| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.7 LAccepted-AOC MELAIYUR | L1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | L2₹97.8 L+₹3.1 L (3.23%)Rejected-Finance SIRKALI | NAGAPATTINAM | TAMIL NADU | 609504 | L2 | Rejected-Finance Highest Amount Quoted | |
| 3 | L3₹97.9 L+₹3.2 L (3.42%)Rejected-Finance MELANANGOOR KATHIRUPPU POST SIRKALI TALUK TAMIL NADU | L3 | Rejected-Finance Highest Amount Quoted | |
| 4 | L4₹98.5 L+₹3.8 L (4.01%)Rejected-Finance | L4 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹99.5 L
EMD Value
₹1 L
Closing Date
10 Jan 2025, 3:00 pmClosed
District Collector,mayiladuthurai
District Collector office,mayiladuthurai
Strenthening and 5 Year Maintance Of Road From Perunthottam Earikarai to thiruvengadu link Road (R - 1218) Km 0/0 - 2/650 At Mayiladuthurai district under NABARD XXX 2024-25
2024_RDTN_515011_1
DIPR/5603/TENDER/2024 dt 26.12.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Perunthottam
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹1 L
District Collector office,mayiladuthurai
11 Mar 2025
28 Dec 2024
10 Jan 2025
30 Dec 2024
10 Jan 2025
30 Dec 2024
30 Dec 2024
Amount
Strengthening and 5 Year Maintenance of Perunthottam Erikarai to Thiruvengadu Link Road (R-1218) Perunthottam Panchayat in Sirkali Block Km 0/0 - 2/650 At Mayiladuthuai district under NABARD XXX – 2024-25
Clearingthe light jungle including all labour charges for burrying and burning etc., complete.
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc
Side Berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for ,Km stone,
Const of RCC Pipe Culvert @ ch 1670 m
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of gritty gravel
Supplying and fixing of 0.9 m NP3 Pipe
Const of RCC Pipe Culvert @ ch 1913 m
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of gritty gravel
Supplying and fixing of 0.9 m NP3 Pipe
Provision for Name board
90 cm Equilateral triangle (Cautionary) sign Bord
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Dhanalakshmi R (BID ID -1227666)
VEL BUILDERS (BID ID -1230661)
S.Saravanan (BID ID -1230684)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .