| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance Lottery winner |
| 2 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance L1 |
| 3 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance L1 |
| 4 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance L1 |
| 5 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance L1 |
Tender Value
₹10.0 L
EMD Value
₹99,742
Closing Date
24 Dec 2025, 3:00 pmClosed
CE,KMC
MOTIJHEEL
Improvement of Road and Drain From H/O Ram Prakash to Banshi Lal Jain via H/O Shivam Gupta at Saraswati Nagar in ward-87 under Zone-03
2025_NNKAN_1099049_1
457/AA-2/25-26
Open Tender
Civil Works
45 days
Zone-02
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,742
24 Jun 2026
15 Dec 2025
24 Dec 2025
15 Dec 2025
24 Dec 2025
15 Dec 2025
E/W Cutting and Filling or ion embankment in ordinary soil exavation to be done pits not exciding 1.5 m including all completion of work.
Earth work in Excavation in trenches for foundation pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charge with in a distance of 50 mtr.
Providing and Laying Cement Concrete(1:6:12,1 cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete,including cost of formwork in foundation and floors.
Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work
12mm thick Cement plaster 1;4 in single coat on both side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finishied even and smooth.
P/L rubber moulded interlocking concrete block with 80 mm thick ICBP having strength not less than 30kn/Sqm complete as per technical specification clause 1500.
Supply and Laying GSB including all completion of work.
Making of pedastal including all labour work.
Cartage of Earth up to 3Km including all completion of work.
Add 18% G.S.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.42 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2024486.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid