Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 CrAccepted-Finance | ₹1.7 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹1.7 Cr+₹39,774 (0.23%)Accepted-Finance | ₹1.7 Cr+₹39,774 (0.23%) | 2 | Accepted-Finance Accept |
| 3 | 3₹1.8 Cr+₹94,144 (0.54%)Accepted-Finance | ₹1.8 Cr+₹94,144 (0.54%) | 3 | Accepted-Finance Accept |
| 4 | 4₹1.8 Cr+₹1.1 L (0.64%)Accepted-Finance | ₹1.8 Cr+₹1.1 L (0.64%) | 4 | Accepted-Finance Accept |
| 5 | 5₹1.8 Cr+₹2.7 L (1.52%)Accepted-Finance | ₹1.8 Cr+₹2.7 L (1.52%) | 5 | Accepted-Finance Accept |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
30 Jun 2021, 11:00 amClosed
Deputy Conservator of Forest, UT, Chandigarh
Forest and Wildlife Department, 2nd floor, Paryavaran Bhawan, Madhya Marg, Sector 19B, Chandigarh
Plantation and its maintenance, clearance of fire line etc
2021_CHD_60277_1
FOR/21/829/09.06.2021
Open Tender
Composite Works
Item Rate
365 days
Chandigarh
As per tender document
6 documents required · 6 mandatory
₹0
₹1.8 L
27 Jul 2021
9 Jun 2021
30 Jun 2021
9 Jun 2021
30 Jun 2021
9 Jun 2021
9 Jun 2021 - 30 Jun 2021
Amount
Item with Detailed Specifications
Clearance & maintenance of Approach ways to silt retention dams at various points in Ambika & piplawali Beat,Nathewala Block, Nepli Range during 2021-2022
Clearance & maintenance of Approach ways to silt retention dams at various points in Tootanwali Beat,Nathewala Block, Nepli Range during 2021-2022
Maintenance of Road in Ambika and Piplanwala beats, Nathewala Block, Nepli Range during 2021-2022.
Maintenance of Road in Tootanwali beat, Nathewala Block, Nepli Range during 2021-2022.
Maintenance of tracking path in Tootanwali beat, Nathewala Block, Nepli Range during 2021-2022
Plantation of live hedge i.e. Arundo donex rhizomes along the bank of Nathewala main choe in Ambika beat Nathewala Block, Nepli Range during 2021-2022
Plantation of live hedge i.e. Arundo donex rhizomes along the bank of Nathewala main choe in Piplanwali beat Nathewala Block, Nepli Range during 2021-2022
Pantation of live hedge i.e. Arundo donex rhizomes along the bank of Nathewala main choe in Tootanwali beat Nathewala Block, Nepli Range during 2021-2022 Clearance and dressing of fire line in Tootanwali beat in Nathewala Block, Nepli Range during 2021-2022.
Clearance and dressing of fire line in Tootanwali beat in Nathewala Block, Nepli Range during 2021-2022.
Clearance and dressing of fire line in Ambika and Piplanwali beat in Nathewala Block, Nepli Range during 2021-2022
removal of alluvium of dam no – 5 bolianwala to retain the water for wildlife in tootanwali beat, nathewala block, nepli range during 2021-2022
Remvoal of harmful weeds i.e. Parthenium, aakash bel etc. in Ambika and Piplanwali beat, Nathewala Block, Nepli Range during 2021-2022
Watering to new plantation in Tootanwali beat, Natahewala Block, Nepli Range during 2021-2022
Watering to last two years old plantation in Tootanwali beat, Nathewala Block, Nepli Range during 2021-2022
Watering to new plantation in Ambika and Piplanwali beat, Nathewala Block, Nepli Range during 2021-2022
Watering to last two years old plantation in Ambika and piplanwali beat, Nathewala Block, Nepli Range during 2021-2022
Remvoal of harmful weeds i.e. Parthenium, aakash bel etc. in Tootanwali beat, Nathewala Block, Nepli Range during 2021-2022
Plantation and patch sowing work on hill top in Tootanwala beat in Nathewala Block, Nepli Range during 2021-2022
Plantation and patch sowing work on hill top in Piplanwala and Ambika beat , Nathewala Block, Nepli Range during 2021-2022
Vigilant duty in Ambika,Piplanwali and Tootanwali Beat, Nathewala Block, NepliRange, during 2021-2022.
Maintenance of last two years old plantation on hill top in Piplanwali and Ambika Beat, Nathewala Block, Nepli Range during 2021-2022
Maintenance of last two years old plantation on hill top in Tootanwali Beat, Nathewala Block, Nepli Range during 2021-2022.
removal of alluvium of dam no – 4 nathewala main choe to retain the water for wildlife in tootanwali beat, nathewala block, nepli range during 2021-2022.
Removal of alluvium of dam no-1 jugianwala to retain the water for wildlife in ambika beat, nathewala block, nepli range during 2021-2022
Opening of Nathewala main choe bed at various mandering points to avoid bank cutting in Ambika &piplanwali beats in Nathewala Block, Nepli Range during 2021-2022.
Vigilant duty during night time in Tootanwali, Piplanwali and Ambika Beat, Nathewala Block, Nepli Range, during 2021-2022
Opening of Nathewala main choe bed at various mandering points to avoid bank cutting in Tootanwali beats in Nathewala Block, Nepli Range during 2021-2022
2nd YEAR MAINTENANCE OF CAMPA PLANTATION PLANTED IN NATHEWALA BLOCK DURING 2019-2020 IN LIEU OF PERMISSION GRANTED TO REMOVE 108 NOS. TREES FOR DIVERSION OF 39.862 HA. OF FOREST LAND FOR P.G.I PROJECT DURING 2013-14,IN PIPLANWALI BEAT IN NATHEWALA BLOCK NEPLI RANGE DURING 2021-22
DILBAG SINGH AND COMPANY
MS SAHADAR ALI CONTRACTOR
ABDUL GAFUR AND COMPANY
JAMEEL KHAN AND COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .