Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC 15 KALAINAGAR 3RD STREET MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.7 L+₹13,642 (5.25%)Rejected-AOC NO 5D AGILA NAGAR 5TH CROSS EXTENSION GANAPATHY NAGAR SOUTH EXTENSION THIRUVANAIKOVIL TRICHY 5 | TRICHY | TRICHY | TAMIL NADU | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S RAMANATHAN L2 | PARIS CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling the Damaged Reinforced Cement Concrete and cleaning away from the site etc complete | 5 | M3 | 4,532.75 ₹22,663.76 | 4,306.55 ₹21,532.73 Lowest |
| 2.01 | Earth work excavation in all kinds of soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial lead of 10m etc., and lift of 2m etc., complete. | 13 | M3 | 216.29 ₹2,811.79 | 205.5 ₹2,671.46 Lowest |
| 3.01 | Supplying and filing in foundation and basement with Quarry Dust in layers of 15 cm thick well rammed and consolidation including watering complying with Std specification etc. | 5 | M3 | 440.71 ₹2,203.57 | 418.72 ₹2,093.6 Lowest |
| 4.01 | Plain cement concrete in 1:4:8 (one cement four sand and eight aggregates) with 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc., complete. | 7 | M3 | 5,539.18 ₹38,774.26 | 5,262.75 ₹36,839.23 Lowest |
| 5.01 | Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc., Complete : (RCC Column footing plinth beam and lintel side) using steel plate and angles, | 4 | M2 | 968.56 ₹3,874.22 | 920.22 ₹3,680.88 Lowest |
| 6.01 | Plain Cement concrete 1: 1 ½ : 3 (One cement one and half sand and three aggregates) with 20mm gauge machine broken gauge hard broken granite chips including curing and finishing etc., complete | 0.5 | M3 | 7,651.68 ₹3,825.84 | 7,269.82 ₹3,634.91 Lowest |
| 7.01 | Supplying and erecting centering for size and softest support for plain surface such as reinforced cement slap rectangular beams tee or L beams lintels bed blocks stair and landing slap landing beams, beams canopy etc., comp. in all any height (The retrieved materials should be taken back by the contractor). Bottom Only | 18.6 | M2 | 1,073.94 ₹19,975.37 | 1,020.35 ₹18,978.5 Lowest |
| 8.01 | Reinforced Cement concrete 1: 1 ½ : 3 (One cement one and half sand and three aggregates) with 20mm gauge machine broken gauge hard broken granite chips including curing and finishing etc., complete for R.C.C. item excluding the cost of reinforcement grills in position and centering shuttering etc. | 8 | M3 | 9,449.81 ₹75,598.49 | 8,978.22 ₹71,825.75 Lowest |
| 9.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate including the cost of steel for all works (the rate to include cost of binding wire also) | 640 | Kg | 96.68 ₹61,874.43 | 91.85 ₹58,786.59 Lowest |
| 10.01 | Add GST 18% | 1 | GST | 41,688.31 ₹41,688.31 | 39,607.86 ₹39,607.86 Lowest |
Tender Value
₹2.6 L
EMD Value
₹2,598
Closing Date
20 Mar 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Providing Ramp Arrangements of Minor Bridge across vereganur main Road in ward no. 41
2025_MAWS_528965_1
E3 / EST- 405/ 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,598
18 Dec 2025
4 Mar 2025
20 Mar 2025
4 Mar 2025
20 Mar 2025
4 Mar 2025
Amount
Dismantling the Damaged Reinforced Cement Concrete and cleaning away from the site etc complete
Earth work excavation in all kinds of soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial lead of 10m etc., and lift of 2m etc., complete.
Supplying and filing in foundation and basement with Quarry Dust in layers of 15 cm thick well rammed and consolidation including watering complying with Std specification etc.
Plain cement concrete in 1:4:8 (one cement four sand and eight aggregates) with 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc., complete.
Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc., Complete : (RCC Column footing plinth beam and lintel side) using steel plate and angles,
Plain Cement concrete 1: 1 ½ : 3 (One cement one and half sand and three aggregates) with 20mm gauge machine broken gauge hard broken granite chips including curing and finishing etc., complete
Supplying and erecting centering for size and softest support for plain surface such as reinforced cement slap rectangular beams tee or L beams lintels bed blocks stair and landing slap landing beams, beams canopy etc., comp. in all any height (The retrieved materials should be taken back by the contractor). Bottom Only
Reinforced Cement concrete 1: 1 ½ : 3 (One cement one and half sand and three aggregates) with 20mm gauge machine broken gauge hard broken granite chips including curing and finishing etc., complete for R.C.C. item excluding the cost of reinforcement grills in position and centering shuttering etc.
Supplying fabricating and placing in position of MS grills for reinforcement rate including the cost of steel for all works (the rate to include cost of binding wire also)
Add GST 18%
S RAMANATHAN (BID ID -1273717)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .