| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC lowest Rate quoted |
| 2 | L2₹1.1 Cr+₹5.0 L (4.90%)Rejected-Finance | ₹1.1 Cr+₹5.0 L (4.90%) | L2 | Rejected-Finance Higher Tenderer Rejected |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
22 Nov 2023, 3:00 pmClosed
Executive officer, Ilanji Town Panchayat
17/1 Vallam Road , Ilanji Ilanji
Construction of Flood protection wall and approach road at Thiruvilanji kumaran koil road in Ilanji Town Panchayat.
2023_DTP_385641_1
230/2023
Open Tender
Civil Works
Works
180 days
works
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
23 Aug 2024
4 Nov 2023
22 Nov 2023
4 Nov 2023
22 Nov 2023
4 Nov 2023
Earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (SS 20 B) etc., complete as per standard specification - 1m3 For Drainage
Plain cement concrete Using 1:4:8 mix ( One cement , four M- Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and erecting steel centering for sides and soffits including supports and strutting upto 3.29 m height for plain surface as RCC slabs, rectangular tee (or) elbeams, lintel, bed block stair case waist slab, landing slab, etc., complete as per standard specification - 10m2 as per TNDSS & Morth specification No:30 & 36
PCC Work
Providing dowel bars of 25mm dia mild steel hooked at top including drilling holes of 40mm in hard rock to a depth of 1.00m and including dowel bars of 25mm dia such a way that 1.00mis inside hard rock 1.00m above and bend up for 0.40m length hard rock level and will be embeded to the foundation footing and filling the gab of dowel holes with cement mortar 1:1 mix including cost of dowel bars handling charges fabrication charges including labour for fixing in position and bending to shape etc., complete
Supplying, fabricating and placing in position of mild steel or TMT rods, including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per SS. TNDSS NO: 97 V,VI (S6) VII (S6) VII-3
Reinforced Cement Concrete M25 Grade Mix (One part cement, one and half part M- Sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3.
Collection supply and filling of well gravel filling approved quarry including cost and Conveyance of all materials to site and all labour charges for filling etc., Complete
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Providing and Laying of Hot Applied Thermo Plastic Compound 2.5 mm Thick Inculding Reflectorising Glass Beads @250 GmsPer Sqm area, Thickness of 2.5mm Exculsive of Surface applied Glass Beads as per IRC 35 The Funished Surface to be Level Uniform and Free From Streaks and Holes etc Complete.
P.Vijayabalan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .