| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | ₹2.0 L | 1 | Accepted-Finance Admitted |
| 2 | 2₹2.3 LRejected-Finance | ₹2.3 L | 2 | Rejected-Finance Notadmited |
| Sl No | Description | Qty | Unit | SNH KAFIL CONSTRUCTION L1 | SRD CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock including Cost conveance and labour charges ect, completd. | 5.91 | cum | 263.78 ₹1,558.94 | 320 ₹1,891.20 |
| 2.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 2.04 | cum | 5,344.82 ₹10,903.43 | 5,500 ₹11,220 |
| 3.00 | Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. UPTO BASE | 3.55 | cum | 6,101.12 ₹21,658.98 | 6,250 ₹22,187.50 |
| 4.00 | Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. ABOVE BASE | 5 | cum | 6,193.99 ₹30,969.95 | 6,600.25 ₹33,001.25 |
| 5.00 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 0.78 | cum | 9,066.52 ₹7,071.89 | 9,400 ₹7,332 |
| 6.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 0.08 | sqm | 91,858.5 ₹7,348.68 | 92,000 ₹7,360 |
| 7.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 6.38 | sqm | 1,095 ₹6,986.10 | 1,250 ₹7,975 |
| 8.00 | Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc | 4.39 | sqm | 1,061.67 ₹4,660.73 | 1,300 ₹5,707 |
| 9.00 | Dadoing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface | 1.91 | cum | 1,429.43 ₹2,730.21 | 1,650 ₹3,151.50 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 12.94 | cum | 308.85 ₹3,996.52 | 400 ₹5,176 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
29 Jan 2026, 3:00 pmClosed
Panchayat President
Panchayat Office, Neikuppi Panchayat
Construction of Mini CSC (Type 2, Design 2) in Neikuppi village Near Anjaneyar Kovil Street at Neikuppi Panchayat in Thirukkazhukundram Panchayat Union
2026_RDTN_646242_1
3590/2025/A6
Open Tender
Civil Works
180 days
Neikuppi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
Yes
13 Mar 2026
23 Jan 2026
29 Jan 2026
23 Jan 2026
29 Jan 2026
23 Jan 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock including Cost conveance and labour charges ect, completd.
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. UPTO BASE
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. ABOVE BASE
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadoing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
PC Door 1.2x2.1
Toilet Door 0.75x2.1
Painting two coats with approved Oil Bound Distemberpaint over one coat of Priming coat over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coats with approved Plastic Emulsion paint over one coat of Priming coat over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Cost and supply of IWC
Cost and supply of EWC
Cost, Supply and fixing of Precast RCC Ring, including all cost and labour
Round Slab
110 mm dia pvc pipe
110mm PVC Door Bend
110mm PVC TEE
500 lit HDPE tank
Towards internal water supply arrangements (taps for toilet unit) and Electrification
Cost and supply of RCC jolly
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_774638.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Techbid.pdf
Tender Documents • 0.91 MB
BOQ_774638.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid