| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹43.8 L+₹6.2 L (16.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹47.3 L+₹9.7 L (25.9%)Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical BOT ELIGIBLE |
| Sl No | Description | Qty | Unit | Romesh Chander L2 | PAWAN KUMAR L3 | Rajeshwar singh L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 mtr, including getting out excavated earth and disposal of surplus excavated earth as directed within 1 mtr from cutting edge. All kinds of soil. | 392.4 | CUM | 200 ₹78,480 | 120 ₹47,088 | 100 ₹39,240 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering (all works up to plinth level) in 1:5:10(1 cement:5 coarse sand 10 graded stone aggregate 40mm nominal size) | 49.05 | CUM | 1,500 ₹73,575 Lowest | 3,000 ₹1,47,150 | 2,574 ₹1,26,254.7 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering (all works up to plinth level) in 1:3:6(1 cement: 3 coarse sand 6 graded stone aggregate 20 mm nominal size) | 441.15 | CUM | 4,000 ₹17,64,600 | 4,500 ₹19,85,175 | 3,674 ₹16,20,785.1 Lowest |
| 4.00 | Providing & laying Damp proof course 40mm thick using cement concrete 1:2:4. (1 Cement: 2 Coarse Sand : 4 graded stone aggregate 12.5mm nominal size) | 327 | Sqm | 250 ₹81,750 Lowest | 250 ₹81,750 Lowest | 250 ₹81,750 Lowest |
| 5.00 | 12mm thick Cement Plaster 1:6 (1cement : 6 coarse sand). | 1,635 | Sqm | 200 ₹3,27,000 Lowest | 200 ₹3,27,000 Lowest | 200 ₹3,27,000 Lowest |
| 6.00 | Supplying at site angle iron post and strut of required size including bottom to be split and bent at right angles in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc. complete | 5,014.57 | Kg | 85 ₹4,26,238.45 | 98.5 ₹4,93,935.15 | 74 ₹3,71,078.18 Lowest |
| 7.00 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
Made of G.I. wire of dia 4 mm | 1,308 | Sqm | 700 ₹9,15,600 | 700 ₹9,15,600 | 515 ₹6,73,620 Lowest |
| 8.00 | Fencing with Angle Iron Posts placed at required distance embedded in cement concrete blocks every 15 th posts last but one end post and corner post shall be strutted on both sides and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire of weighing 9.38 kg/100 mtr (min) between two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earthwork and concrete work to be paid separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire. | 3,270 | Rmt | 15 ₹49,050 Lowest | 15 ₹49,050 Lowest | 15 ₹49,050 Lowest |
| 9.00 | Centering and shuttering including removal of forms for foundations, footings, bases of columns etc. | 2,289 | Sqm | 150 ₹3,43,350 | 100 ₹2,28,900 Lowest | 100 ₹2,28,900 Lowest |
| 10.00 | Filling available excavated earth in trenches side of foundations etc. | 85.83 | Cum | 150 ₹12,874.5 | 50 ₹4,291.5 Lowest | 150 ₹12,874.5 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
16 Feb 2021, 4:00 pmClosed
Ex. Engineer SIDCO Construction Division Kathua
Office of Executive Engineer, SIDCO Construction Division Kathua
Providing Chain Link Fencing to periphery of proposed new Industrial Estate, at Village Pretha, Tehsil Basohli, District Kathua RD 00 to 1090 Mtr
2021_SIDCO_115901_1
e-NIT No 01 of 2020-21 dated 05-02-202
Open Tender
Civil Works
Item Rate
45 days
KATHUA
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,500
Yes
Executive Engineer, SIDCO Construction Div. Kathua
₹1.2 L
Yes
9 Mar 2021
9 Feb 2021
17 Feb 2021
9 Feb 2021
16 Feb 2021
9 Feb 2021
Amount
Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 mtr, including getting out excavated earth and disposal of surplus excavated earth as directed within 1 mtr from cutting edge. All kinds of soil.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering (all works up to plinth level) in 1:5:10(1 cement:5 coarse sand 10 graded stone aggregate 40mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering (all works up to plinth level) in 1:3:6(1 cement: 3 coarse sand 6 graded stone aggregate 20 mm nominal size)
Providing & laying Damp proof course 40mm thick using cement concrete 1:2:4. (1 Cement: 2 Coarse Sand : 4 graded stone aggregate 12.5mm nominal size)
12mm thick Cement Plaster 1:6 (1cement : 6 coarse sand).
Supplying at site angle iron post and strut of required size including bottom to be split and bent at right angles in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc. complete
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4 mm
Fencing with Angle Iron Posts placed at required distance embedded in cement concrete blocks every 15 th posts last but one end post and corner post shall be strutted on both sides and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire of weighing 9.38 kg/100 mtr (min) between two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earthwork and concrete work to be paid separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire.
Centering and shuttering including removal of forms for foundations, footings, bases of columns etc.
Filling available excavated earth in trenches side of foundations etc.
Clearing Jungle including uprooting of rank vegetation/grass/trees, brush wood and saplings of girth upto 30 cm at height of 1 mtr above level and removal of rubbish upto a distance of 50 mtr outside the periphery of the area cleared.
Carriage of material by Mechanical Transport:
Carriage of Sand for 50 Km
Carriage of Aggregate for 78 Km
Romesh Chander
PAWAN KUMAR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .