Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.8 L+₹3,051.82 (1.10%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹2.8 L+₹3,051.82 (1.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-INC DOC |
Tender Value
₹2.8 L
EMD Value
₹8,310
Closing Date
12 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Fencing around graveyard at nagbal sogam B nr masjid shareef
2026_RDPR_319681_10
NIT NO 87 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹8,310
21 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
6 Aug 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & laying in position cement concrete of specified grade including curing excluding the cost of centring and shuttering all work upto plinth level (1:3:6 coarse sand 20mm nominal size stone agg.). | 8.25 | cum | - | - |
| 2 | Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete. | 37.5 | sqm | - | - |
| 3 | brick work with common burnt clay fps non modular bricks of class designaton 75 in foundation and plinth 1:6 mortar | 6.06 | cum | - | - |
| 4 | providin and laying of 40 mm coping over brick work in 1:2:4 using 20 mm NSA graded stone aggregates | 4.04 | sqm | - | - |
| 5 | Structural steel work in sigle\built up section fixed without connecting plates incl cutting , hosting, fixing in position & applying priemer coat of approved steel primer all complete. | 1,032.87 | kg | 138.2 | ₹1,42,742.63 |
| 6 | painting steel work with deluxe multi surface shade of required shade to give an even shade of 2 or more coats applied 0.90 litre per 10sqm over an under coated primer of approved brand and manufacture | 80 | sqm | 125.6 | ₹10,048 |
| 7 | Carriage of Materials by MT Graded Sand /Coarse Agg (Crusher Bajri ) for an avg lead 20 km | 11.14 | cum | 465.14 | ₹5,181.66 |
| 8 | Carriage of bricks from budgam mt avg lead of 120 km | 2,880 | no | 4.16 | ₹11,980.8 |
| 9 | Signboard/photographs | 1 | No | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1059719.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .