Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1 L
Closing Date
12 Oct 2021, 6:55 pmClosed
Xen REW Poonch
Xen REW Poonch
please refer to boq
2021_RDPR_139653_8
e-NIT No. 71 of REW POONCH, Dated 15-09-2021
Open Tender
Civil Works
Item Rate
20 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Xen REW Poonch
Exempted
23 Oct 2021
15 Sept 2021
13 Oct 2021
15 Sept 2021
12 Oct 2021
15 Sept 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(a) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), with P/l of hand packed stone plum 30%, excluding carriage.
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand), with extra for brick work with common burnt clay bricks/ in superstructure above plinth level upto floor five level.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for: (a)Suspended floors, roofs, landings, balconies and access platforms.
(b)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)
Edges of slabs and breaks in floors and walls Under 20 cm wide
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick. First Class kail wood
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
Carriage of Bricks with average distance 16 km by MT
Carriage of sand and Bajri with average distance of 8 km by MT
Carriage of stone with average distance of 300 m by HL
Carriage of cement with average distance of 5 km by MT
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
Jahangir Hussain Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .