| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | ₹23.7 L | L1 | Accepted-AOC Accept |
| 2 | L2₹23.8 LRejected-AOC 7 25 K N S GARDEN CHENNIMALAIPPALAYAM VEERABANDI POST TIRUPPUR 641 606 | TIRUPPUR | TAMIL NADU | 641606 | ₹23.8 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | KRK CONSTRUTIONS L1 | Umayal Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in sand, silt other loose soilwet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavatedearth etc. with an initial lead of 10m and lift of2m. and as directed by Officers.For Foundation | 40.84 | Cum | 260 ₹10,618.40 | 265 ₹10,822.60 |
| 2.00 | For Foundation 0.0m to 2m depth | 200.09 | Cum | 390 ₹78,035.10 | 395 ₹79,035.55 |
| 3.00 | Levelling coarse in cement concrete1:4:8 (one cement,four sand and eightfor foundation and leveling coarseaggregate) using 40mm hard broken stoneincluding cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed | 1 | Cum | - | - |
| 4.00 | PCC Laying (beyond 1.5 m from GL) | 29.3 | Cum | 5,290 ₹1.5 L | 5,295 ₹1.6 L |
| 5.00 | Levelling coarse in cement concrete1:2:4 (one cement,two sand and fourfor foundation and leveling coarseaggregate) using 20mm hard broken stoneincluding cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed | 1 | Nos | - | - |
| 6.00 | PCC Laying (beyond 1.5 m from GL) | 3.2 | Cum | 6,595 ₹21,104 | 6,600 ₹21,120 |
| 7.00 | Reinforced Cement Concrete1:1.5:3 using Machine crushed 20mm ISSexcluding the cost of reinforcement andHBG stone for the following membersfabricating, centering, shuttering andstrutting charges but including the costof all materials, mixing, placing inposition, lifting, vibrating, finishing& curing, etc. complete.and as directed | 1 | Nos | - | - |
| 8.00 | Beyond 1.50 m & upto 4.50 m below GL | 26.93 | Cum | 9,060 ₹2.4 L | 9,065 ₹2.4 L |
| 9.00 | Upto 1.50 m Below GL | 6.73 | Cum | 9,060 ₹60,973.80 | 9,065 ₹61,007.45 |
| 10.00 | Upto 4.50 m above GL from GL | 16.49 | Cum | 9,060 ₹1.5 L | 9,065 ₹1.5 L |
Tender Value
₹24.9 L
EMD Value
₹25,000
Closing Date
26 Feb 2026, 3:00 pmClosed
Block Development Officer VP
Tiruppur Union Office Court Street Tiruppur 641 604
Construction of 2.00 lakh Litre SUMP at Chettipalayam H/o Mangalam
2026_RDTN_663041_6
378/2026/A2 dt 16.02.2026
Open Tender
Civil Works - Water Works
150 days
Mangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,000
Yes
Tiruppur Union Office
25 Mar 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
24 Feb 2026
Earthwork excavation in sand, silt other loose soilwet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavatedearth etc. with an initial lead of 10m and lift of2m. and as directed by Officers.For Foundation
For Foundation 0.0m to 2m depth
Levelling coarse in cement concrete1:4:8 (one cement,four sand and eightfor foundation and leveling coarseaggregate) using 40mm hard broken stoneincluding cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed
PCC Laying (beyond 1.5 m from GL)
Levelling coarse in cement concrete1:2:4 (one cement,two sand and fourfor foundation and leveling coarseaggregate) using 20mm hard broken stoneincluding cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed
PCC Laying (beyond 1.5 m from GL)
Reinforced Cement Concrete1:1.5:3 using Machine crushed 20mm ISSexcluding the cost of reinforcement andHBG stone for the following membersfabricating, centering, shuttering andstrutting charges but including the costof all materials, mixing, placing inposition, lifting, vibrating, finishing& curing, etc. complete.and as directed
Beyond 1.50 m & upto 4.50 m below GL
Upto 1.50 m Below GL
Upto 4.50 m above GL from GL
joists of size 10cm X 6.5cm space at10cm c/c and supported by Casurino Propsstiffened with MS angle of size 25 X 25X 3mm for boarding laid over Silver Oakstrutting for all RCC works using MSsheets of suitable size of BG 10including necessary supports andshuttering for soffits and sidesSupply and erection of steel centering,10cm - 13cm spaced at 75cm c/c etc.,complete and as directed by
For 0.00 to 3.30 M (Plane Surface)
For 0.00 to 3.30 M (Curved Surface)
For 0.00 to 3.30 M (FOR ROUND COLUMN)
For 3.30 M- 4.3 M (Plane Surface)
Supplying, fabricating and placing inposition of RTS rods for reinforcementincluding cost of steel and bindingwire, labour charges etc., complete forRCC works and as directed by Officers.For RCC Works
Supply,Delivery and fixing of CI Manholeframe with cover of following sizeincluding cost of all materials, fixingof MS clamps,Bolt and nuts etc.,completeand as directed by Officers.Size 0.60m x0.60m
Plastering with Cement Motor 1:3 mix, to 10mm thick including all cost of Materials& curing, etc. complete.and as directedby TWAD Board Officers.
Painting two coats with best Emulsion paintincluding all cost of Materials& labour charges etc. complete.and as directed
Supply,Delivery and fixing of CI Manhole including all charges etc.,Completed
Supply and fixing of Openwell submersible pumpset 75lpm x 150m depth
THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Provision fo EPL
Earth work excavating and depositing on bank with initial lead of 10 metre and initial lift of 2 metre in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard specification
Cost and supply of 90 mm PVC pipes 6kg/cm2 including all Charges etc..,Completed
Labour charges for Laying and jointing of 90 mm pvc pips with specials Including all Charges etc.,Completed
Refilling the pipe line trenches with excavted earth after the pipes are laid including all charges etc.,Completed
Provision for PEDESTAL
Earth work excavation in all strata for laying pipes including refillinig charges etc. complete as directed by TWAD Bd officers
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying and filling of conveyed earth with a lead of 5Km for basement filling
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supply and delivery of MS Kiosk of size 0.75m x 0.45m x 0.75m made up of MS angle of size 50mm x 50mmx 4mm alround covered with 16 gauge MS sheet and kiosk door made up of MS plates of size 25 mm x 3 mm including cutting, welding, grinding, locking arrangements and labour charges etc.
Provision fo Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.59 MB
BOQ_796115.xls
BOQ • 0.29 MB
tbid8.pdf
Tender Documents • 0.51 MB
PB8.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid