| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 2 GROUND FLOOR ALBION PALACE HERITAGE COMPOUND OPP GLORIA CHURCH SANT SAVTA MARG BYCULLA E MUMBAI 400027 BYCULLA | MUMBAI | MAHARASHTRA | 400027 | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 15 VASUDEV HARI NIVAS DATTATRAY NAGAR BADA BAZAAR TUMSAR TH TUMSAR DIST BHANDRA MAHARASHTRA 441912 | BHANDARA | MAHARASHTRA | 441912 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical | Rejected-Technical Technically Disqualified |
Tender Value
₹93 L
EMD Value
₹1.9 L
Closing Date
25 Sept 2020, 12:00 pmClosed
Dy. Conservator
Admin Building, JNPT, Sheva Navi Mumbai
Design, Supply, Installation, Testing, Commissioning and Maintenance of High Velocity Water Spray Fire Protection System at 02 Nos. of 4 MVA oil cooling type Transformer installed at PUB Sub-Station
2020_JNPT_581632_1
JNP/MARINE/PUB-HVWSS/2020/03
Open Tender
Miscellaneous Works
Turn-key
120 days
JAWAHARLAL NEHRU PORT TRUST
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,080
Yes
JAWAHARLAL NEHRU PORT TRUST
₹1.9 L
Yes
Admin Building, JNPT, Sheva Navi Mumbai
9 Nov 2020
4 Sept 2020
28 Sept 2020
4 Sept 2020
25 Sept 2020
4 Sept 2020
10 Sept 2020
Amount
Designing and Drawing
Charges towards Designing of the system and providing Drawing as per requirement of the JNPT Fire department.
HVW Spray System for Transformers
Supply of Automatic Deluge valve with all accessories (Water motor gang, Basic trim and Electrical trims etc.,): 80 NB
Supply of Isolation valve: Sluice Valve :80 NB
Supply of Y-Type Strainer :80 NB
Supply of Piping : G.I Piping as per IS : 1239 Heavy Gr.
Supply of M.S. Black. Heavy Grade as per IS:1239 Part - I, 80 NB
Supply of Detection Line: M.S. Black. Medium Grade as per IS:1239 Part - I,: 25 NB
Supply of Spray Nozzle Brass
Supply of Q.B. Detector 79 Deg.
Supply of Pressure gauges
Supply of Pressure switches
Supply of Deluge Valve Local Control Panel with Push Button
Supply of Pylon supports : 50 NB
Supply of MS Supports
Supply of Fitting (Elbow / Tee/Socket/Reducer/Flanges)
Supply, Installation, testing & commissioning of FIRE PUMP system
PUMP HOUSE EQUPMENT
Supply of Horizontal split casing centrifugal pump rated duty 171m3/hr capacity 70 MWC head 1500 RPM electric motor driven, coupled with suitable capacity of electric motor, mounted on common base plate, control panel, interconnection control cablings, and other accessories etc.
Supply of Horizontal end suction centrifugal jockey pump of rated capacity 10.8 m3/hr at 88 MWC head 2900 RPM, driven by electric motor set coupled with suitable capacity of TEFC Electrical motor mounted on common base plate, control panel for jockey pump, interconnection control cabling and other accessories etc.
Supply of Pressure Gauge, and Isolation valve
Supply of Pressure Switch, and Isolation valve
Supply of MS Piping to IS 1239 (H) /3589, 'C' Class, with fittings & painting etc.
80mm NB, ERW, BE (suction from each water tank ) to common suction header in p/house
150mm NB, ERW, BE ( common Suction Header)
100 mm NB, ERW, BE ( suction + Discharge of pump and common discharge Header and test header)
80mm NB, ERW, BE ( for JP suction and header)
25/20 mm NB, ERW, PE
Supply of CI Gate Valve, with companion flanges, N, B & G.
100 mm NB, Std valve hand wheel operated (for main pump suction)
80 mm NB, Std valve hand wheel operated (for main pump delivery & Test valve, JP suction and one each at discharge of fire water storage tank).
150 mm NB, Std valve hand wheel operated (for main pump suction)
Supply of CI Check Valve with companion flanges, N, B & G.
Supply of Carbon Steel Y-Strainer, SS-304 Internals, 150#, RF with companion flanges, N, B &
100mm NB (for main pump suction)
Supply of Gate Valve A105, 3/4" valve, API 602, 800#, SW for drains and vents
Supply of Motor Control Centre for one LT motor, jockey pump motor panel load
Supply of Power Cables/Control Cables as per site requirement.
CIVIL work like construction of Fire Pump shed & fire Pump RCC foundations
FW storage tank & accessories
Supply of Model No. ZA09R3, Fire Water Metal Storage Tank. Dia (Mtr) 8.31, Height (Mtr.) 3.20, Gross Volume litres 1,00,000 Tanks shall include wall, Self-Supporting Dome Roof, 4 No of HDG Nozzles, F&B Type Level Indicator , Turbine Vent (SS) , Access Hatch on Roof of Tank , External Cage Ladder & Internal Rope Ladder. Work Time; 1.5 Month. float valve arrangement from the nearest JNPT water supply tapping.
Construction of Civil Foundation for FW storage suitable for 04 nos. tanks
Supply of Fittings for fire pump house piping
Supply of RCC/PCC/Steel supports for P/House Piping
Supply of Fire Extinguishers & Bucket.
75 Kg. DCP Extinguishers, ISI mark
50Ltrs.AFFF Foam Extinguishers, ISI Mark.
9Ltrs. Fire Bucket with Stand
Installation Testing & Commissioning Charges for all the above items
Sub Total Supply & Installation Cost
Reliance Fire Protection Sytems
Sai Industries
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .