| 9.00 | R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 4.86 | Kg | 9,219 ₹44,804.34 | 9,218 ₹44,799.48 Lowest |
| 10.00 | Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 49.77 | sqm | 292 ₹14,532.84 | 291 ₹14,483.07 Lowest |
Tender Value
₹9.8 L
EMD Value
₹9,780
Closing Date
12 Mar 2024, 3:00 pmClosed
Block Development Officer v.p SIVAGANGAI
UNION OFFICE SIVAGANGAI
Improvements to existing Samathuva burial ground with Cremation Shed Compound Wall and CC Road at Pillur Village Keela Theru in Pillur Panchayat
2024_RDTN_445639_1
SVG-AGAMT17-Improvements to existing burial ground with Cremation Shed Compound Wall and CC Road a
Open Tender
Civil Works
Item Rate
90 days
UNION OFFICE SIVAGANGAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,780
9 Sept 2026
9 Mar 2024
12 Mar 2024
9 Mar 2024
12 Mar 2024
9 Mar 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .