| 1 | L1₹9.5 CrAccepted-AOC 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | ₹9.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹9.5 Cr+₹4.6 L (0.49%)Rejected-AOC DHANI CHANDPUR BAWAL ROAD REWARI DHANI CHANDPUR BAWAL ROAD REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹9.5 Cr+₹4.6 L (0.49%) | L2 | Rejected-AOC Refunded |
| 3 | L3₹12.5 Cr+₹3.0 Cr (31.3%)Rejected-AOC VPO BERLA TEHSIL AND DISTT CHARKHI DADRI HARYANA | CHARKI DADRI | HARYANA | 127022 | ₹12.5 Cr+₹3.0 Cr (31.3%) | L3 | Rejected-AOC Refunded |
| 4 | Not Admitted-Fee/PreQual/Technical 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | - | - | Not Admitted-Fee/PreQual/Technical Others-As per DNIT Cpndition, the Bid is rejected due to your enlistment upto Rs. 1000.00 lacs and the tender for amounting to Rs. 1039.85 lacs |
Tender Value
₹10.4 Cr
EMD Value
₹20.8 L
Closing Date
7 Feb 2022, 3:00 pmClosed
Executive Engineer
Executive Engineer, PH.Engg. Division No.3 Narnaul at Ateli
AUGMENTATION OF WATER SUPPLYSCHEME CANAL BASED WATER WORKS AT BHALKI FOR 61 NO. VILLAGES TEHSIL ATELI MANDI, DISTRICT MOHINDERGARH. Construction of 3 IBS and 20 Village Boosting stations, laying the clear water DI Rising
2022_HRY_204175_1
SE PHE. Circle NNL No.28 dt. 04.01.2022
Open Tender
Civil Works
Works
365 days
Bhalkhi, Ateli
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹20.8 L
Yes
11 May 2022
17 Jan 2022
9 Feb 2022
17 Jan 2022
7 Feb 2022
17 Jan 2022
Amount
CLEAR WATER PUMPING MACHINERY Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame. Make: KSB, CRI, Kirlosker, Crompton Greeve, Lubi) 1.1) IBS - 8 ATELI RURAL BEGPUR 1.1.1) 900 LPM X 55 M. Head
Supply, erection, testing IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc. 2.1) 6mm2 3core
2.2 ) 10mm2 3core
Supply erection testing and commissioning of Flow Meter (KROHNE Make) with digital display of 150 mm i/d complete in all respect. (6 at IBS & 23 at Boosting stations)
Trenchless Crossing of Railway line- Crossing between Ateli Mandi - Narnaul through 500 mm i/d MS cashing pipe for 350 mm i/d carrier pipe line Boring / excavation including pit making at entry & exit point to the precise dimensions for the Launch of the specialized Auger boring machine in normal soil condition but not in Rock/Bolders/ any underground utility like foundation, water supply line coming in alignment or other underground obstructions complete in all respect including caution sign boards, signals, watching fencing, site clearance etc. i) For M.S. Pipe 500 mm i/d 10mm thick casing pipe.
Providing & insertion of 500 mm i/d M.S. Casing pipe 10 mm thick (Fe-330 grade) fabricated as per IS: 3589 of 1991 from steel plates conforming to IS 2062 of following sizes including cutting, beveling, grinding & radio graphically welding of pipes as per IS-1182 complete in all respect and also coating of inner & outer surface of casing pipe with high built epoxy paint to R.D.S.O. as per specification No. M&C/PCN.III/88 to a dry film thickness of 250 micron for protection against corrosion complete in all respect including cost & cartage of material to site of work and testing as per DNIT i) For 500mm i/d M.S. casing pipe 10 mm thick.
Insertion of DI carrier pipe of following sizes through hydraulic pushing system for water supply including stringing, jointing, cutting, and testing to the entire satisfaction of Engineer-in-charge complete in all respects. DI pipe will be supplied by the Department complete in all respect as per approved DNIT 350mm i/d D.I. i) D.I. pipe 350 mm i/d
Providing concrete block 1:1-1/2:3 on both ends to plug the annular space between casing and carrier pipe for 500mm i/d casing & 350 mm i/d carrier pipe complete in all respect
Provision for probe radar survey to check any underground obstruction before finalizing the alignment.
Operation & Maintenance Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. (Will be charged to A/mtc estimate)." Defect liability period (Operation only)
i) Operation & maintenance during 1st year
ii) Operation and maintenance during 2nd Year.
iii) Operation and maintenance during 3rd Year.
iv) Operation and maintenance during 4th Year.
v) Operation and maintenance during 5th Year.
Bidder Name
Amount
M/S SHREE BALAJI BUILDERS(GSTN-NA)
Rakesh Yadav Contractor(GSTN-NA)
OM PARKASH CONT(GSTN-NA)
M/S SHREE BALAJI BUILDERS
OM PARKASH CONT
Rakesh Yadav Contractor
OM PARKASH CONT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
90894587.htm
Tender Document • 0.03 MB
90894588.htm
Tender Document • 0.03 MB
90894589.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .