| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹11.1 L+₹81,300 (7.89%)Rejected-Finance 67 KAILASH VIHAR TIWARIPUR BAGIA JAJMAU KANPUR 208010 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208010 | L2 | Rejected-Finance Being other than lowest |
Tender Value
₹13 L
EMD Value
₹26,000
Closing Date
21 Jan 2020, 6:00 pmClosed
GE (AF) E/M Chakeri Kanpur
GE (AF) E/M Chakeri Kanpur 208008
MANNING AND OPERATION OF CENTRAL AC PLANT AT E AND IRS CRS RED BARRON RSG NEW AND OLD IRS 102 BLOCK PACKAGE AC AMU H N 7 AND 8 ETC AT AFS CHAKERI KANPUR
2019_MES_307825_1
8338/E8
Open Tender
Civil Works
Item Rate
335 days
GE (AF) E/M Chakeri Kanpur
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) E/M Chakeri
₹26,000
24 Jan 2020
19 Dec 2019
22 Jan 2020
19 Dec 2019
21 Jan 2020
4 Jan 2020
Amount
Maining and operation of central AC/ Chilling / package AC / Evaporative cooling plant of different capacity at various locations having compressors with its connected items such as condensers / chillers, water circulating pumps, blowers, blower motor, cooling tower with fan and motor including connected starters etc in all respect for smooth running of AC plants during the running period to maintain designed Air Conditioning/chilled water temperature inside the building as per working hours mentioned below and cleaning of all equipments and sweeping inside and outside of the installation and maintaining of log sheet on daily basis and required routine maintenance like tightening of pump gland, filling of new gland and new gland nut bolts and minor electrical complaints of motor pump and panel and starter etc for smooth functioning of plant complete all as specified and directed for the following capacity of plants & working hours : - (a) AC Palnts: (i) 3x50 TR AC Plant at CRS (ii) 3x30 TR AC plant at H No 8 (b) Working hours: (i) From 0630 Hrs to 1700 Hrs on every Monday of week (ii) From 0630 Hrs to 1430 Hrs on every Tuesday to Friday (iii) Saturday, Sunday & Gazetted holiday no operation
All as per item No 1 above but capacity 2 x 25 TR AC Plant at E&IRS & 2X11 TR package AC plant at Bearing lab.
All as per item No 1 above but capacity 3 x 20 TR AC plant at Red Baron, package type AC plant capacity 2 x 5.5 TR and water cooled package type AC 3X5 TR plant at Calibration lab.
All as per item No 1 above but capacity 3 x 60 TR at Module -2.
Maining and operation of central AC/ Chilling / package AC / Evaporative cooling plant of different capacity at various locations having compressors with its connected items such as condensers / chillers, water circulating pumps, blowers, blower motor, cooling tower with fan and motor including connected starters etc in all respect for smooth running of AC plants during the running period to maintain designed Air Conditioning/chilled water temperature inside the building as per working hours mentioned below and cleaning of all equipments and sweeping inside and outside of the installation and maintaining of log sheet on daily basis and required routine maintenance like tightening of pump gland, filling of new gland and new gland nut bolts and minor electrical complaints of motor pump and panel and starter etc for smooth functioning of plant complete all as specified and directed for the following capacity of plants & working hours : - (a) AC Palnts/ Chilling plants: (i) 3x50 TR chilling plant at old IRS (ii) 2x60 TR AC plant at old IRS (iii) 2x40 TR AC plant at old IRS (b) Working hours: (i) From 0600 Hrs to 2200 Hrs (two shift of 08 hrs every except holidays and Sundays at observed by the Air Force Authority)
Notes for Srl Item No. 1 to 5 above (i) Cleaning of all AC plants, machinery and inside and outside location is the responsibility of contractor. (ii) If any operator found absent from duty Rs. 1500/- per day per shift will be recovered from the contractor. (iii) If the contractor failed to commence the work on due date Rs. 2000/- per installation per day will be recovered from the contractor till commencement of the work. (iv) Contractor will provide Police Verification of all operators before comencement of the work. (v) If the contractor failed to provide duty roaster duly affixed photograhph of operator in original before commencement of every month duty Rs. 500/- per day per installation will be recovered from the contractor. (vi) Before commencement of work contractor will provide all documents such as educational qualification, ID proof of operator in duplicate otherwise Rs. 100/- per day will be recovered from the contractor. (vii) Contractor wil be maintain Attendance Register, Visitor register, maintenace record register, daily log sheet, operator payment register and produce every month to the Engineer-in- Charge. (viii) The contractor should be employed only ITI holder in specific trade. (ix) The operator deployed shall be in uniform indicating the name of individual and firm.
Ashirwad Contractor and Supplier
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .