| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC NOT AVAILABLE | ₹15.7 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹15.8 LRejected-AOC | ₹15.8 L | L2 | Rejected-AOC 2nd Lowest Bidder |
| Sl No | Description | Qty | Unit | M/s. Sundaramandco L2 | JEEVAENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Installation of vertical bored cast in-situ Double under Reamed pile of 300mm diameter in all types of soil using Design Mix concrete of grade M30 with OPC cement, fine aggregate, 20mm and downgraded HBGS jelly coarse aggregate. The rate includes cost of Reinforcement and binding wire, fabrication, welding charges, placing of reinforcement cage in borehole in correct position, cost of boring to the required depth with Bentonite solution with Temporary casing of required length, conveyance of materials and pouring concrete including all tools and plants shifting the plants and equipments from one point to another. Excavation of mud pits for circulation of Bentonite solution, closing the mud pits to the original level and mud removal with initial lead and lift but including dismantling the concrete above the cut off level etc complete as directed by the Departmental officers. To carry a safe working load not less than than specified, excluding the cost of steel reinforcement but including the Bentonite solution, machinary and labour charges etc., all complete. | 34 | RM | 1,395 ₹47,430 | 1,393 ₹47,362 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete SS.20B 10 cum | 17 | cum | 125 ₹2,125 | 120 ₹2,040 Lowest |
| 3.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 4 | cum | 1,820 ₹7,276.36 | 1,811 ₹7,240.38 Lowest |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 4 | cum | 5,695 ₹22,768.61 | 5,687 ₹22,736.63 Lowest |
| 5.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 5.10 | a) Plinth beam | 52 | sqm | 302 ₹15,704 | 300 ₹15,600 Lowest |
| 5.20 | b)Columns | 14 | sqm | 1,420 ₹19,880 | 1,416 ₹19,824 Lowest |
| 5.30 | c)Retaining wall | 215 | sqm | 920 ₹1,97,800 | 919 ₹1,97,585 Lowest |
| 6.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 40 | cum | 8,400 ₹3,36,037.8 | 8,399 ₹3,35,997.8 Lowest |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 3,201 | kg | 96 ₹3,07,296 | 95 ₹3,04,095 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Commissioner, Thiruverkadu Municipality
Municipal office, Thiruverkadu, Chennai
Construction of Rcc Compound wall at Koladi Dumping yard in ward no.04
2026_MAWS_659233_14
1245/2025/E1
Open Tender
Civil Works
Works
Municipal office, Thiruverkadu, Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
19 Aug 2026
17 Feb 2026
20 Feb 2026
17 Feb 2026
20 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of vertical bored cast in-situ Double under Reamed pile of 300mm diameter in all types of soil using Design Mix concrete of grade M30 with OPC cement, fine aggregate, 20mm and downgraded HBGS jelly coarse aggregate. The rate includes cost of Reinforcement and binding wire, fabrication, welding charges, placing of reinforcement cage in borehole in correct position, cost of boring to the required depth with Bentonite solution with Temporary casing of required length, conveyance of materials and pouring concrete including all tools and plants shifting the plants and equipments from one point to another. Excavation of mud pits for circulation of Bentonite solution, closing the mud pits to the original level and mud removal with initial lead and lift but including dismantling the concrete above the cut off level etc complete as directed by the Departmental officers. To carry a safe working load not less than than specified, excluding the cost of steel reinforcement but including the Bentonite solution, machinary and labour charges etc., all complete. | 34 | RM | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete SS.20B 10 cum | 17 | cum | - | - |
| 3 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 4 | cum | - | - |
| 4 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 4 | cum | - | - |
| 5Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 5.1 | a) Plinth beam | 52 | sqm | - | - |
| 5.2 | b)Columns | 14 | sqm | - | - |
| 5.3 | c)Retaining wall | 215 | sqm | - | - |
| 6 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 40 | cum | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 3,201 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
BOQ_790949.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].