| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹30.3 L+₹59,911 (2.01%)Rejected-AOC NICHUPATY BOLPUR P WEST BENGAL BIRBHUM PIN 731204 | BOLPUR | BIRBHUM | WEST BENGAL | 731204 | L2 | Rejected-AOC Being L2 Bidder | |
| 3 | L3₹30.4 L+₹69,178 (2.33%)Rejected-Finance NICHUPATTY BOLPUR BIRBHUM | BIRBHUM | WEST BENGAL | 713129 | L3 | Rejected-Finance Being L4 Bidder | |
| 4 | L4₹30.5 L+₹79,162 (2.66%)Rejected-Finance | L4 | Rejected-Finance Being L4 Bidder |
Tender Value
Refer Docs
EMD Value
₹55,200
Closing Date
27 Mar 2021, 6:55 pmClosed
Executive Engineer,PWD,Birbhum Electrical Division
Laldighipara, P.O. SuriDist. Birbhum. Pin. 731101 Near Suri Sadar Hospital
Temporary El Work, PA System and CCTV work for Construction of Strong Rooms, EVM Commissioning Rooms, DCRC, Counting at various site of Bolpur,Birbhum in connection with GENERAL ELECTION to WBLA-2021.
2021_WBPWD_330248_1
BIRED/65/e-Q (1st call) of 2020-2021
Open Tender
ELECTRICAL WORKS ORG
Item Rate
7 days
DCRC Bolpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹55,200
6 Oct 2021
20 Mar 2021
30 Mar 2021
20 Mar 2021
27 Mar 2021
20 Mar 2021
Amount
PART - A: ELECTRICAL INSTALLATION WORKS
SUB HEAD-1. Construction of Strong Rooms, EVM Commissioning Rooms, Mock Poll Rooms, Counting Rooms, Lobbies & Campus Security Light- including MAINTENANCE. (FROM 13/04/2021 TO 07/05/2021---- 25 DAYS
Providing on hire basis cubical pannel with following switch on suitable size angle iron frame including providing inter connections wiring with socketing, earthing attachment etc. & dismantling the same at the end of the function as per direction of E.I.C. a)500V,125A,TPNIC Main Switch-------1No b)200A,4Bar Busbar Chamber-------1No c)500V,125A,Changeover Switch------1No d)500V,63A,TPNIC Main Switch------3No e)500V,32A,TPNIC Main Switch--------3No
Supply& Providing on hire basis 500V, 12 way 32A/way TPN MCBDB with earthing attachment & dismantling at the end of the programmed.
Supply& Providing on hire basis 220V, 12 way 32A/way SPN MCBDB with earthing attachment & dismantling at the end of the programmed.
Providing on hire basis for main line wiring with 1.1 KV grade PVC/ A Aluminum cable incl-uding laying in trench below ground level or in air as required including dismantling and mend-ing good the damages to original finish. a) 3.5 core 50sqmm PVC/A cable
b) 4 core 16sqmm PVC/A cable
c)2 core 6/10sqmm PVC/A cable
S&Providing on hire basis 3x1.5sq.mm single core stranded copper at different location and dismantling at end of the programme.
S & . Providing on hire basis following light fittings on ground/wall/ceiling/ temporary structure pole as per direction of E.I.C./available safety provision & making all connection as required also change the fuse lamp & dismantling. a) 250 Volt, 36/40 watt Fluorecent tube light with fittings
b) 50 W LED bulb with pendent holder.
c) 11 W LED Pendent Light
d) 400watts S.V / Metal Flood Light fitting
e) 100 W LED flood light fittings
Supply& Providing on hire basis Pedestal Fan
Supply& Providing on hire basis Ceiling Fan
Providing on hire basis iron beam fan clamp
S& Providing on hire basis socket and switch. S& Providing on hire basis 2X15 Amps socket and 2X15 Amps switch.
S& Providing on hire basis 2X5 Amps socket and 2X5 Amps switch.
Temporary earthing arrangement the hole system as per G.S.( Earthing by spike/rod)
Providing & Fixing on hire basis only ABC type (4Kg.) fire extinguishers on wall with necessary MS bracket including mending good damages and dismantling
Add 2% on cost of installed materials (from item No 03 to 21 for 22 days) after 3rd days of installation ie 4th day onwards subjected to rate variation depending upon actual measurement and number of installed days.
Hiring charges of 220V, 2TR capacity split A.C Machine having all its accessories with indoor unit and outdoor unit. All electrical connection are to be done by suitable rating of MCB control and wiring in between cooling & condensing unit by suitable size of PVC insulated flex copper cable incl. necy. inter connection. [4 No. AC Machines x 25 days= 100 unit]
Charges for installation of 220V, 2TR split type AC machines (Indoor and outdoor unit) as per site requirement including S&F suitable size heavy gauge copper pipe line from indoor to outdoor unit inluding keno foam insulation of elctrical line form indoor unit to outdoor unit, PVC drain pipe and gas charging if required. Including dismantling the same.
Supply & Providing on hire basis 3 phase D.G. set. a) 62.5KVA 3Phase ( 1 no. DG.x 25 days)= 25 Units
Cost of the running fuel of the above generator for load shading period and testing period.
Charge for Labour for operation AC machine & 1no D.G. set for 1 person in each shift in round the clock for 21 days. Technician ( Skilled) 25 Dasy x 1 person x 3 Shifts)=75 Shifts
D.G.Operator (Semi Skilled) ( 1 no. DG. X 25 days x 1person x 3 shifts )= 75 Shifts
Charges for labour for temporary electrical maintenance work for 2 persons (1 Electrician and 1 Helper) in each shift in 1 sites round the clock for 25 days as per direction of E.I.C. a. Electrician (Semi Skilled) (25 days x 1person x 3 shifts )= 75 Shift
b. Helper (Unskilled) (25 days x 1person x 3 shifts )= 75 Shift
Carring charges for all materials incl. D.G set, A.C from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(60 km x 2 = 120 km x [03 nos vechile]=360 km)
Hiring charges of Electric Desert Cooler (USHA-70 Ltr) / (Orient Electric- 70 Ltr.)/Crompton-75 Ltr.) [4 No. Machines x 25 days= 100 unit]
SITC of 2.2 Ton split type A.C.machime having the following specification & feutures a) Cooling capacity nominal (BTU /HR): 24000 b) Star Rating -5 star c) Rated Voltage-220 V + / -5%, Frequency -50 Hz d) Compressor type- Rotary e) Mini. Room Discharge Air Flow Rate-28 CM/min f) Refrigrant: R-410 f) Cordless Remote Arrangement with all modernized provision of temperature setting , Fan speed option ( Low. Medium /High ) Auto Swing incld 3mtr incoming wire cable , fixing of remote holder & 16 A Plug Top & outer wall angle base for outdoor unit. (Make :- MITSUBISHI HEAVY INDUSTRIES/O-GENERAL) [As per choice of EIC]
Supply & fixing of 18 mm & 8 mm heavy gauge copper pipe line from indoor unit to outdoor unit including of keno foam insulation of electrical line from indoor unit to outdoor unit with 4 X 2.5 Sq.mm copper wire cable.
Supply & fixing 19 mm dia nylon reinforced 40 PVC pipe for Drain out the water from cooling unit duly saddled on the wall as per choice of EIC.
SUB HEAD-2. DCRC (6 DAYS) AT BOLPUR HIGH SCHOOL & BOLPUR COLLEGE and PARKING AT DAK BUNGALOW MAIDANS (2NOS) and Parking at Sriniketan road.
Providing on hire basis cubical pannel with following switch on suitable size angle iron frame including providing inter connections wiring with socketing, earthing attachment etc. & dismantling the same at the end of the function as per direction of E.I.C. a)500V,125A,TPNIC Main Switch-------1No b)200A,4Bar Busbar Chamber-------1No c)500V,125A,Changeover Switch------1No d)500V,63A,TPNIC Main Switch------3No e)500V,32A,TPNIC Main Switch--------3No
Providing on hire basis for main line wiring with 1.1 KV grade PVC/ A Aluminum cable incl-uding laying in trench below ground level or in air as required including dismantling and mend-ing good the damages to original finish. a) 3.5 core 95/70 sqmm PVC/A cable
b) 3.5 core 50sqmm PVC/A cable
c) 3.5 core 35sqmm PVC/A cable
d) 4 core 16sqmm PVC/A cable
e)2 core 6/10sqmm PVC/A cable
S&Providing on hire basis 3x1.5sq.mm single core stranded copper at different location and dismantling at end of the programme
Supply& Providing on hire basis 500V, 12 way 32A/way TPNMCBDB with earthing attachment & dismantling at the end of the programme.
Supply& Providing on hire basis 220V, 12 way 32A/way SPN MCBDB with earthing attachment & dismantling at the end of the programme.
Supply& Providing on hire basis 500V, 200A Changeover switch with earthing attachment & dismantling at the end of the programme.
S & Providing on hire basis following light fittings on ground/wall/ceiling/temporary structure pole as per direction of E.I.C./available safety provision & making all connection as required also change the fuse lamp & dismantling. a) 50 W LED bulb with pendent holder.
b) 400watts S.V / Metal Flood Light fitting
c) 36/40 watt Fluorecent tube light fittings
d) 100 W LED flood light fittings
e) 11 W LED bulb with pendent holder.
Supply& Providing on hire basis Pedestal Fan
Supply& Providing on hire basis Ceiling Fan
Supply& Providing on hire basis iron beam fan clamp
S& Providing on hire basis 2X15 Amps socket and 2X15 Amps switch.
S& Providing on hire basis 3X5 Amps socket and 3X5 Amps switch.
S& Providing on hire basis Tower (25 feet) making with ST pole, Sal or Bamboo for installation of S.V./ Metal Halide etc at Vehicle parking area as per direction of E.I.C
Temporary earthing arrangement the hole system as per G.S.( Earthing by spike/rod)
Providing & Fixing on hire basis only ABC type (4Kg.) fire extinguishers on wall with necessary MS bracket including mending good damages and dismantling
Add 2% on cost of installed materials (from item No 37 to 59) after 3rd days of installation ie 4th day onwards subjected to rate variation depending upon actual measurement and number of installed days.
Hiring charges of 415V, 4TR capacity Tower A.C Machine having all its accessories with indoor unit (TOWER TYPE) and outdoor unit. All electrical connection are to be done by suitable rating of MCB control and wiring in between cooling & condensing unit by suitable size of PVC insulated flex copper cable incl. necy. inter connection. (FOR 6 DAYS X 4 NOS AC machine = 24 sets)
Charges for installation of 415V, 4TR tower type AC machines (Indoor and outdoor unit) as per site requirement including S&F suitable size heavy gauge copper pipe line from indoor to outdoor unit inluding keno foam insulation of elctrical line form indoor unit to outdoor unit, PVC drain pipe and gas charging if required. Including dismantling the same.
Supply & Providing on hire basis 3 phase D.G. set. a) 62.5KVA 3Phase( Silence ) ( 2 No. of DG set x 6 days)= 12 Units
b) 125KVA 3Phase( Silence ) (2No. of DG set x 6 days)= 12 Units
Cost of the running fuel of the above generator for load shading period and testing period.
Charge for Labor for operation A.C Machines for 1 person in each shift in round the clock for 4 days. A.C. Technician (Skilled) (6 day x 1person x 3 shift )= 18 shift
Charge for Labor for operation 1no D.G. set for 1 person in each shift in round the clock for 4 days.D.G.Operator (Semi Skilled) (4 nos DG set x 6 days x 1person x 3 shifts )= 72 Shifts
Charges for labour for temporary electrical maintenance work for 3 persons (1 Electrician and 2 Helper) in each shift in 1 sites round the clock for 6 days as per direction of E.I.C. a. Electrician (Semi Skilled) (6 days x 1person x 3 shifts x 4 sites )= 72 Shifts
b. Helper (Unskilled) (6 days x 2person x 3 shifts x 4 sites )= 144 Shifts
Carring charges for all materials incl. D.G set, A.C from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(60 km x 2 = 120 km x [6 nos vechile]=720 km)
SUB HEAD-3. COUNTING (7 DAYS) AT BOLPUR COLLEGE
S&Providing on hire basis 3x1.5sq.mm single core stranded copper at different location and dismantling at end of the programme
Supply& Providing on hire basis 500V, 12 way 32A/way TPNMCBDB with earthing attachment & dismantling at the end of the programme.
S & . Providing on hire basis 250 Volt, 400watt S.V /Metal flood light fittings on ground & pole as per direction of E.I.C. & making all connection as required also change the fuse lamp & dismantling. a) 50 W LED bulb with pendent holder.
b) 36/40 watt Fluorecent tube light fittings
c) 100 W LED flood light fittings
S& Providing on hire basis 2X15 Amps socket and 2X15 Amps switch.
S& Providing on hire basis 3X5 Amps socket and 3X5 Amps switch.
Supply& Providing on hire basis Ceiling Fan with fan clamp
Supply& Providing on hire basis Pedestal Fan
Temporary earthing arrangement the hole system as per G.S.( Earthing by spike/rod)
Providing & Fixing on hire basis only ABC type (4Kg.) fire extinguishers on wall with necessary MS bracket including mending good damages and dismantling
Charges for labour for temporary electrical maintenance work for 2 persons (1 Electrician and 1 Helper) in each shift in 1 sites round the clock for 6 days as per direction of E.I.C. a. Electrician (Semi Skilled) (7 days x 1person x 3 shifts x 1 sites )= 21 Shifts
b. Helper (helper) (7 days x 1person x 3 shifts x 1 sites )= 21 Shifts
Add 2% on cost of installed materials (from item No 72 to 82) after 3rd days of installation ie 4th day onwards subjected to rate variation depending upon actual measurement and number of installed days.
Hiring charges of 415V, 4 TR capacity split A.C Machine having all its accessories with indoor unit (TOWER TYPE) and outdoor unit. All electrical connection are to be done by suitable rating of MCB control and wiring in between cooling & condensing unit by suitable size of PVC insulated flex copper cable incl. necy. inter connection. (FOR 5 DAYS X 4 NOS AC machines= 20sets)
Charges for installation of 415V, 4TR tower type AC machines (Indoor and outdoor unit) as per site requirement including S&F suitable size heavy gauge copper pipe line from indoor to outdoor unit inluding keno foam insulation of elctrical line form indoor unit to outdoor unit, PVC drain pipe and gas charging if required. Including dismantling the same.
Supply & Providing on hire basis 3 phase D.G. set. a) 125 KVA 3Phase (5 days x 1 no DG set)=5 units
Charge for Labor for operation A.C machines for 1 person in each shift in round the clock for 6 days. A.C. Technician (Skilled) (7 days x 1person x 3 shift )= 21 shift
Charge for Labor for operation 1no D.G. set for 1 person in each shift in round the clock. D.G.Operator (Semi Skilled) (1 no D.G. set x 1person x 3 shift x 7day )= 21 shift
Carring charges for all materials incl. D.G set, A.C from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(60 km x 2 = 120 km x [3 nos vechile]=360 km)
PART---B. PA SYSTEM ARRANGEMENT
SUB HEAD-1. Construction of Strong Rooms, Lobbies including MAINTENANCE. (FROM 13/04/2021 TO 07/05/2021----25 DAYS
Supply and providing of following accessories for PA system on hire basis including making all conection and commissining with high satisfaction for the entire occation Horn unit (along with 3 x 1.5 wire)
12" speaker Box (along with 3 x 1.5 wire)
PA amplifier (100W/ 120W)
PA amplifier (500W)
PA microphone with table/ Floor stand
Add 2% more after 3 days ie 4th day onwards from item No 94 to 98 only for 22 days
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(40 km x 2 = 80 km x [1 nos vechile]=80 km)
Charges for labour for maintenance work of temporary PA SYSTEM for 1 persons (1 Semi Skilled operator ) in each shift in 1 sites round the clock for 25 days as per direction of E.I.C. a. Semi Skilled operator (1 person x 1site x 25 days x 2shift) = 50 shift
b. Helper (Unskilled) (1 person x 1site x 25 days x 2shift) = 50 shift
SUB HEAD-2. EVM Commissioning only ( 5 DAYS)
Supply and providing of following accessories for PA system on hire basis including making all conection and commissining with high satisfaction for the entire occation 12" speaker Box (along with 3 x 1.5 wire)
PA amplifier (100W/ 120W)
PA microphone with table/ Floor stand
Add 2% more after 3 days ie 4th day onwards from item No 104 to 106 only for 2 day (approx)
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(40 km x 2 = 80 km x [1 nos vechile]=80 km)
Charges for labour for maintenance work of temporary PA SYSTEM for 1 persons (1 Semi Skilled operator ) in each shift. a. Semi Skilled operator (1 person x 5 days x 2shift X 4 rooms) = 40 shift
b. Helper (Unskilled) (1 person x 5 days x 2shift X 4 rooms) = 40 shift
SUB HEAD-3. DCRC AT BOLPUR HIGH SCHOOL & BOLPUR COLLEGE and PARKING AT DAK BUNGALOW (6 DAYS)
Supply and providing of following accessories for PA system on hire basis including making all conection and commissining with high satisfaction for the entire occation Horn unit (along with 3 x 1.5 wire)
12" speaker Box (along with 3 x 1.5 wire)
PA amplifier (100W/ 120W)
PA amplifier (500W)
PA microphone with table/ Floor stand
Add 2% more after 3 days ie 4th day onwards from item No 112 to 116 for 3 day (approx)
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(40 km x 2 = 80 km x [1 nos vechile]=80 km)
Charges for labour for maintenance work of temporary PA SYSTEM for 1 persons (1 semi Skilled operator ) in each shift in 1 sites round the clock for 6 days as per direction of E.I.C. a. semi Skilled operator (1 person x 3 sites x 6 days x 2shift) = 36 shift
b. Helper(unskilled) (1 person x 3 sites x 6 days x 2shift) = 36 shift
SUB HEAD-4. Counting only (7 DAYS)
Supply and providing of following accessories for PA system on hire basis including making all conection and commissining with high satisfaction for the entire occation. Horn unit (along with 3 x 1.5 wire)
PA amplifier (100W/ 120W)
PA amplifier (500W)
PA microphone with table/ Floor stand
Add 2% more after 3 days ie 4th day onwards from item No 122 to 125 for 4 days approx .
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(40 km x 2 = 80 km x [1 nos vechile]=80 km)
Charges for labour for maintenance work of temporary PA SYSTEM for 2 persons (1 semi-Skilled operator + 1 helper ) in each shift in 1 sites round the clock for 5 days as per direction of E.I.C. a. semi-Skilled operator (1 person x 7 days x 3shift) = 21 shift
b. Helper (Unskilled) (1 person x 7 days x 3shift) = 21 shift
PART--C. CCTV ARRANGEMENT
SUB HEAD-1. Construction of Strong Rooms, Lobbies including MAINTENANCE.
Providing on hire basis 2 Megapixel IP66 IR Bullet/Dome Camera, 3.6 mm lens,30 meters IR distance,12VDC CPPLUS.
Providing on hire basis of 2 Amp 12 volt Power supply UPS system.
Providing on hire basis of others fittings (Switch,Patch Panel, Patch Cord, Power Jack, 4X4 Box, etc.)
Providing on hire basis with stand 32"/42'/56"' Full HD Smart LED Display (Samsung/LG/Equivalent)
Providing on hire basis of CPU with motherboard.(Assemble)
Supply & Laying of CAT6 cable with 20mm & 40mm PVC Conduit pipe on the surface of the wall & 1 inch & 1.5 inch dalda Pipe for overhead.
External Hard Disc ( 1TB capacity) for CCTV footage storage and deposited to SDO / DM office.
Add 2% more after 3 days ie 4th day onwards from item No 132 to 137 for 22 days
Charges for labour for temporary CCTV network maintenance work for 2 persons (1 Semi Skilled operator and 1 Helper) in each shift in 1 sites round the clock for 25 days as per direction of E.I.C. a.Semi Skilled operator (1 person x 1site x 25days x 2shift) = 50 shift
b. Helper (1 person x 1site x 25days x 2shift) = 50 shift
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(50 km x 2 = 100 km x [1 nos vechile]=100 km)
SUB HEAD-2. EVM Commissioning only ( 5 DAYS)
Providing on hire basis 2 Megapixel IP66 IR Bullet/Dome Camera, 3.6 mm lens,30 meters IR distance,12VDC CPPLUS.
Providing on hire basis of 2 Amp 12 volt Power supply UPS system.
Providing on hire basis of others fittings (Switch,Patch Panel, Patch Cord, Power Jack, 4X4 Box, etc.)
Providing on hire basis with stand 32"/42'/56"' Full HD Smart LED Display (Samsung/LG/Equivalent)
Providing on hire basis of CPU with motherboard.(Assemble)
Supply & Laying of CAT6 cable with 20mm & 40mm PVC Conduit pipe on the surface of the wall & 1 inch & 1.5 inch dalda Pipe for overhead.
External Hard Disc ( 1TB capacity) for CCTV footage storage and deposited to CM Secuirity/DIB.
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(50 km x 2 = 100 km x [1 nos vechile]=100 km)
Charges for labour for temporary CCTV network maintenance work for 2 persons (1 Skilled operator) in each shift as per direction of E.I.C. a. Skilled operator (1 person x 1site x 5days x 2 shift) =10 shift
b.Helper (1 person x 1site x 5days x 2 shift) =10 shift
Add 2% more after 3 days ie 4th day onwards from item No 144 to 149 for 2 days (approx)
SUB HEAD-3. DCRC AT BOLPUR HIGH SCHOOL & BOLPUR COLLEGE and PARKING AT DAK BUNGALOW (6 DAYS)
Providing on hire basis 2 Megapixel IP66 IR Bullet/Dome Camera, 3.6 mm lens,30 meters IR distance,12VDC CPPLUS.
Providing on hire basis of 2 Amp 12 volt Power supply UPS system.
Providing on hire basis of others fittings (Switch,Patch Panel, Patch Cord, Power Jack, 4X4 Box, etc.)
Providing on hire basis with stand 32"/42'/56"' Full HD Smart LED Display (Samsung/LG/Equivalent)
Providing on hire basis of CPU with motherboard. (Assemble)
Supply & Laying of CAT6 cable with 20mm & 40mm PVC Conduit pipe on the surface of the wall & 1 inch & 1.5 inch dalda Pipe for overhead.
Providing on hire basis with stand 32"/42''/56"' Full HD Smart LED Display (Samsung/LG/Equivalent) (DCRC)
External Hard Disc ( 1TB capacity) for CCTV footage storage and deposited to SDO / DM office.
Charges for labour for temporary CCTV network maintenance work for 2 persons (1 Semi Skilled operator and 1 Helper) in each shift in 1 sites round the clock for 6 days as per direction of E.I.C. a. Semi Skilled operator (1 person x 2site x 6 days x 2shift) = 24 shift
b. Helper (Unskilled) (1 person x 2site x 6days x 2shift) =24shift
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(50 km x 2 = 100 km x [1 nos vechile]=100 km)
Add 2% more after 3 days ie 4th day onwards from item No 156 to 162 for 3 days (approx)
SUB HEAD-4. Counting only (7 DAYS)
Providing on hire basis 2 Megapixel IP66 IR Bullet/Dome Camera, 3.6 mm lens,30 meters IR distance,12VDC CPPLUS.
Providing on hire basis of 2 Amp 12 volt Power supply UPS system.
Providing on hire basis of others fittings (Switch,Patch Panel, Patch Cord, Power Jack, 4X4 Box, etc.)
Providing on hire basis with stand 32"/42'/56"' Full HD Smart LED Display (Samsung/LG/Equivalent)
Providing on hire basis of CPU with motherboard.(Assemble)
Supply & Laying of CAT6 cable with 20mm & 40mm PVC Conduit pipe on the surface of the wall & 1 inch & 1.5 inch dalda Pipe for overhead.
Add 2% more after 3 days ie 4th day onwards from item No 169 to 174 for 4 days (approx)
External Hard Disc ( 2TB capacity) for CCTV footage storage and deposited to SDO / DM office.
Carring charges for all materials from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.(50 km x 2 = 100 km x [1 nos vechile]=100 km)
Charges for labour for temporary CCTV network maintenance work for 2 persons (1 Semi Skilled operator and 1 Helper) in each shift in 1 sites round the clock for 40 days as per direction of E.I.C. a.Semi Skilled operator (1 person x 1site x 7 days x 3shift) =21 shift
b. Helper (Unskilled) (1 person x 1site x 7 days x 3shift) =21 shift
PART - D (Service Connection)
Charges for service connection from WBSEDCL for different venues
NARAYAN CHANDRA DAS
MOON LIGHT
MODERN ENGINEERING ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .