Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹12.9 L+₹7,228.43 (0.56%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹13.2 L+₹39,784.29 (3.10%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹13.5 L+₹64,038.23 (4.99%)Accepted-Finance H NO 02 NEAR GOVT BOYS SR SEC SCHOOL 121102 | PALWAL | HARYANA | 121102 | L4 | Accepted-Finance ok | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.2 L
EMD Value
₹15,150
Closing Date
21 Mar 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
C.C.Palwal
Pucca work
2022_HRY_211697_1
703-733/25A
Open Tender
Civil Works
Item-rate/Agreement basic
45 days
Palwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹15,150
Yes
16 May 2022
10 Mar 2022
22 Mar 2022
10 Mar 2022
21 Mar 2022
11 Mar 2022
90 days
Amount
Demolishing brick work manually/mechanical means including stacking of servicable material and disposable of unservicable material with 50mts lead as per direction of engineer incharge (in cement mortar) HSR no. 5.7.4
Earth work in excavation by mechanical means (hydraulic excavator excavated/ manual means over areas (exceeding 30 cm in depth,1.5 mtr in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 mtr and lift upto 1.5 mtr as directed by Engineer in charge. HSR item no 4.12.1
Available of Earth filling excavated earth HSR no. 4.32
Excavating ,supplying and filling of local earth (including royality) by mechanical transport upto a lead of 1 km. also including ramming and watering the earth in layers HSR 4.33
Providing and laying non pressure NP-3 class (medium duty ) RCC Pipes includingn collars / spigot jointed with stiff mixtures of cement mortars in the proportion of 1:2 including testing of joints etc.HSR item no 22.169.3
providing and laying of brick on edge flooring with bricks of class designation 7.5 on a bed 12mm cement mortar,incluidng filling the joint with same mortar ,with common burnt clay non modular bricks 1:6 (HSR item 10.33.2)
Providing and laying in position cement concrete1:4:8 of specified grade excluding the cost of centering and shuttering HSR item 6.1.6
Brick work with common burnt clay modulular bricks of class designation 7.5 in foundation in plinth in cement mortar 1:6 (HSR item 7.20.2)
Providing and laying in position cement concrete1:3:6 of specified grade excluding the cost of centering and shuttering HSR item 6.1.4
Brick work with common burnt clay modulular bricks of class designation 7.5 in foundation in plinth in cement mortar 1:3 (HSR item 7.20.1)
Providing and laying in position machine batched and machine mix design M-25 grade cement concrete for RCC work,using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of shuttering,finishing and reinforcement. (HSR ITEM 6.25.1)
Providing and laying in position cement concrete 1:2:4 of specified grade excluding the cost of centering and shuttering HSR item 6.1.2
Pointing on brickwork or brick flooring with cement mortar 1:3 raised and cut pointing. HSR item no.11.25.2
Centering and shuttering including strutting, propping etc and removal of form for lintels,beams,plinth beams,girders.(HSR item 6.30.5)
Centering and shuttering including strutting, propping etc and removal of form for columns,pillers,piers,abutments,posts and struts.HSR item no 6.30.6
finishing walls with primium acrylic smooth exterior with paint silicon additives of required shades HSR item 11.96.1
Providing weep holes in brick masonary/ plain /RCC abutment /wing wall/retaining wall wiyh 100 mm dia AC pipe extended through the full width of the structure with slope of 1V:20 horizontal towards drawing froce, complete as per drawing and MoRT&H specifications.HSR item 27.15
Steel reinforcement for RCC work,where not included in the complete rate of RCC,including straightening,cutting, bending, placing in position,binding ,wastage,overlaps,welded joints,spacer bars,chairs,stays,hangers and annealedsteel wire etc.complete in all respect above plinth level.HSR item no 6.34.3
Credit of pipe
Credit of brickbats
The Swamika Cooperative Labour and Construction Society Ltd.
THE BHUSHAN CO. OP L and C SOCIETY LTD. BAHIN
The Tewatia Co-op. L&C Society Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .