Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAccepted-Finance | ₹27.2 L | L1 | Accepted-Finance As per Boq comparative statement generated |
| 2 | L2₹29.8 L+₹2.6 L (9.71%)Accepted-Finance PHYANG LEH | ₹29.8 L+₹2.6 L (9.71%) | L2 | Accepted-Finance As per Boq comparative statement generated |
| 3 | L3₹30.2 L+₹3.0 L (11.0%)Accepted-Finance | ₹30.2 L+₹3.0 L (11.0%) | L3 | Accepted-Finance As per Boq comparative statement generated |
| 4 | L4₹30.9 L+₹3.7 L (13.5%)Accepted-Finance | ₹30.9 L+₹3.7 L (13.5%) | L4 | Accepted-Finance As per Boq comparative statement generated |
Tender Value
₹45.1 L
EMD Value
₹1.1 L
Closing Date
29 Jun 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Strengthening of Irrigation Canal Gongyur Choglamsar(Under Capex)
2026_PWD_19059_2
15 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
90 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹1,000
Payable To Executive Engineer InFC division Leh
₹1.1 L
2 Jul 2026
12 Jun 2026
1 Jul 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil | 143.55 | Cum | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge. All kinds of soil | 335.56 | Cum | 1 | ₹335.53 |
| 3 | Dry stone pitching (any thickness) including cost of stones. On Horizontal | 90.18 | Cum | 1 | ₹90.17 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor
blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 20 mm nominal size derived from natural sources) | 302.43 | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form
work for :Foundations, footings, bases for columns | 1,461.6 | Sqm | 1 | ₹1,461.45 |
| 6 | Structural steel work in single section, fixed with or without connecting plate,
including cutting, hoisting, | 1,880 | Kgs | 1 | ₹1,879.81 |
| 7 | Providing and fixing of water rubber seal 25mm thickness. | 18 | Mtrs | - | - |
| 8 | Providing and fixing of winch gear box system with rod and handle complete for hydraulic gate. | 3 | Nos | - | - |
| 9 | Carriage of material from source to site of work by MT a)Cement an avg lead 6 km | 96.78 | MT | - | - |
| 10 | b)Sand an avg lead 15 km | 142.14 | Cum | 1 | ₹142.13 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_45460.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .