| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC AT JHIRKEY PO KATHARA BOKARO 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC ACCEPTED AS L1 AS PER NIT | |
| 2 | Rejected-Technical AT JHIRKEY PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | - | Rejected-Technical Not accepted as per NIT | |
| 3 | Rejected-Technical AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | - | Rejected-Technical Not accepted as per NIT |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
18 Jan 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
P.E. (EnM), Office of the PO, Kathara Colliery
Project Engineer (EnM), Kathara Colliery
(A) Making of baseplate and matching work for installation of new 350KW, 6.6KV Motor with 2000GPM Pump at 2 no Quarry (B) Along with making and installation of new water column at 1 no. quarry haul road and installation and (C ) Matching work of 100
2025_CCL_325064_1
KTC/PE/EnM/24-25/183 Date-06.01.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
P.E. (EnM), Office of the PO, Kathara Colliery
(A) Making of baseplate and matching work for installation of new 350KW, 6.6KV Motor with 2000GPM Pump at 2 no Quarry (B) Along with making and installation of new water column at 1 no. quarry haul road and installation and (C ) Matching work of 100
6 documents required · 6 mandatory
₹3,800
Yes
19 Feb 2025
7 Jan 2025
20 Jan 2025
8 Jan 2025
18 Jan 2025
8 Jan 2025
8 Jan 2025 - 14 Jan 2025
Amount
MS Channel, size =150 mm x75 mm x5.7 mm channel (2.25x33''x8No=594cm=6m length)----> 6m x16.8 kg/m=100.8 kg per baseplate.
MS plate, soze 8mm, (4x0.5'x0.7'+4x0.6'x0.6+8x0.25x0.25)x1.15 (scrap) x5.87 sqft/kh=22.54 kg per baseplate
Rail/section (200mmx100mm); 2.25x(2.125''+4x33")=8.6x24.20Kg/m=208.12 kg per baseplate
Transportation cost of Material
Welder=02 no x02 Shift
Fiter / Denter= 02 no x 02 shift
Unskilled=06 no xz 02 shift
Supervisor =01 no x 02 shift
oxygen charges for cutting and welding
D.A Charges
Welding Electrode
Gas Cutting set
Welding set
H.T Nut & bolts with washer for foundation
Supervision incidental & OH Expenses @ 15% for itenm no 1 to 14
Making and fitting of reducer 6''/4'' (6''----> 4'')
Making andfitting of 4'' bend from pipe of length 2.5 mtr approx using cutting & Welding
Installation of water column
Dismantling and shifting / carriage of water column
Laying in position of 6'' dia. Pipe
Making andfitting of 6'' dia pipe of length 2.5 mte approx using cutting & Welding
Supply and fixing of flange 6'' diameter with collar including rubber inserations
Making andfitting of Reducer (8'' to 6" of length 2.5 ft
Supply and fixing of foot valve 8' diameter
Total impact of GST for the purpose of CTC
technical_336948.pdf
PDF • 0.26 MB
techsummary_336948.pdf
PDF • 1.01 MB
finance_336948.pdf
PDF • 0.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_336948.pdf
PDF • 0.81 MB
LOA_NIT_183.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .