| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78,649.77Accepted-AOC | ₹78,649.77 | L1 | Accepted-AOC Accepted |
| 2 | L2₹78,887.76+₹237.99 (0.30%)Rejected-AOC | ₹78,887.76+₹237.99 (0.30%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RAVIRAJ CONSTRUCTION H2 | M MAHESWARAN H1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling RCC by manual / by using deploying
machineries labour charges etc., complete as per standard specification - | 0.99 | M3 | 4,308 ₹4,286.46 Lowest | 4,310 ₹4,288.45 |
| 1.02 | Dismantling Plain Cement Concrete labour charges etc., complete as per standard specification - | 3 | Cum | 486 ₹1,458 Lowest | 490 ₹1,470 |
| 1.03 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | 5,297 ₹5,297 Lowest | 5,300 ₹5,300 |
| 1.04 | Plain Cement Concrete 1:2:4 (one cement two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification - | 4 | M3 | 6,671 ₹26,684 Lowest | 6,675 ₹26,700 |
| 1.05Providing centering shuttering including necessary supports for all PCC works including all charges etc., complete as per standard specifications. For Slab | |||||
| 1.06 | Slab | 6 | M2 | 868 ₹5,206.26 Lowest | 868 ₹5,206.26 Lowest |
| 1.07 | Side wall | 12 | M2 | 494 ₹5,928 Lowest | 494 ₹5,928 Lowest |
| 1.08 | Suppling and fabrication placing in position of M.S.(or)RTS rod for required size and length as directed by the departmental officers approved design including bending cutting tying and cost of binding wire cost and conveyance of all materials to site etc. complete as per standard specification | 180 | Kg | 89 ₹16,020 Lowest | 90 ₹16,200 |
| 1.09 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) | 1.5 | M3 | 8,291 ₹12,395.05 Lowest | 8,291 ₹12,395.05 Lowest |
| 1.10 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 2.5 | sqm | 550 ₹1,375 Lowest | 560 ₹1,400 |
Tender Value
₹1.3 L
EMD Value
₹1,250
Closing Date
10 Mar 2026, 3:00 pmClosed
Commissioner
Rathinam Nagar, Sivakasi Corporation office
Construction of RCC Culvert at ward 17 at Kathan sandhu in Sivakasi City Municipal Corporation
2026_MAWS_670817_1
3001/2025/E1
Open Tender
Civil Works
Works
Sivakasi Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,250
Yes
22 Jul 2026
5 Mar 2026
10 Mar 2026
5 Mar 2026
10 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling RCC by manual / by using deploying
machineries labour charges etc., complete as per standard specification - | 1 | M3 | 256.8 | ₹255.52 |
| 1.02 | Dismantling Plain Cement Concrete labour charges etc., complete as per standard specification - | 3 | Cum | 1,863.8 | ₹5,591.4 |
| 1.03 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | 686.8 | ₹686.8 |
| 1.04 | Plain Cement Concrete 1:2:4 (one cement two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification - | - | M3 | 623.4 | - |
| 1.05 | Providing centering shuttering including necessary supports for all PCC works including all charges etc., complete as per standard specifications. For Slab | - | - | - | - |
| 1.06 | Slab | 6 | M2 | 256.8 | ₹1,540.29 |
| 1.07 | Side wall | 12 | M2 | 1,863.8 | ₹22,365.6 |
| 1.08 | Suppling and fabrication placing in position of M.S.(or)RTS rod for required size and length as directed by the departmental officers approved design including bending cutting tying and cost of binding wire cost and conveyance of all materials to site etc. complete as per standard specification | 180 | Kg | 686.8 | ₹1,23,624 |
| 1.09 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) | - | M3 | 623.4 | - |
| 1.1 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_806168.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_806168.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .