Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.8 LAccepted-AOC N A | PALWAL | HARYANA | 121004 | ₹4.8 L | L-1 | Accepted-AOC Bidder quoted a lowest rate in submitted Bids. |
| 2 | L-2₹5.0 L+₹23,658.38 (4.93%)Rejected-AOC NIL | ₹5.0 L+₹23,658.38 (4.93%) | L-2 | Rejected-AOC Bidder quoted a higher rate then L-1. |
| 3 | L-3₹5.5 L+₹69,098.94 (14.4%)Rejected-AOC NIL | ₹5.5 L+₹69,098.94 (14.4%) | L-3 | Rejected-AOC Bidder quoted a higher rate then L-1. |
Tender Value
₹4.6 L
EMD Value
₹4,576
Closing Date
2 Mar 2026, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer ED HPSEBL Amb
Tender for R/R of damaged 11/0.4 Kv DTR Structure due to heavy rains/storms
2026_HPSEB_129492_1
AED/207/2025-26
Open Tender
Electrical Works
Percentage
31 days
Sr. Executive Engineer ED HPSEBL Amb
Please refer a tender document.
2 documents required · 2 mandatory
₹590
₹4,576
12 May 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ERECTION PART 11/0.4KV, 25 KVA Sub-Station to 11/0.4kv,63 KVA Sub-Station | - | - | - | - |
| 2 | Erection of 63 kva S/Stn. Str.:- Dismentling of existing 11/0.4kv,25 kva Sub-Station and erection of 11/0.4kv,63 kva Sub-Station alongwith LT Distribution box , re-earthing, earthing conn. to T/F G.O Switch lightning etc. erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, complete in all respect. | 2 | Job | 23,860.95 | ₹47,721.9 |
| 3 | Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site | 2 | job | 13,333.33 | ₹26,666.66 |
| 4 | Supply PART 11/0.4KV,25 KVA Sub-Station to 11/0.4kv,63 KVA Sub-Station | - | - | - | - |
| 5 | Distribution Transformer (Ordinary) 11/0.4 KV, 63KVA (Provided By HPSEBL) | - | - | - | - |
| 6 | Pipe Earthing Set | 6 | Set | 1,477.14 | ₹8,862.84 |
| 7 | LT Distribution Panel Box | 2 | Set | 19,011.45 | ₹38,022.9 |
| 8 | Transformer Bed | 2 | Job | 61,904.76 | ₹1,23,809.52 |
| 9 | Full Clamp | 10 | No | 171.43 | ₹1,714.3 |
| 10 | Half Clamp for Cross Arm | 16 | No | 85.71 | ₹1,371.36 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
Bid207.rar
Tender Documents • 9.83 MB
BOQ_191468.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .