Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-Finance | 1 | Accepted-Finance Quoted amount verified and accepted | |
| 2 | 2₹10.4 L+₹1.6 L (17.9%)Accepted-Finance | 2 | Accepted-Finance Not the Lowest Bidder, higher than L1 quote |
Tender Value
₹14.8 L
EMD Value
₹15,000
Closing Date
18 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Engineer
Office of the Divisional Engineer, Highways, Construction and Maintenance, Ulundurpet
Maintenance to the Government roads in Ulundurpet Highways C and M Sub division for the year 2026 - 27
2026_HWAY_719079_1
TN.1/2026-27/SDO/Dt.26.10.2026
Open Tender
Civil Works - Highways
Percentage
180 days
Ulundurpet
Please refer Tender documents
6 documents required · 6 mandatory
₹0
₹15,000
Yes
24 Nov 2026
30 Oct 2026
18 Nov 2026
30 Oct 2026
18 Nov 2026
30 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | - | - | - | - |
| - | MDR | 260 | Square Metre | 36.18 | ₹9,406.8 |
| 2 | Providing and laying Bituminous Concrete to 430mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Gr-II | - | - | - | - |
| - | MDR | 7.8 | Cubic Metre | 18,164.2 | ₹1,41,680.76 |
| 3 | Collection and supply of 13.20 mm IRC size HBG metal from approved quarry including cost and conveyance of metal, labour charges for loading unloading and stacking Departmental metric gauge for taking pre measurement etc. complete. in T .B Compound at Ulundurpet Sub Division | - | - | - | - |
| - | ODR | 95 | Cubic Metre | 2,100.98 | ₹1,99,593.1 |
| 4 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | - | - | - | - |
| - | ODR | 110 | Cubic Metre | 2,619.31 | ₹2,88,124.1 |
| 5 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. for Earthen Drain | - | - | - | - |
| - | MDR | 100 | Cubic Metre | 131.89 | ₹13,189 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
uptbid.pdf
Tender Documents • 0.58 MB
BOQ_863638.xls
BOQ • 0.34 MB
corrigendum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .